Loading...
HomeMy WebLinkAboutSite Plan (2)TEST HOLES BY UNCAS HEALTH DISTRICT. PARCEL 8 C A 8 0"- 10" LOAM 0" -5" LOAM 10"- 46" FINE SILTY SAND 5" -28" TAN FINE SILTY SAND 46" -96of FINE SANDY SILTS 28"-99" FINE GRAY SILTY SAND MOTTLING 32" -55" MOTTLING 24" - 42" WATER 80" WATER 67 01 PERC RATE 40 MIN./ IN. PARCEL 8 B A 8 0" - 8" TOP SOIL 0" -6" TOP SOIL 8" - 35" SANDY LOAM 6" - 27" SANDY LOAM 35"- 102" SANDY, LOAM, PAN 27"-96" SILTY LOAM MOTTLING 35" PAN WATER 101 " MOTTLING 34" PERC RATE 13.3 MIN./IN. WATER 90" NOTE : PARCEL 8C WILL REQUIRE AN ENGINEERED SYSTEM. PARCEL 88 WILL REQUIRE AN ENGINEERED SYSTEM. C 0" - 8" TOP SO I L 8" - 2S' SANDY LOAM, COMPACT 23"-43" SILT SAND HARD PAN MOTTLING 23" WATER 43 01 THE SEPTIC SYSTEM FOR LOT 8 B SHALL BE DESIGNED ON A PERCOLATION RATE OF 21 MIN/ INCH ; THE SEPTIC SYSTEM FOR LOT 8C SHALL BE DESIGNED ON A PERCOLATION RATE OF 46 MIN/INCH. TOPOGRAPHIC SURVEY AND ADDITIONAL TEST PIT DATA SHALL BE REQUIRED BY THE UNCAS HEALTH DISTRICT AND/ OR ITS SUCCESSOR PRIOR TO THE APPROVAL OF THE ENGINEERED DESIGNED SEPTIC SYSTEM FOR LOTS 88 ( 8C. FAO N/F JOHN W. a JOSEPHINE METCALF v � O N/F ROBERT B DONNA L. SHUTSKY 6 1• N / F ROBERT & DONNA L SHU TSK Y ago J / 80\10 49 M / S 052'54'-40. 5°�, 4_.— - ,c- /x---------- 311.4— A 06 �'p 4:7 �% �W ,- 50 \ / 62- / X14- J o, A 8; S O) APOO 10 111 I o A a •9g /J-- � N \ / 00 _ / o ,o10 OD �t � -4 to A — N 110 3 2 = 30" _ F_ o - I Q. � 12 0.0 0 5.00 \ o- cr o / oOD N/F rn / = 10 IE N 0 LARRY E. n E VA NUK o N/ F w o fA 0 �00 " / — o ELIZABETH C. -r � 5-007 CID 120.oo BLANCHETTE o _ 3 oSII°32 =30W c CIL 0 163 OtIA HE L R \ O _ __ __—_ 4642T CO. -- / ,Lh O d o 1 n R G�Approximate Septic System Location - 610 111 - - J �On0,yi , /ell / 0 WellII "I Ib GO / HELT CO - 4643 so o \ Al / F / \ LANCE W. LYNCH \ / / a•Z� �O� Septic 2 � 2 \ \ / / The house we//, dr/ve, and septic ' system shown on this parcel System 2 O \ B proposed. are\ O \ \oo 9%� / j/ Parcel No. 8B 0\0&, \ A \ / 258,580 Sq. Ft. �• Go \ \ o\ �e 0+. 8A 'L• b / /\ 5.9 4 Acres \ �2 / / j►• X10 \ � \ \ �0 � / N68435-40 E \ \ / / // \ �\ 5 . 1 3' \ / 88 10 O Well �\ / z 0I v1 �' \ 4o Parcel No. 8C 01 \ cn N r 87, 850 Sq. Ft. `\0'- Aan \ \ cW 2 Acres w 02 .\ F � \ N, The Muse, we/1, dr/ve, and sepflc \ systeop shown on th/s parcel ore Septic 8C Proposed. System \ Os .- \ 389 .83 \ N 100 24=20"E QA 0 WAIVER OOF� SIDEWALK REQUIREMENT I� REQUESTED. CHAIRMAN _ DATE WAIVER0 COORDINATE VALUES REQUIREMENT IS REQUESTED. .. _� CHAIRMAN DATE N 52 .. 30E NOV- 16= 20,E E \ L-1-- 6' \ NOle 30=30E ASO T. WA T TERSON I/ /r PA UL ��.,,!1♦rrr. IL A 't L v .4 r zN Parcel No. 8 No OD °D 519,516 Sq. Ft. iOo I 1 1 .93 Acres -' O I o= f 8 \ MELT CO. 4644 wz � `vo \ N � �- Wet _ Area H. E. L T CO. \ 4645 \ Za v \ 0. ' (A A HE LT. CO. \ — 4646 LEGEND = Test Hole = C H D / Merestone • = Iron Plpe x )( x = Wire Fence Stone Wall = Utility Pole THE SUBDIVISION REGULATIONS OF THE T )WN OF MONTVILLE ARE PART OF THIS PLAN AND APPROVAL 0' THIS PLAN IS CONTINGENT ON COMPLIANCE WITH ALL. RE )J I REMENTS OF THE SAID SUBDIVISION REGULATIONS. _. APPROVED BY TOWN OF MONTVILLE PLANNING 9 ZONING COMMISSION. Sole A ti "o oo, Site "I o� Goss Rood boXo ox% Location Map Sca I e: 1, = 1000 Ft. 480 1000 0 1000_ 2000 342 -!Sq. ft. to be deeded to town. N/F P/L VEL /S APPROVED BY SANITARIAN /j DATE APPROVED BY: THE HEALTH OFFICER DATE 5,040± Sq. 1t. q to be deeded to the town. APPROVED BY FIRST SELECTMAN i DATE APPROVED BY THE MONTVILLE WATER POLLUTION CONTROL AUTHORI T Y. APPROVED BY THE PUBLIC WORKS DEPARTMENT DIRECTOR DATE ALL WORK IS TO BE COMPLETED 8Y DAT E CHAIRMAN OR SECRETARY PASSIVE SOLAR ENERGY TECHNIQUES AS PERSCRIBED BY LAW HAVE BEEN CONSIDERED IN DEVELOPMENT OF THIS PLAN. SUBDIVIDER ~+ Zone R 40 Total area = 20.01 ± Acres. Subdivis ion of Dennis James Wa I sh, Sr. a Antionette Wo Ish Mon t v i I I e, Con n e c t i cut Scale I" =601 July, 1988 Sheet I of 2 FINAL STABILIZATION SEED BED PREPARATION Fine grade and rake so it to remove any stones larger than 2" - insta II any needed erosion and sediment control device such as surface water diversion. Apply limestone at the rate of 2 tons acre or 90 1 bs/1000 sf . Fert 11 ize wi th 10-10-10 at a rote of I I lbs 1000 :f. Work 1 ime and fort i I izer into soi 1 to a depth of 4 SEED APPLICATION Apply shade seed tolerant gross mix by hand, cyclone seeder or hydroseeder. Seeding shal I be done between Apr i I I st and June I st or between August I st and October 1st . If seeding cannot be done during these times, repeat mulch procedure with an appl icat ion rate of 30-40 lbs/acre. e MULCHING Immediately following seeding, mulch the seeded surface with straw or hay at a ro to of 1 . 5-2 tons acre . Mu Ich sho I 1 be sp read by hand or with a mulch blower. Punch mulch into soil approximateIy 2-3". T Y P I C A L LOT EROSION PLAN MULCH TEMPORARY STOCKPILES EXISTING EDGE OF ROADWAY. HOUSE L0 -T D EVE LOPMENT The fol lowing procedures wi I I be fol lowed for individual porceI development: Upon approval of individual site plan development, the limits of deve I opment sho I I b.e es tabl i shed i n the f i e Id for each proposed structure. Disturbance limits shall be 25-35 feet beyond the proposed bui Iding and shat I be bounded by stoked haybales or silt fence. Al I driveway and driveway shoulders shat I be stobi I ized immediately upon completion of rough grading. Hayboles and or silt fence shall be used to entrap any sediment gene rated f rom a xposed so i I surfaces. Dr veway roadbeds sho II be st obi 1 i zed with compacted road agg regate as soon as possible. Topsoi I and excavated subsoi I from the foundot i on area shat I be stockpiled within the area of disturbonce. All stockpiles shall be mulched or ringed with hoybo les or si I t fence . The stockpi I ing of bui Iding materials shat I be conf in ed to the area of disturbonce Vehicular movement shat I be directed to estobl fished parking areas. Proposed leaching system areas should not be used for traffic or parking. The sewage d i sposol system areas should be staged to follow house s ite preporat ion. Only the primary leaching system area need be cleared of existing vegetation. The reserve area shall remain unoItered if possible. Upon 50% of completion of the dwe I I ing construct ion , all raw soil areas surrounding the new house site shall be fine graded and mulched. The installation of any groundwater control system, curtoin drain, etcsho II be completed at this time. FABRIC SILT FENCE OR HAYBALES DOWNSLOPE OF HOUSE GRADING AND/OR LEACHING SYSTEM. LIMIT OF CLEARING a GRUBBING EXISTING DOWNHILL SLOPE FABRIC SILT F E NCE OR HAYBALES DOWNSLOPE 0 GRADING FOR DRIVEWAY PAVED APRON PER TOWN REGULATIONS. PROPERTY LINE SEDIMENT & EROSION ni o R R nTIvF CONTROL DEVELOPMENT - House construction for 2 single-family lot(s) with related dr i v eway improvements . SCHEDULE - a) Construct ion to commence and comple t ion by b) Sequence of Operations: - Layout of park ing and dro i rage improvements — Clearing and grubbing of rtsquired area — InstaIIat ion of staked hay bales downslope of excavations and other dist u rbed areas — Excovation for storm drain pipe, drywells, and retaining walls and instal Iat ion of staked hayboles at dry wel I s - Stabilization of swales and/or side slopes and seeding of temporary d istu rbed areas as needed Topsoi I , l iming, ferti l izi fig and seeding of all disturbed areas for permanent cover Instal lotion of trees, shrubs, foundation plant material and groundcover according to Landscape Plan Design criter io/construction methods and detoils: - State of Connecticut DOT Form 812 - Guidelines for Soil Erosion and Sediment Control Construction details - as required from "Guidelines. and as shown on the site plan. Instal Iation procedures - See Items 2, 3, 4 above. Operation maintenance programs a ) Prior to removal of any hayboles, regrade any trouble areas and reseed as required. b ) At the beg inn i ng of the second growing season, reseed t in areas. c) Remove siI t at h a y b a I e outlets after all rainfalls. Bu Ider responsible for construction of house and other improve - ment s i s respons i b le f or al I erosion cont ro I measures shown here- on and otherwise requi red by const ruct ion techniques ut i I ized . SUPPORT POSTS EXISTING GRADE F E N C E STAKED HAYS ALE S SEDIMENT & EROSION CONTROL PLAN Subdivis ion of Dennis James Wa Ish, Sr. Antionette Wa Ish Montvi I Ie,Connect icut T. A. Brennan, L.S. July, 1988 Sheet 2 of 2