Loading...
HomeMy WebLinkAboutSubdivision Plan 102019OWNER WALTER N. WAINWRIGHT, JR 149 GREAT NECK ROAD WATERFORD, CT 06385 APPLICANT SUNMAR / RAF BUILDERS, LLC 511 MOHEGAN AVENUE PARKWAY QUAKER HILL, CT 06375 PROPERTY INFO: ADDRESS: 1100 EAST LAKE ROAD MONTVILLE ASSESORS MAP 7 -LOT 32-10 AREA: 72.39 ACRES OWNER: WALTER N. WAINWRIGHT, JR DEED REFERENCE: VOLUME 633 -PAGE 170 SUBDIVISION PLAN m0 b 61% b b P 0awsm--m h: I -- - 0 iqk: A 1100 EAST LAKE RD MONTVILLE, CT OCTOBER.,.?019 Sorom" red TURNER PROPERTY r s5 tipf Ep RD TOWS KEY MAP SCALE: 1" = 1000' 0\%J01111afta®!'® ico . • s. % . ADVANCED SURVEYS, LLC. = .... - W O E I HAVE REVIEWED THE SUBJECT PROPERTY AND AFTER A CAREFUL G 25 Apple Lane Colchester CT. 06415 INSPECTION.I HAVE DELINEATED THE INLAND WETLANDS & AS --NOTE pp WATERCOU SES AS SHOWN ON THIS PLAN. Alm T B SE Phone & Fax (860) 267-5979 UR 3 roiiz cs MARK H. SULLIVAN, C.P.S.S. DATE RICHARD A. DESCHAMPS SHEET NO._ DESCRIPTION 1 COVER SHEET 2 BOUNDARY - LOT LAYOUT & TOPOGRAPHY 3 CONCEPTUAL DEVELOPMENT PLAN - LOTS 192,3,4 4 CONCEPTUAL DEVELOPMENT PLAN - LOTS 5,6,798 5 CONCEPTUAL DEVELOPMENT PLAN - LOT 9 6 NOTES - DETAILS - E & S CONTROLS 7 SOILS DATA & SANITARY INFORMATION IELIEF, HIS MAP IS SUBSTANTIALLY CORRECT ISN VALID WITHOUT A LIVE SIGNATURE 0 THE RVEYOR HEREON. L.S.#70019 f TE APPROVED BY THE TOWN OF MONTVILLE PLANNING & ZONING COMMISSION CHAIRMAN OR SECRETARY DATE APPROVED BY THE TOWN OF MONTVILLE INLAND WETLANDS WATERCOURSE COMMISSION CHAIRMAN OR SECRETARY DATE APPROVED BY THE UNCAS HEALTH DISTRICT SIGNATURE DATE DATE OF COMPLETION OF ALL WORK SIGNATURE DATE PASSIVE SOLAR ENERGY TECHNIQUES AS PRESCRIBED BY LAW HAV BEEN CONSIDERED IN DEVELOPMENT OF THIS PLAN SIGNATURE DATE 2gp T RC"'PVTI- 280' LINE OF SIGHT (TYP.) 280' LINE OF SIGHT (TYP.) PAVED DRIVEWAY APRON 25 MPH SPEED LIMIT) / TO STREETLINE (TYP.) VOL. VOLUME v PG. PAGE PROPOSED WELL N/F NOW OR FORMERLY S.F. SQUARE FEET DHDH DRILL HOLE MON MONUMENT IPIN IRON PIN REC. RECOVERED SNET SOUTHERN NEW ENGLAND TELEPHONE STONE WALL 330- - - EXISTING CONTOUR v PROPOSED CONTOUR PROPOSED WELL u- - - -u- - PROPOSED UTILITIES PROPOSED SILT FENCE BARRIER FD PROPOSED FOOTING DRAIN D DECK IRON PIN OR DRILL HOLE TO BE SET MONUMENMT TO BE SET IIIII#Iojol F 0046 ., De S 1OTt lili44'' D A. DESCHAMPS THIS MAP IS SUBSTANTIALLY CORRECT OT VALID WITHOUT A LIVE SIGNATURE SURVEYOR HEREON. L.S. #700 DATE N/F JOSEPH AQUITANTE, JR. VOL. 249 PG. 731 N/F ALBERT E. MENCARELLI VOL. 489 PG. 1043 LOT DEVELOPMENT NOTES: 1. IMPROVEMENTS DEPICTED ON THIS PLAN ARE CONCEPTUAL ONLY AND ARE INTENDED TO DEMONSTRATE LOT DEVELOPMENT FEASIBILITY. INDIVIDUAL SITE DEVELOPMENT PLANS WILL BE REQUIRED TO OBTAIN PERMITS FOR CONSTRUCTION. ANY DEVEATION OF THE PROPOSED IMPROVEMENTS SHOWN MAY REQUIRE APPROVALS FROM THE TOWN OF MONTVILLE INLAND WETLANDS & WATERCOURSES COMMISSION. 2. PASSIVE SOLAR ENERGY TECHNIQUES AS PRESCRIBED BY LAW HAVE BEEN CONSIDERED IN THE DEVELOPMENT OF THIS PLAN. 3. ALL PROPOSED UTILITY CONNECTION SHALL BE COORDINATED WITH THE GOVERNING UTILITY AUTHORITY. 4. ALL DRIVEWAYS SHALL HAVE A PAVED APRON INSTALLED TO THE STREETLINE. DRIVEWAYS GRADED OVER 10% SHALL BE PAVED. 5. ADDITIONAL TEST HOLES MAY BE REQUIRED AT THE TIME OF LOT DEVELOPMENT. A PERC TEST IS REQUIRED IN THE RESERVE AREA ON EACH LOT AT THE TIME OF LOT DEVELOPMENT. 6. ALL LOTS REQUIRE AN ENGINEERED SEPTIC SYSTEM DESIGN PLAN. 7. ALL VEGETATION BETWEEN THE FACE OF STONE WALL AND THE WESTERLY EDGE OF EAST LAKE ROAD IS TO BE REMOVED. FR F,F, ,qPT ,TT LOT 1609995 S.F.-L 3.70± AC.) NOT PART OF,SUBDIVISION) J J WL#130 280' LINE OF SIGHT (TYP.) 25 MPH SPEED LIMIT) PAVED DRIVEWAY APRON TO STREETLINE (TYP.) LOT DEVELOPMENT NOTES: 1. IMPROVEMENTS DEPICTED ON THIS PLAN ARE CONCEPTUAL ONLY AND ARE INTENDED TO DEMONSTRATE LOT DEVELOPMENT FEASIBILITY. INDIVIDUAL SITE DEVELOPMENT PLANS WILL BE REQUIRED TO OBTAIN PERMITS FOR CONSTRUCTION. ANY DEVEATION OF THE PROPOSED IMPROVEMENTS SHOWN MAY REQUIRE APPROVALS FROM THE TOWN OF MONTVILLE INLAND WETLANDS & WATERCOURSES COMMISSION. 2. PASSIVE SOLAR ENERGY TECHNIQUES AS PRESCRIBED BY LAW HAVE BEEN CONSIDERED IN THE DEVELOPMENT OF THIS PLAN. 3. ALL PROPOSED UTILITY CONNECTION SHALL BE COORDINATED WITH THE GOVERNING UTILITY AUTHORITY. 4. ALL DRIVEWAYS SHALL HAVE A PAVED APRON INSTALLED TO THE STREETLINE. DRIVEWAYS GRADED OVER 10% SHALL BE PAVED. 5. ADDITIONAL TEST HOLES MAY BE REQUIRED AT THE TIME OF LOT DEVELOPMENT. CLEAR ALL VEGETATION, STONEWALLS AND GRADE A PERC TEST IS REQUIRED IN THE RESERVE AREA ON EACH LOT AT THE TIME OFTONEWSTREETLINEALONGEASTLAKEROADASLOTDEVELOPMENT. REQUIRED TO ACHIEVE 280' 6. ALL LOTS REQUIRE AN ENGINEERED SEPTIC SYSTEM DESIGN PLAN. SIGHT DISTANCES (TYP.) 7. ALL VEGETATION BETWEEN THE FACE OF STONE WALL AND THE WESTERLY EDGE OF EAST LAKE ROAD IS TO BE REMOVED. Jr\ SNET #NET CROSS CULVERT IS NOT IN USE AND PROVIDE DRIVEWAY CROSS CULVERTAPPEARSTOBEABANDONED36LF-15" RCP W/ FLARED END UNITS2 2$0'80, 1 & 80SF OF MODIFIED RIP -RAP ON EACH SIDE PROVIDE NON -TRACKING CONSTRUCTION ENTRANCE TYP.) (SEE DETAIL) I 1 I r I 1 l I I I I w r i VOL. VOLUME PG. r i r i SQUARE FEET DH DRILL HOLE r MONUMENT i IRON PIN i RECOVERED SNET SOUTHERN NEW ENGLAND TELEPHONE STONE WALL FR F,F, ,qPT ,TT LOT 1609995 S.F.-L 3.70± AC.) NOT PART OF,SUBDIVISION) J J WL#130 280' LINE OF SIGHT (TYP.) 25 MPH SPEED LIMIT) PAVED DRIVEWAY APRON TO STREETLINE (TYP.) LOT DEVELOPMENT NOTES: 1. IMPROVEMENTS DEPICTED ON THIS PLAN ARE CONCEPTUAL ONLY AND ARE INTENDED TO DEMONSTRATE LOT DEVELOPMENT FEASIBILITY. INDIVIDUAL SITE DEVELOPMENT PLANS WILL BE REQUIRED TO OBTAIN PERMITS FOR CONSTRUCTION. ANY DEVEATION OF THE PROPOSED IMPROVEMENTS SHOWN MAY REQUIRE APPROVALS FROM THE TOWN OF MONTVILLE INLAND WETLANDS & WATERCOURSES COMMISSION. 2. PASSIVE SOLAR ENERGY TECHNIQUES AS PRESCRIBED BY LAW HAVE BEEN CONSIDERED IN THE DEVELOPMENT OF THIS PLAN. 3. ALL PROPOSED UTILITY CONNECTION SHALL BE COORDINATED WITH THE GOVERNING UTILITY AUTHORITY. 4. ALL DRIVEWAYS SHALL HAVE A PAVED APRON INSTALLED TO THE STREETLINE. DRIVEWAYS GRADED OVER 10% SHALL BE PAVED. 5. ADDITIONAL TEST HOLES MAY BE REQUIRED AT THE TIME OF LOT DEVELOPMENT. CLEAR ALL VEGETATION, STONEWALLS AND GRADE A PERC TEST IS REQUIRED IN THE RESERVE AREA ON EACH LOT AT THE TIME OFTONEWSTREETLINEALONGEASTLAKEROADASLOTDEVELOPMENT. REQUIRED TO ACHIEVE 280' 6. ALL LOTS REQUIRE AN ENGINEERED SEPTIC SYSTEM DESIGN PLAN. SIGHT DISTANCES (TYP.) 7. ALL VEGETATION BETWEEN THE FACE OF STONE WALL AND THE WESTERLY EDGE OF EAST LAKE ROAD IS TO BE REMOVED. Jr\ SNET #NET CROSS CULVERT IS NOT IN USE AND PROVIDE DRIVEWAY CROSS CULVERTAPPEARSTOBEABANDONED36LF-15" RCP W/ FLARED END UNITS2 2$0'80, 1 & 80SF OF MODIFIED RIP -RAP ON EACH SIDE PROVIDE NON -TRACKING CONSTRUCTION ENTRANCE TYP.) (SEE DETAIL) IVOL. VOLUME PG. PAGE N/F NOW OR FORMERLY S.F. SQUARE FEET DH DRILL HOLE MON MONUMENT IPIN IRON PIN REC. RECOVERED SNET SOUTHERN NEW ENGLAND TELEPHONE STONE WALL 330— — — EXISTING CONTOUR PROPOSED CONTOUR PROPOSED WELL ul — — u. — PROPOSED UTILITIES PROPOSED SILT FENCE BARRIER FD PROPOSED FOOTING DRAIN DECK IRON PIN OR DRILL HOLE TO BE SET Mi ONUMENMT TO BE SET tktj r®t r t,. IQEsc? , W BE F, HIS MAP IS SUBSTANTIALLY CORRECT iIS NIA IS N T VALID WITHOUT A LIVE SIGNATURE SEAL FNHE URVEYOR HEREON. tilt% n DESCHAMPS L.S. #70019 DA PT#4 THS D LEGEND: VOL. VOLUME PG. PAGE N/F NOW OR FORMERLY S.F. SQUARE FEET DH DRILL HOLE MON MONUMENT IPIN IRON PIN REC. RECOVERED SNET SOUTHERN NEW ENGLAND TELEPHONE STONE WALL 330— — — EXISTING CONTOUR 30 PROPOSED CONTOUR PROPOSED WELL PROPOSED UTILITIES 5 • it PROPOSED SILT FENCE BARRIER v cn: FD PROPOSED FOOTING DRAIN TONY KNW E LIEF, MAP IS SUBSTANTIALLY CORRECT AS '90, TE*' IS OT VALID WITHOUT A LIVE SIGNATURE DECK AL OFTH SURJEYOR HEREON. IRON PIN OR DRILL HOLE TO BE SET I fPfiliifittiA t / MONUMENMT TO BE SET RICHARb A. DESCHAMPS L.S. #70019 , ATE ; LOT DEVELOPMENT NOTES: 1. IMPROVEMENTS DEPICTED ON THIS PLAN ARE CONCEPTUAL ONLY AND ARE INTENDED TO DEMONSTRATE LOT DEVELOPMENT FEASIBILITY. INDIVIDUAL SITE DEVELOPMENT PLANS WILL BE REQUIRED TO OBTAIN PERMITS FOR CONSTRUCTION. ANY DEVEATION OF THE PROPOSED IMPROVEMENTS SHOWN MAY REQUIRE APPROVALS FROM THE TOWN OF MONTVILLE INLAND WETLANDS & WATERCOURSES COMMISSION. 2. PASSIVE SOLAR ENERGY TECHNIQUES AS PRESCRIBED BY LAW HAVE BEEN CONSIDERED IN THE DEVELOPMENT OF THIS PLAN, 3. ALL PROPOSED UTILITY CONNECTION SHALL BE COORDINATED WITH THE GOVERNING UTILITY AUTHORITY. 4. ALL DRIVEWAYS SHALL HAVE A PAVED APRON INSTALLED TO THE STREETLINE. DRIVEWAYS GRADED OVER 10% SHALL BE PAVED. 5. ADDITIONAL TEST HOLES MAY BE REQUIRED AT THE TIME OF LOT DEVELOPMENT. A PERC TEST IS REQUIRED IN THE RESERVE AREA ON EACH LOT AT THE TIME OF LOT DEVELOPMENT. 6. ALL LOTS REQUIRE AN ENGINEERED SEPTIC SYSTEM DESIGN PLAN. 7. ALL VEGETATION BETWEEN THE FACE OF STONE WALL AND THE WESTERLY EDGE OF EAST LAKE ROAD IS TO BE REMOVED. EROSION AND SEDIMENT CONTROL REPORT: SUBDIVISION PLAN PREPARED FOR SUNMAR / RAF BUILDERS, LLC 1100 EAST LAKE ROAD MONTVILLE, CONNECTICUT REFERENCE IS MADE TO: 1. Connecticut Guidelines for Soil Erosion and Sediment Control - 2002. DEVELOPMENT: The proposed subdivision will allow for the creation of 9 new building lots ranging in size from 3.67 acres to 5.19 acres. All new proposed lots will be serviced by an on site septic system & well. Individual Site Development Plans will be required to obtain permits for construction. DEVELOPMENT SCHEDULE: Each lot will be developed by the individual lot owners. A typical construction sequence for each individual lot is as follows: 1. Secure all necessary local, state and federal permits. 2. Install anti -tracking pad at construction entrance. 3. Clear all vegetation within the proposed development area. 4. Strip topsoil and stockpile topsoil for future use. Surround stockpile with sediment fence. 5. Begin earthwork activities for driveway, house and sewage disposal system. 6. Install foundation and construct house. 7. Install well, sewage disposal system and utilities. 8. Rough grade driveway. Place and compact processed gravel, traffic bound gravel surface. Install paved apron per town requirements. 9. Install landscaping and loam all disturbed areas with minimum 4" topsoil, seed & mulch. 10. After all areas have been permanently stabilized and the zoning enforcement officer has certified to this all erosion control measures may be removed. DEVELOPMENT CONTROL PLAN: Prior to the commencement of operations in accordance with any permit issued by the Town ofMontville, the Contractor shall install all erosion and sediment control measures. The Contractor shall obtain a site inspection from the Zoning Enforcement Officer to ensure that all erosion and sediment control measures have been installed in accordance with this narrative. Upon certification with respect to the installation of erosion and sediment control measures, the Contractor may commence operations pursuant to the permit. Erosion and sediment control devices shall be installed in accordance with the "Filter Barrier Installation & Maintenance" and "Hay Bale Installation & Maintenance" sections of this narrative hereinafter contained. All stripping is to be confined to the immediate construction area. Topsoil shall be stockpiled so that slopes do not exceed 2 to 1. A haybale sediment barrier is to surround each stockpile and a temporary vegetative cover provided. Dust control will be accomplished by spraying with water and if necessary, the application of calcium chloride. The proposed planting schedule is to be adhered to during the planting of disturbed areas throughout the proposed construction site. Final stabilization ofthe site is to follow the procedures outlined in permanent vegetative cover. If necessary a temporary vegetative cover is to be provided until a permanent cover can be applied. During the stabilization period, all erosion and sediment control measures shall be maintained in proper working order. The Owner's representative shall be responsible for checking all erosion and sediment control measures on a twice -weekly basis during the stabilization period and after each storm event. During the stabilization period with respect to the site, any erosion which occurs within disturbed areas shall be immediately repaired, reseeded and restabilized. Once stabilization has been completed and certification thereof obtained in writing from the Town of Montville Building Department, erosion and sediment control measures shall be removed by the Contractor. If required proposed trees will be planted with the following precautions. 1. Trees and shrubs are to be planted in the spring. 2. Newly planted trees are to be staked and supported with guy wire. 3. Soil around trees and shrubs is to be thoroughly watered when dry and mulch provided around the base to prevent roots from drying out. Provide a depression at the base of all trees and shrubs to insure the water will be recieved. FILTER BARRIER INSTALLATION & MAINTENANCE: 1. Dig a 6" trench on the uphill side of the barrier location. 2. Position the posts on the downhill side of the barrier and drive the post 1.5 feet into the ground. 3. Lay the bottom 6" of the fabric in the trench to prevent undermining and backfill. 4. Inspect and repair barrier after heavy rainfall. 5. Sediment deposits are to be removed when they reach a height of one foot behind the barrier and are to be deposited in an area which is not regulated by the Inland Wetlands Commission. 6. Inspections and necessary repairs will be made twice weekly. HAY BALE INSTALLATION & MAINTENANCE: 1. Bales shall be placed around all proposed catch basins with the ends of the bales tightly abutting each other. 2. Each bale shall be securely anchored with at least 2 stakes and gaps between bales shall be wedged with straw to prevent water from passing between the bales. 3. Inspect bales after each storm and repair or replace promptly as needed. Remove sediment behind the bales when it has reached half the height of the bale and deposit in an area which is not regulated by the Inland Wetlands Commission. 4. Inspections and necessary repairs will be made twice weekly. TEMPORARY VEGETATIVE COVER: A temporary seeding of Rye Grass will be completed within 15 days ofthe formation of stockpile(s). If the soil in the stockpiles has been compacted by construction operations it shall be loosened to a depth of 2 inches before the fertilizer, lime and seed is applied. 10-10-10 fertilizer at a rate of 7.5 pounds per 1000 s.f. and lime stone at a rate of 90 lbs. per 1000 s.f. shall be used. Rye Grass applied at a rate of 1 lb. per 1000 s.f. shall provide the temporary vegetative cover. Straw or hay, free from weeds and coarse matter shall be used at a rate of 70-90 lbs. per 1000 s.f. as a temporary mulch. Apply mulch and drive tracked equipment up and down slope over entire surface so cleat marks are parallel to the contours. PERMANENT VEGETATIVE COVER: Topsoil will be replaced once the excavation has been completed and the shoulders are graded to a slope no greater than 3 to 1. Topsoil will be spread at a minimum compacted depth of 4 inches. Once the topsoil has been spread, all stones two inches or larger in any dimension will be removed as well as debris. Apply agricultural ground limestone at the rate of two tons per acre or 100 lbs. per 1000 s.f. Apply 10-10-10 fertilizer or equivalent at a rate of 300 lbs. per acre or 7.5 lbs. per 1000 s.f. Work lime and fertilizer into the soil to a depth of 4 inches. Inspect seedbed before seeding. If traffic has compacted the soil, retill compacted areas. Apply the following grass seed mix: Seed Mixture lbs./acre lbs/1000 s.£ Kentucky Bluegrass 20 .45 Creeping Red Fescue 20 .45 Perennial Rye Grass 5 .10 45 1.00 The recommended seeding dates are: April 1 - June 15 and August 1 - September 15 Following seeding, firm seedbed with a roller. Mulch immediately following seeding. If a permanent vegetative stand cannot be established by September 30, apply a temporary cover on the topsoil such as netting, mat or an organic mulch. t OF ROAD 0 Q CV a a PLAN 8" HIGHER THAN GUTTER t OF ROAD OR R.O.W. LINE t 6" HIGHER THAN GUTTER GUTTER I VARIES 1 10' 1 10' SAG CURVE IN DRIVE OF ROAD 6" HIGHER THAN GUTTER GUTTER VARIES t OR R.O.W. LINE CREST CURVE IN DRIVE DRIVEWAYS AT A 10% OR MORE SLOPE SHALL BE PAVED 8" BASE COURSE GRAVEL DRIVEWAY NOT TO SCALE FINISHED GRADE MILL ENTIRE TEMP. RESIDENTIAL DRIVEWAY DETAILSAPPLY HOT PAVEMENT PATCH AND 18" NEW 2" MIN. COMPACTED NOT TO SCALE O \ JOINT SEALER TO BEYOND PREVIOUS CLASS 2 BITUMINOUS CONCRETEALLMILLEDEDGESSAWCUTINALL DIRECTIONS PLACED IN A SINGLE LIFT O" O \ (WIDTH VARIES) GRANULAR BACK FILL / \ EXIST. ROAD SURFACE EXIST. ROAD SURFACE o \\ o 3'-0" MINIMUM \\\ APPLY TACK COATING BOTTOM 2" OF TEMP. O TO ALL MILLED SURFACES PATCH TO REMAIN PRIOR TO PAVING w 12' \\ NOTES; BITUMINOUS CONCRETE /\ ,,.:•;•. : EDGE OF 1. MILLING LINES SHALL BE 7 TRENCH STRAIGHT AND NEAT. DRIVEWAY \ FINE SAND ..: ...:.: q 2. HUMPING OF PERMENANT 1 ELECTRICAL, TELEPHONE AND \ PATCH SHALL WI BE 2" 2 1/2" CABLE TELEVISION SERVICE : ALLOWED. 1.2" 12" _ 3 CONSTRUCTED PATCH SHALL BE BE INDISTINGUISHABLE WHEN MIN MIN ` D CROSS-SECTION TRAVELING OVER IT BY MOTOR VEHICLE AT POSTED SPEED LIMIT. SHOULDER 6" PROCESSED BASE COURSE GRAVEL (MIN.) UTILITY TRENCH PAVEMENT REPAIR DETAIL N CROSS SECTION CROSS SCALETTO S SECTION BITUMINOUS CO CRETE DRIVES NOT TO SCALE NOT TO SCALE PAVED DRIVEWAY 4" CROSS SLOPE} FINISH GRADE- er 6%9c6lo FILTER II FABRIC ANGLE 100 UP SLOPE POST FOR STABILITY AND SELF CLEANING - 1111° 03 2" STONEkl& COMPACTED f r4t: BACKFILL r 24 11 SILT FENCE STONE SHOULDER_ NOT TO SCALE NOT TO SCALE CONSTRUCTION ENTRANCE NOT TO SCALE SRiI#BdIBl01/S i A. CO U cc L E i;, THIS MAP IS SUBSTANTIALLY CORRECT IS TOT VALID WITHOUT A LIVE SIGNATURE T7 SURVEYOR HEREON. e_- Ik ' A. DESCHAMPS L.S. #70019 DA TH#A - 0"-9" TOPSOIL 9"-21" SUBSOIL 21 "-36" VERY COMPACT GRAY SILTY SAND 36"-69" SAND & GRAVEL, ROCKS NO WATER, NO MOTTING, NO LEDGE ROOTS TO 23", RESTRICTIVE - 21" TH#B - 0"-7" TOPSOIL 7"-22" SUBSOIL 22"-30" VERY COMPACT GRAY SILTY SAND 30"-68" SAND & GRAVEL, ROCKS NO WATER, NO MOTTING, NO LEDGE ROOTS TO 2511, RESTRICTIVE - 22" TH#C - 0"-9" TOPSOIL 9"-22" SUBSOIL 22"-36" VERY COMPACT GRAY SILTY SAND 36"-68" SAND & GRAVEL, ROCKS NO WATER, NO MOTTING, NO LEDGE ROOTS TO 31 ", RESTRICTIVE - 22" TH#D - 0"-9" TOPSOIL 9"-23" SUBSOIL 23"-41" VERY COMPACT GRAY SILTY SAND 41 "-72" SAND & GRAVEL, ROCKS NO WATER, NO MOTTING, NO LEDGE ROOTS TO 23'", RESTRICTIVE - 23" TH#lA - 0"-9" TOPSOIL 9"-24" SUBSOIL 24"-38" VERY COMPACT GRAY SILTY SAND 38"-64" SAND & GRAVEL, STONE & ROCKS NO WATER, NO MOTTING, NO LEDGE ROOTS TO 35", RESTRICTIVE - 24" TH#1B - 0"-8" TOPSOIL 8"-34" SUBSOIL 34"-55" VERY COMPACT GRAY SILTY SAND 55"-75" SAND & GRAVEL NO WATER, NO MOTTING, NO LEDGE ROOTS TO 28", RESTRICTIVE - 34" TH#1C - 0"-7" TOPSOIL 7"-22" SUBSOIL 22"-42" VERY COMPACT GRAY SILTY SAND 42"-63" SAND & GRAVEL, STONE & ROCKS NO WATER, NO MOTTING, NO LEDGE ROOTS TO 35", RESTRICTIVE - 22" TH# 1 D - 0"-8" TOPSOIL 8"-22" SUBSOIL 22"-60" VERY COMPACT GRAY SILTY SAND NO WATER, NO MOTTING, NO LEDGE ROOTS TO 3811, RESTRICTIVE - 22" T f1T UI 4 BEDROOM RESIDENCE SLOPE 7.5% PERC RATE - V IN 8 MINUTES RECEIVING SOIL DEPTH (AVG.) 21" HF) 34 X (FF) 1.75 X (PF) 1.0 = 59.5' MLSS REQUIRED - 59.5' MLSS PROVIDED 60' 4 BEDROOM HOUSE REQUIRES 577.5 S.F. OF EFFECTIVE LEACHING AREA USE 60 FEET OF GEOMATRIX-GST 6212 (12" DEPTH) 60 X 10.0 = 600 S.F.) USE 1,250 GAL. 2 COMPARTMENT SEPTIC TANK W/ OUTLET FILTER DEVICE LOT #2 4 BEDROOM RESIDENCE SLOPE 13% PERC RATE - 1" IN 11 MINUTES RECEIVING SOIL DEPTH (AVG.) 23" HF) 26 X (FF) 1.75 X (PF) 1.25 = 56.9' MLSS REQUIRED - 56.9' MLSS PROVIDED 58' 4 BEDROOM HOUSE REQUIRES 577.5 S.F. OF EFFECTIVE LEACHING AREA US E58 FEET OF GEOMATRIX-GST 6212 (12" DEPTH) 58 X 10.0 = 580 S.F.) USE 1,250 GAL. 2 COMPARTMENT SEPTIC TANK W/ OUTLET FILTER DEVICE TH#2A - 0"-9" TOPSOIL 9"-26" SUBSOIL 26"-65" VERY COMPACT GRAY SILTY SAND NO WATER, NO MOTTING, NO LEDGE ROOTS TO 29", RESTRICTIVE - 26" TH#213 - 0"-11" TOPSOIL 11 "-29" SUBSOIL 29"-73" VERY COMPACT GRAY SILTY SAND NO WATER, NO MOTTING, NO LEDGE ROOTS TO 32", RESTRICTIVE - 291" TH#2C - 0"-7" TOPSOIL 7"-23" SUBSOIL 24"-63" VERY COMPACT GRAY SILTY SAND NO WATER, NO MOTTING, NO LEDGE ROOTS TO 2411, RESTRICTIVE - 23 "r TH#2D - 0"-7" TOPSOIL 7"-27" SUBSOIL 27"-69" VERY COMPACT GRAY SILTY SAND NO WATER, NO MOTTING, NO LEDGE ROOTS TO 2811, RESTRICTIVE - 27" TH#3A - 0"-9" TOPSOIL 9"-26" SUBSOIL 26"-74" VERY COMPACT GRAY SILTY SAND NO WATER, NO MOTTING, NO LEDGE ROOTS TO 30", RESTRICTIVE - 26" TH#3B - 0"-9" TOPSOIL 9"-28" SUBSOIL 28"-70" VERY COMPACT GRAY SILTY SAND NO WATER, NO MOTTING, NO LEDGE ROOTS TO 32", RESTRICTIVE - 28" TH#3C - 0"12" TOPSOIL 12"-23" SUBSOIL, STONES & ROCKS 23"-70" VERY COMPACT GRAY SILTY SAND NO WATER, NO MOTTING, NO LEDGE ROOTS TO 23", RESTRICTIVE - 23" TH#3D - 0"10" TOPSOIL 10"-24" SUBSOIL 24"-66" VERY COMPACT GRAY SILTY SAND NO WATER, NO MOTTING, NO LEDGE ROOTS TO 29", RESTRICTIVE - 24" T f1T 11 2 4 BEDROOM RESIDENCE SLOPE 6.5% PERC RATE - 1" IN 5 MINUTES RECEIVING SOIL DEPTH (AVG.) 26" HF) 30 X (FF) 1.75 X (PF) 1.0 = 52.5' MLSS REQUIRED - 52.5' MLSS PROVIDED 58' 4 BEDROOM HOUSE REQUIRES 577.5 S.F. OF EFFECTIVE LEACHING AREA USE 58 FEET OF GEOMATRIX-GST 6212 (12" DEPTH) 58 X 10.0 = 580 S.F.) USE 1,250 GAL. 2 COMPARTMENT SEPTIC TANK W/ OUTLET FILTER DEVICE LOT #4 4 BEDROOM RESIDENCE SLOPE 4.5% PERC RATE - 1" IN 8 MINUTES RECEIVING SOIL DEPTH (AVG.) 26" HF) 34 X (FF) 1.75 X (PF) 1.0 = 59.5' MLSS REQUIRED - 59.5' MLSS PROVIDED 60' 4 BEDROOM HOUSE REQUIRES 577.5 S.F. OF EFFECTIVE LEACHING AREA USE 60 FEET OF GEOMATRIX-GST 6212 (12" DEPTH) 60 X 10.0 = 600 S.F.) USE 1,250 GAL. 2 COMPARTMENT SEPTIC TANK W/ OUTLET FILTER DEVICE TEST HOLE DATA WITNESSED BY MICHAEL KIRBY UNCAS HEALTH DISTRICT - 7/18/18 TH#4A -0"-11" TOPSOIL 11 "-31" SUBSOIL, STONES & ROCKS 31 "-78" VERY COMPACT GRAY SILTY SAND NO WATER, NO MOTTING, NO LEDGE ROOTS TO 31 ", RESTRICTIVE - 31" TH#4B - 0"-10" TOPSOIL 10"-24" SUBSOIL, STONES & ROCKS 24"-69" VERY COMPACT GRAY SILTY SAND NO WATER, NO MOTTING, NO LEDGE ROOTS TO 2411, RESTRICTIVE - 24" TH#4C - 0"-12" TOPSOIL 12"-28" SUBSOIL, STONES & ROCKS 28"-63" VERY COMPACT GRAY SILTY SAND NO WATER, NO MOTTING, NO LEDGE ROOTS TO 3011, RESTRICTIVE - 28" TH#4D - 0"-10" TOPSOIL 10"-25" SUBSOIL, STONES & ROCKS 25"-72" VERY COMPACT GRAY SILTY SAND NO WATER, NO MOTTING, NO LEDGE ROOTS TO 251t, RESTRICTIVE - 25" TH#5A - 0"-10" TOPSOIL 10"-23" SUBSOIL, STONES & ROCKS 23"-66" VERY COMPACT GRAY SILTY SAND NO WATER, NO MOTTING, NO LEDGE ROOTS TO 2311, RESTRICTIVE - 23" TH#5B - 0"-9" TOPSOIL 9"-25" SUBSOIL, STONES & ROCKS 25"-76" VERY COMPACT GRAY SILTY SAND NO WATER, NO MOTTING, NO LEDGE ROOTS TO 251,, RESTRICTIVE - 25" TH#5C - 0"-10" TOPSOIL 10"-28" SUBSOIL, STONES & ROCKS 28"-77" VERY COMPACT GRAY SILTY SAND NO WATER, NO MOTTING, NO LEDGE ROOTS TO 2811, RESTRICTIVE - 28" TH#5D - 0"-11" TOPSOIL 11"-26" SUBSOIL, STONES & ROCKS 26"-74" VERY COMPACT GRAY SILTY SAND NO WATER, NO MOTTING, NO LEDGE ROOTS TO 28'", RESTRICTIVE - 261' MLSS DATA T f-% Ir UC 4 BEDROOM RESIDENCE SLOPE 6.5% PERC RATE - 1" IN 8 MINUTES RECEIVING SOIL DEPTH (AVG.) 24" HF) 30 X (FF) 1.75 X (PF) 1.0 = 52.5' MLSS REQUIRED - 52.5' MLSS PROVIDED 58' 4 BEDROOM HOUSE REQUIRES 577.5 S.F. OF EFFECTIVE LEACHING AREA USE 58 FEET OF GEOMATRIX-GST 6212 (12" DEPTH) 58 X 10.0 = 580 S.F.) USE 1,250 GAL. 2 COMPARTMENT SEPTIC TANK W/ OUTLET FILTER DEVICE LOT #6 4 BEDROOM RESIDENCE SLOPE 7.5% PERC RATE - 1" IN 6 MINUTES RECEIVING SOIL DEPTH (AVG.) 231" HF) 30 X (FF) 1.75 X (PF) 1.0 = 52.5' MLSS REQUIRED - 52.5' MLSS PROVIDED 58' 4 BEDROOM HOUSE REQUIRES 577.5 S.F. OF EFFECTIVE LEACHING AREA USE 58 FEET OF GEOMATRIX-GST 6212 (12" DEPTH) 58 X 10.0 = 580 S.F.) USE 1,250 GAL. 2 COMPARTMENT SEPTIC TANK W/ OUTLET FILTER DEVICE TH#6A -0"-11" TOPSOIL 11 "-29" SUBSOIL, STONES & ROCKS 29"-87" VERY COMPACT GRAY SILTY SAND NO WATER, NO MOTTING, NO LEDGE ROOTS TO 35 RESTRIICTIVE - 29" TH#6B - 0"-11" TOPSOIL 11 "-30" SUBSOIL, STONES & ROCKS 30"-71" VERY COMPACT GRAY SILTY SAND NO WATER, NO MOTTING, NO LEDGE ROOTS TO 30"', RESTRICTIVE - 30" TH#6C - 0"-11" TOPSOIL 11 "-27" SUBSOIL, STONES & ROCKS 27-68" VERY COMPACT GRAY SILTY SAND NO WATER, NO MOTTING, NO LEDGE ROOTS TO 40", RESTRICTIVE - 27" TH#6D - 0"-11" TOPSOIL 11 "-32" SUBSOIL, STONES & ROCKS 32"-75" VERY COMPACT GRAY SILTY SAND NO WATER, NO MOTTING, NO LEDGE ROOTS TO 34", RESTRICTIVE - 32" TH#7A - 0"-7" TOPSOIL 7"-24" SUBSOIL, STONES & ROCKS 24"-59" VERY COMPACT GRAY SILTY SAND NO WATER, NO MOTTING, NO LEDGE ROOTS TO 2411, RESTRICTIVE - 24" TH#7B - 0"-11" TOPSOIL 11 "-31" SUBSOIL, STONES & ROCKS 31 "-78" VERY COMPACT GRAY SILTY SAND NO WATER, NO MOTTING, NO LEDGE ROOTS TO 33'", RESTRICTIVE - 31" TH#7C - 0"-10" TOPSOIL TH#9A - 0"-2" TOPSOIL 2"-44" BROWN FINE SANDY LOAM 44"-92" GRAY SANDY TILL NO WATER, NO MOTTING, NO LEDGE TH#9B - 0"-4" TOPSOIL 4"-48" BROWN FINE SANDY LOAM 48"-72" GRAY SANDY TILL NO WATER, NO MOTTING, NO LEDGE TH#9C - 0"-3" TOPSOIL 3"-48" BROWN FINE SANDY LOAM 48"-78" GRAY SANDY TILL NO WATER, NO MOTTING, NO LEDGE TH#9D - 0"-6" TOPSOIL 6"-48" BROWN FINE SANDY LOAM 48"-77" GRAY SANDY TILL NO WATER, MOTTING@60", NO LEDGE 10"-23" SUBSOIL, STONES & ROCKS 23"-70" VERY COMPACT TAN SILTY SAND, STONES & ROCKS NO WATER, NO MOTTING, NO LEDGE ROOTS TO 25", RESTRICTIVE - 23" TH#7D - 0"-10" TOPSOIL 10"-32" SUBSOIL, STONES & ROCKS 32"-79" VERY COMPACT TAN SILTY SAND, STONES & ROCKS NO WATER, NO MOTTING, NO LEDGE ROOTS TO 321', RESTRICTIVE - 32" LOT #7 4 BEDROOM RESIDENCE SLOPE 9.5% PERC RATE - 1" IN 10 MINUTES RECEIVING SOIL DEPTH (AVG.) 29" HF) 26 X (FF) 1.75 X (PF) 1.0 = 45.5' MLSS REQUIRED - 45.5' MLSS PROVIDED 58' 4 BEDROOM HOUSE REQUIRES 577.5 S.F. OF EFFECTIVE LEACHING AREA USE 58 FEET OF GEOMATRIX-GST 6212 (12" DEPTH) 58 X 10.0 = 580 S.F.) USE 1,250 GAL. 2 COMPARTMENT SEPTIC TANK W/ OUTLET FILTER DEVICE T flT -"0 4 BEDROOM RESIDENCE SLOPE 7% PERC RATE - 1" IN 13 MINUTES RECEIVING SOIL DEPTH (AVG.) 24" HF) 30 X (FF) 1.75 X (PF) 1.25 = 65.6' MLSS REQUIRED - 65.6' MLSS PROVIDED 66' 4 BEDROOM HOUSE REQUIRES 577.5 S.F. OF EFFECTIVE LEACHING AREA USE 66 FEET OF GEOMATRIX-GST 6212 (12" DEPTH) 66 X 10.0 = 660 S.F.) USE 1,250 GAL. 2 COMPARTMENT SEPTIC TANK W/ OUTLET FILTER DEVICE LOT #9 MLSS - NOT REQUIRED PERC RATE - 1" IN 9 MINUTES 4 BEDROOM HOUSE REQUIRES 577.5 S.F. OF EFFECTIVE LEACHING AREA USE 58 FEET OF GEOMATRIX-GST 6212 (12" DEPTH) 58 X 10.0 = 580 S.F.) USE 1,250 GAL. 2 COMPARTMENT SEPTIC TANK W/ OUTLET FILTER DEVICE f CON ®''®rff®i m RICHARD A. MLIM, THIS MAP IS SUBSTANTIALLY CORRECT AP IS NOT VALID WITHOUT A LIVE SIGNATURE 9 OF THf, SURVEYOR HEREON. L.S. #70019 DATE PERC TEST DATA PERFORMED BY ADVANCED SURVEYS, LLC - 7/18/18 & 7/19/18 PERC #1 DEPTH - 23" PRESOAK - 7:30 - DRY AT 8:20 8:30 - 7" 8:40 -101/2" 8:50 -13 1/2" 9:00 -16" 9:10-18" 9:20 - 19 1/2" 9:30 - 201/2" PERC RATE - 8 MINUTES PER INCH PERC #2 DEPTH - 22" PRESOAK - 7:40 - DRY AT 8:30 8:45 - 3 1/2" 8:55 - 5 1/2" 9:05-63/4" 9:15 - 8 1/4" 9:25 - 9 1/4" 9:35 -10" 9:45 -11" PERC RATE -11 MINUTES PER INCH PERC #3 DEPTH - 24" PRESOAK - 9:45 - DRY AT 10:30 10:45 - 61/2" 10:55 -12" 11:05-16" 11:15 -191/2" 11:25 - 201/4" DRY PERC RATE - 5 MINUTES PER INCH PERC #4 DEPTH - 23" PRESOAK - 9:55 - DRY AT 10:40 10:55 - 7" 11:05 -12" 11:15 -141/2" 11:25-17" 11:35 -181/2" 11:45 -191/2" DRY PERC RATE - 8 MINUTES PER INCH PERC #5 DEPTH - 24" PRESOAK - 12:30 - DRY AT 1:00 1:15 - 61/2" 1:25 -111/4" 1:35 -14" 1:45 -15 1/2" 1:55 -16 3/4" 2:05 -18" 2:15 -191/2" PERC RATE - 8 MINUTES PER INCH PERC #6 DEPTH - 22" PRESOAK -12:45 - DRY AT 1:15 1:30 - 71/4" 1:40 -13" 1:50 -171/2" 2:00 -191/4" 2:10-21"DRY PERC RATE - 6 MINUTES PER INCH PERC #7 DEPTH -25 PRESOAK - 8:20 - DRY AT 9:00 9:15 - 8 I/2" 9:25 - 13" 9:35 -17" 9:45 - 191/2" 9:55 - 21" 10:05 - 221/4" 10:15 - 23" PERC RATE -10 MINUTES PER INCH PERC #8 DEPTH - 22" PRESOAK - 9:50 - DRY AT 10:35 10:50 - 61/2" 11:00-93/4" 11:10 -11 1/2" 11:20 -10 3/4" 11:30-113/411 11:40 -121 /2" 11:50 -13 1/4" PERC RATE -13 MINUTES PER INCH PERC #9 DEPTH - 26" PRESOAK - 8:35 - DRY AT 9:25 9:35 - 5" 9:45 - 10" 9:55 - 141/4" 10:05 -16 3/4" 10:15 -181/4" 10:25 -191/2" 10:35 - 201/2" PERC RATE - 9 MINUTES PER INCH