HomeMy WebLinkAboutArchambault Sub-Division Property Plan 05012002LINE LENGTH BEARING
Ll _ 23116 N68'22'00`W
L2 19.81 S14.43'00`E
co
TH15 .SURVEY VEYAND TO
THE BEST OP MY K G E jf UD5TANTIALLY
CORRECT EXCEPT
20
David A. ng, F rofe5
9
1 Land Surveyor
NOT VALID WITHOUT LI AMP 51GNATURE)
James E.Frner Jon and Nancy sage
A-2 .Maps and Surveys ,
a n
G
Z ME& ^
Mildred Baer
I Inch= 80 Feet
80 160 240 320 400
1
Approved y the Montville Planning and Zoning Commission Date
Passive Solar Energy Techniques as prescribed by law have been considered
in development of this plan.
Bruce and MaryJo LaVjgne
Date of Completion of all work.
DRAWN BY: D.A.K. DATE: May 1, 2002
Gonn
NOTES
7 fadlnq Gove gook I . Noble Hill Road Right -of -Way exceeds fifty feet.
2. The property 15 located in Zone RA 120. The following
criteria have been met or exceeded in all cases.
L cff1ncjwd1 Woad Criteria Required Provided
a. Lot Area 120,000 5F 120,000+
Frontage 200 Feet 200 Feet
f
Front Yard GO Feet GO Feet
Side Yard 25 Feet 25 Feet
Rear Yard GO Feet GO Feet
1(j Kood
3. No Engineered 5eptic 5y5tem5 are rewired.
Nose 4. On-5ite WCI15 required.
ocaffol7 %'7gp
5. All driveway aprons to be paved for the first 20 Feet
and in all areas in exce55 of 10% slope.
800' G. Wetland flagged by Don Fortunato of Soil and Environmental
Services and located by field Survey.
7. All areas disturbed shall be immediately loamed and seeded.
and mulched to minimize erosion.
8. All utIIItie5 to each lot will be placed within 5 feet of all
rop05ed driveways.
9. Monuments to be set at all front corners as shown.
10. Contours Taken from reference map and are noted as "5 Foot
contour intervals based on U.5.0*G.5. Datum
MAP REFERENCE5
1. "Map of property of Edward J. Novakow5ki Showing Frem15e,5 Conveyed5U125equenttoSept. 15, 1 962 Including Prem15e5 to be Conveyed to Tri -J, Inc.
or Harry Johnson, Towns of Montville *- Bozrah, Conn., Scale I "= 100" Chandler,
Palmer and King, March 24, 1075, Norwich, CT"
1
Approved y the Montville Planning and Zoning Commission Date
Passive Solar Energy Techniques as prescribed by law have been considered
in development of this plan.
Bruce and MaryJo LaVjgne
Date of Completion of all work.
DRAWN BY: D.A.K. DATE: May 1, 2002
NO. DATE DE5CRIPTION BY
REVl5I0N5
s
JUN :3 2002 IJI
J+
SHEET NUMBER
Archambault Subdivision Sheet I of 4
Property Plan °F
1 41 Noble, Hill Road, Montville, CT.- /Z-
0
TEST HOLE DATA (Uncal health District- Dave Coughlin, 5
Date of Testinq June 15, 2001
Lot TH# Depth Desc.
1 1 0"-G" Topsoil
0-23" Subsoil
23"-87" Med. to Coarse Grey Silty Sand
1 2 0"-5" Topsoil
5"-37" Subsoil
37"-72" Grey Med. Silty Sand
72"-90" Gravel
1 3 0"-1 1 " Topsoil
1 1 "-43" Subsoil
43"-82" Med. Compact Grey Silty Sand
1 4 0"-8" Topsoil
8"-53" Subsoil
53"-G7" Grey Silt
67"-84" Grey Med. to Coarse Silty Sand
Mottling @ 53"
Percolation Rate Lot I = 5.71 Minutes Per Inch
2 1 0"-8" Topsoil
8"-20" Subsoil
20"-84" Gravel
2 2 0"-G" Topsoil
G"-21 " Subsoil
2 1 "-81 " Med. Grey Sand, Some Gravel
2 3 O"-7" Topsoil
7"-43" Subsoil
43"-82" Grey Compact Silty Sand
2 4 0"-G" Topsoil
0-22" Subsoil
22"-89" Grey Compact Silty Sand
Percolation Rate Lot 2 = 5.23 Minutes Per Inch
3 1 O"- I G" Topsoil
10-32" Subsoil
32"-91 " Med. Compact Silty Sand
Water @ 80
3 2 O"-7" Topsoil
TAG" Subsoil
40-75" Grey Compact Silty Sand
3 3 0"-8" Topsoil
8"-32 Subsoil
32"-81 " Compact Very Silty Sand (Damp)
3 4 0"-9" Topsoi
9"-34" Subsoil
34"-7G" Compact Silty Sand
Percolation Rate Lot'3 = 5.14 Minutes Per Inch
4 1 0"-G" Topsoil
0-30" Subsoil
30-77" Damp Silty Sand
Mottling @ 5 1 "
4 2 0"-10" Topsoi
10" -GO" Subsoil
GO" -80 Med. to Coarse Sand with Some Gra
4 3 0"-9" Topsoil
9"-40" Subsoil
40"-82" Damp Silty Sand
4 4 0"-1 1 " Topsoil
1 1 "-43" Subsoil
43"-84" Damp Silty Sand
Mottling @ 30", Water at 55"
Percolation Rate Lot 4 = 7.20 Mmutes Per Inch
Existing Residence
0"-7" fill
711-) O" Topsoil
10"-29" Subsoil
29"-72" Grey Silty Sand w/Some Gravel
Percolation Rate Existing Residence= 12.4 Minutes per In
z
r
0
wv i vv :?iCJitL, "i[c mcAIL"mui z,
Typical)
GiLLfs"RC`IL
A. PROJECT NARRATIVE - Noble Hill Subdivision
THE PROJECT IS A RESIDENTIAL SUBDIVISION CONSISTING OF 5 LOTS TO BE DEVELOPED
IN ONE (1) PHASE. ALL LOTS FRONT UPON NOBLE HILL ROAD.
THE TOTAL PARCEL AREA IS 15f ACRES
THERE IS NO FILLING OF INLAND WETLANDS ASSOCIATED WITH THIS APPLICATION OR WITH
THE FUTURE HOME CONSTRUCTION ON THE 5 LOTS.
LOCATION OF PROJECT
THE PROJECT IS LOCATED ON THE NORTH SIDE OF NOBLE HILL ROAD
PROJECT OWNERS
RICHARD ARCHAMBAULT
141 NOBLE HILL ROAD
OAKDALE, CT
OWNER'S AGENT
A-2 MAPS AND SURVEYS
231 OLD COLCHESTER ROAD
QUAKER HILL
CONNECTICUT, 06375
TOWN CONTACT
INLAND WETLANDS/ZONING ENFORCEMENT OFFICER
TOWN OFFICE BUILDING
TOWN OF MONTVILLE
860-848 8549
CONSTRUCTION SCHEDULE AND SEQUENCE
NO MAJOR ROAD CONSTRUCTION OR MODIFICATION IS INVOLVED IN THIS PROJECT.
SINCE SEDIMENTATION AND EROSION CONTROL WILL BE ON A LOT
BY LOT BASIS THROUGH OUT THE PROJECT, THE FOLLOWING CONSTRUCTION SEQUENCE WILL
APPLY.
THE GENERAL SEQUENCE OF CONSTRUCTION IS AS FOLLOWS:
1. EQUIPMENT MOBILIZATION
2. INSTALLATION OF TEMPORARY EROSION AND SEDIMENT CONTROLS.
3. CLEARING AND GRUBBING OF THE BUILDING AREAS.
4. INSTALLATION OF E&S MEASURES.
5. ROUGH AND FINE GRADING OF DRIVEWAYS.
6. INSTALLATION OF CONSTRUCTION ENTRANCE.
7. FINE GRADING, TOPSOILING, SEEDING AND MULCHING OF
SHOULDERS, SLOPES AND ALL DISTURBED AREAS.
8. REMOVAL OF TEMPORARY EROSION AND SEDIMENT CONTROLS AFTER
STABILIZATION OF ALL DISTURBED AREAS.
B. CONTINGENCY PLAN
PRIOR TO THE START OF CONSTRUCTION, THE CONTRACTOR SHALL PROVIDE THE
OWNER'S AGENT AND THE TOWN OF MONTVIIIE WITH THE NAMES AND
TELEPHONE NUMBERS OF ,THE RESPONSIBLE PERSONS TO BE CONTACTED IN THE
EVENT OF AN EROSION AND/OR SEDIMENTATION CONTROL PROBLEM.
THE CONTRACTOR SHALL AT ALL TIMES KEEP A SUFFICIENT AMOUNT OF FILTER
FABRIC SEDIMENT FENCE AND/OR HAYBALES ON THE PROJECT SITE TO CONTROL
EROSION AND/OR SEDIMENTATION PROBLEMS. IN THE EVENT OF A PROBLEM, THE
CONTRACTOR SHALL PROMPTLY STABILIZE THE PROBLEM AND CONTAIN ANY
SEDIMENT AND THEN NOTIFY THE TOWN OF MONTVILLE.
C. EROSION AND SEDIMENT CONTROL
THE CONTRACTOR SHALL BE RESPONSIBLE FOR IMPLEMENTATION OF THE EROSION
AND SEDIMENT CONTROL PLAN FOR THE PROJECT.
THE MINIMUM STANDARDS FOR ALL EROSION AND SEDIMENT CONTROL MEASURES
SHALL BE THOSE OUTLINED IN THE "CONNECTICUT GUIDELINES FOR SOIL EROSION
AND SEDIMENT CONTROL", JANUARY. 1985, LATEST REVISION. ALTERNATIVE
MEASURES, METHODS, MEANS, AND TECHNIQUES MAY BE ALLOWED WITH THE PRIOR
APPROVAL OfTHE ENGINEER AND THE TOWN OF MONTVILLE.
1. GENERAL. QUIDELINES:
a). NO CONSTRUCTION ACTIVITY SHALL TAKE PLACE WITHIN AREAS DESIGNATED
AS J14LAND WETLANDS, WATERCOURSES OR FLOODPLAINS, OR WITHIN
STrr E:AM CHANNEL ENCROACHMENT LINES WITHOUT ALL REQUIRED
APPROVALS AND/OR PERMITS.
b). TEMPORARY EROSION AND SEDIMENT CONTROLS SHALL BE INSTALLED PRIOR
TO THE START OF CONSTRUCTION.
c). ALL EROSION AND SEDIMENT CONTROLS SHALL BE MAINTAINED CONTINUOUSLY
AND SHALL NOT BE REMOVED UNTIL ALL DISTURBED AREAS HAVE BEEN
STABILIZED.
d). THE CONTRACTOR SHALL LIMIT THE DISTURBANCE OF LAND TO THOSE AREAS
SHOWN ON THE DRAWINGS AND SHALL TAKE REASONABLE CARE TO PROTECT
AND PRESERVE EXISTING VEGETATION WITHIN THE LIMITS OF DISTURBANCE
WHERE FEASIBLE.
e). WHERE PRACTICABLE, THE CONTRACTOR SHALL PLAN HIS CONSTRUCTION
OPERATIONS SO AS TO LIMIT THE AREAS OF EXPOSED SOIL TO AREAS
ACTIVELY UNDER CONSTRUCTION. THE CONTRACTOR SHALL TAKE
REASONABLE CARE TO LIMIT THE PERIOD OF EXPOSURE OF DISTURBED AREAS.
THE INSTALLATION OF PERMANENT VEGETATIVE MEASURES SHALL BE
ACCOMPLISHED AS SOON AS IS PRACTICABLE.
f). ADEQUATE PROVISIONS SHALL BE TAKEN TO PROTECT ALL EXPOSED CUT AND
FILL SLOPES FROM SURFACE WATER FLOW DAMAGE.
g). ALL MATERIAL FROM CLEARING AND GRUBBING OPERATIONS SHALL BE
DISPOSED OF IN DESIGNATED AREAS ONLY.
h). WATER FROM DEWATERING OPERATIONS SHALL NOT BE DISCHARGED
DIRECTLY TO ANY WETLAND OR WATERCOURSE. SUCH WATER SHALL BE
DISCHARGED TO AN APPROVED SEDIMENT BASIN AND OR FILTER FACILITY
OR TO A STORM DRAINAGE SYSTEM WHEN APPROVED. NO WATER FROM
DEWATERING OPERATIONS SHALL BE DISCHARGED INTO A SANITARY SEWER
SYSTEM.
i). THE STORAGE, WASHING, FUELING, AND MAINTENANCE OF EQUIPMENT AND
VEHICLES SHALL TAKE PLACE IN DESIGNATED AREAS ONLY. IN THE EVENT
OF A CONTAMINANT SPILL THE CONTRACTOR SHALL IMMEDIATELY NOTIFY
THE DEPARTMENT OF ENVIRONMENTAL PROTECTION OIL AND CHEMICAL
SPILL DEPARTMENT (860-566-3338), AND THE TOWN OF MONTVILLE.
2. VEGETATIVE MEASURES
a.) TEMPORARY VEGETATIVE COVER
INSTALLATION REQUIREMENTS
SITE PREPARATION
T.) GRADE AS NEEDED AND FEASIBLE TO PERMIT THE USE OF EQUIPMENT FOR
SEEDBED PREPARATION, SEEDING, MULCH APPLICATION AND MULCH ANCHORING.
ALL GRADING SHOULD BE DONE IN ACCORDANCE WITH THE REQUIREMENTS FOR
GRADING.
H.) INSTALL NEEDED EROSION CONTROL MEASURES SUCH AS DIVERSIONS, GRADE
STABILIZATION STRUCTURES, SEDIMENT BASINS AND GRASSED WATERWAYS.
SEEDBED PREPARATION
E.) APPLY LIMESTONE AND FERTILIZER ACCORDING TO SOIL TEST RECOMMENDATIONS
SUCH AS THOSE OFFERED BY THE UNIVERSITY OF CONNECTICUT SOIL TESTING
LABORATORY. SOIL SAMPLE MAILERS ARE AVAILABLE FROM THE LOCAL
COOPERATIVE EXTENSION SERVICE OFFICE. IF SOIL TESTING IS NOT FEASIBLE ON
SMALL OR VARIABLE SITES, OR WHERE TIMING IS CRITICAL, FERTILIZER MAY BE
APPLIED AT THE RATE OF 300 POUNDS PER ACRE OR 7.5 POUNDS PER 1,000
SQUARE FEET OF 10-10-10 OR EQUIVALENT. APPLY LIMESTONE (EQUIVALENT
TO 50 PERCENT CALCIUM PLUS MAGNESIUM OXIDE) AS FOLLOWS:
SOIL TEXTURE TONS AC LBS/1,000 SQUARE FEET
CLAY, CLAY -LOAM, 3 135
AND HIGH ORGANIC SOIL
SANDY LOAM, LOAM, 2 90
SILT LOAM
LOAMY SAND, SAND 1 45
REFER TO COUNTY SOIL REPORT FOR SOIL TEXTURES AT THE SITE.
SEEDING
Q ANNUAL RYE GRASS 80 LBS/ACRE, 2 LBS/100 SF
R.) WHERE THE SOIL HAS BEEN COMPACTED BY CONSTRUCTION OPERATIONS, LOOSEN
THE SOIL TO A DEPTH OF TWO (2) INCHES BEFORE APPLYING FERTILIZER LIME AND
SEED.
iii.) APPLY SEED UNIFORMLY BY HAND, CYCLONE SEEDER, DRILL., CULTIPACKER TYPE
SEEDER OR HYDROSEEDER. HYDROSEEDLNGS WHICH INCLUDE MULCH, MAY BE
LEFT ON SOIL SURFACE. SEEDING RATES MUST BE INCREASED BY 10 PERCENT
WHEN HYDROSEEDING.
iv.) SPRING SEEDINGS USUALLY GIVE THE BEST RESULTS. SPRING SEEDINGS OF ALL
SEED LEGUMES IS RECOMMENDED, HOWEVER, LATE SUMMER SEEDINGS PRIOR TO
SEPTEMBER 1 CAN BE MADE. WHEN CROWN VETCH IS SEEDED IN LATE SUMMER,
AT LEAST 35 PERCENT OF THE SEED SHOULD BE HARD SEED (UNSCARIFIED).
THE RECOMMENDED SEEDING DATES ARE:
MARCH 1 THROUGH JUNE 15
AUGUST 1 THROUGH OCTOBER 1
b.) PERMANENT VEGETATIVE COVER
INSTALLATION REQUIREMENTS
SITE PREPARATION
Q GRADE AS NEEDED AND FEASIBLE TO PERMIT THE USE OF CONVENTIONAL
EQUIPMENT FOR SEEDBED PREPARATION, SEEDING, MULCH APPLICATION AND
ANCHORING, AND MAINTENANCE. ALL GRADING SHOULD BE BE DONE IN ACCORDANCE
WITH THE REQUIREMENTS FOR GRADING.
SEEDBED PREPARATION
i.) APPLY LIMESTONE AND FERTILIZER ACCORDING TO SOIL TESTS SUCH AS THOSE
OFFERED BY THE UNIVERSITY OF CONNECTICUT SOIL TESTING LABORATORY.
SOIL SAMPLE MAILERS ARE AVAILABLE FROM THE LOCAL COOPERATIVE
EXTENSION SERVICE OFFICE. IF SOIL TESTING IS NOT FEASIBLE ON SMALL OR
VARIABLE SITES, OR WHERE TIMING IS CRITICAL, FERTILIZER MAY BE APPLIED AT
THE RATE OF 300 POUNDS PER ACRE OR.7.5 POUNDS PER 1,000 SQUARE FEET
USING 10-10-10 OR EQUIVALENT. IN ADDITION, 300 POUNDS OF 38-0-0 PER
ACRE OR EQUIVALENT OF SLOW RELEASE NITROGEN MAY BE USED FOR TOPDRESSING.
APPLY GROUND LIMESTONE (EQUIVALENT TO 50 PERCENT CALCIUM PLUS MAGNESIUM
OXIDE) AS FOLLOWS:
SOIL TEXTURE TONS AC LBS/1,000 SQUARE FEET
CLAY, CLAY -LOAM, 4 180
AND HIGH ORGANIC SOIL
SANDY LOA}d, LOAM 3 135
SILT LOAM
LOAMY SAND, SAND 2 90
REFER TO .COUNTY SOIL REPORT FOR SOIL TEXTURES AT THE SITE.
H.) WORK LIME AND FERTILIZER INTO THE SOIL AS NEARLY AS PRACTICAL TO A DEPTH
OF 4 INCHES WITH.A. DISC, SPRING TOOTH HARROW OR OTHER SUITABLE EQUIPMENT.
THE FINAL HARROWING OR DISCING OPERATION SHOULD BE ON THE GENERAL
CONTOUR. CONTINUE TILLAGE UNTIL A REASONABLY UNIFORM, FINE SEEDBED IS
PREPARED. ALL -BUT CLAY OR SILTY SOILS AND COARSE SANDS SHOULD BE
ROLLED TO FIRM THE SEEDBED WHEREVER FEASIBLE.
iii.) REMOVE FROM THE SURFACE ALL STONES TWO INCHES OR LARGER IN ANY
DIMENSION. REMOVE ALL OTHER DEBRIS SUCH AS WIRE, CABLE, TREE ROOTS,
PIECES OR CONCRETE, CLODS, LUMPS OR OTHER UNSUITABLE MATERIAL.
iv.) INSPECT SEEDBED JUST BEFORE SEEDING. IF TRAFFIC HAS LEFT THE SOIL
COMPACTED, THE AREA MUST BE RETILLED AND FIRMED AS ABOVE.
SEEDING DATES
T.) SPRING SEEDING USUALLY GPIES THE BEST RESULTS. SPRING SEEDINGS OF ALL
SEED MIXES WITH LEGUMES IS RECOMMENDED, HOWEVER LATE SUMMER
SEEDINGS PRIOR TO SEPTEMBER 15 CAN BE MADE. WHEN CROWN VETCH IS SEEDED
IN LATE SUMMER, AT LEAST 35 PERCENT OF THE SEED SHOULD BE HARD SEED
UNSCARIFIED). THE RECOM)AENDED SEEDING DATES ARE:
APRIL 15 THROUGH JUNE 15
AUGUST 15 THROUGH SEPTEMBER 15
WITH THE EXCEPTION OF CROWN VETCH, THE FINAL SEEDING DATE MAY BE
EXTENDED 15 DAYS IN THE COASTAL TOWNS OF NEW LONDON, MIDDLESEX,
NEW HA`/al. AND FAIRFIELD COUNTIES.
SEEDING
L.) UNLESS OTHEITUISE SPECIFIED, THE SEED MIXTURE SHALL BE AS FOLLOWS:
KENTUCKY BLUEGRASS 20 LB/ACRE .45 LB/1,000 SF
CREEPING RED FESCUE 20 LB/ACRE .45 LB/1,000 SF
PERENNIAL RYEGRASS 5 LB/ACRE .10 LB/1,000 SF
TOTAL 45 LB/ACRE 1.00 LB/1,000 SF
ii.) APPLY SEED UNIFORMLY BY RAND, CYCLONE SEEDER, DRILL, CULTIPACKER TYPE
SEEDER OR HYDROSEEDER. NORMAL SEEDING DEPTH IS FROM 1/4 TO 1/2 INCH.
HYRDOSEEDINGS WHICH ARE MULCHED MAY BE LEFT ON SOIL SURFACE.
iii.) WHERE FEASIBLE, EXCEPT 'ff'rIERE EITHER A CULTIPACKER TYPE SEEDER OR
HYDROSEEDER IS USED, THE SEEDBED SHOULD BE FIRMED FOLLOWING SEEDING
OPERATIONS WITH A ROLLER, OR LIGHT DRAG. SEEDING OPERATIONS SHOULD BE
ON THE CONTOUR.
iv.) FROST CRACK SEEDING MUST BE DONE IN LATE WINTER OR EARLY SPRING.
SUITABLE WEARIER CONDITIONS ARE FREEZING NIGHTS AND THAWING DAYS WITH
LITTLE OR NO SNOW COVER. SEEDING RATES MUST BE INCREASED 10 PERCENT
WHEN USING THIS METHOD.
v.) HYDRAULIC APPLICATIOt! (H'fDROSEEEDING), IS A SUITABLE METHOD FOR USE ON
CRITICAL AREAS. WHEN KfDROSEEDING, A SEEDBED IS PREPARED IN THE
CONVENTIONAL WAY OR BY HAND RAKING TO LOOSEN AND SMOOTH THE
SOIL AND TO REMOVE SURFACE STONES LARGER TH41 SIX INCHES IN DIAMETER.
SLOPES MUST BE NO STEEPER THAN 2 TO 1 (2 FEET HORIZONTALLY TO 1 FOOT
VERTICALLY). LIME AND FERTILIZER MAY BE APPLIED SIMUL'1" NEOUSLY WITH THE
SEED. THE USE OF FIBER MULCH Ott CFJr0..' L AREAS IS NOT RECOMMENDED
UNLESS IT IS USED TO HOLD STRAW OR HAT). FIBER MULCH DOES NOT PROVIDE
ADEQUATE SEEDBED PROTECTION. BETTER PROTECTION IS GAINED BY USING
STRAW MULCH AND HOLDING IT YdTH ADHESP/E MATERIALS OR 500 POUNDS PER
ACRE OF WOOD FIBER MULCH. SEEDING RATES MUST BE INCREASED BY 10
PERCENT WHEN HYDROSEEDING.
vi.) APPLY MULCH ACCOIRDING TO THE REQUIREMENTS FOR TEMPORARY MULCHING.
vii.) IF SEEDING CANNOT'BE DONE WITHIN THE SEEDING DATES, USE TEMPORARY MULCHING
TO PROTECT THE SITE AND DELAY SEEDING UNTIL THE NEXT RECOMMENDED
SEEDING PERIOD.
MAINTENANCE
E.) LIME ACCORDING TO A SOIL TEST OR AT A MINIMUM OF EVERY FIVE YEARS USING A
RATE OF TWO TONS PER ACRE (100 POUNDS PER 1,000 SQUARE FEET).
ii.) WHERE GRASSES PREDOMINATE, FERTILIZE ACCORDING TO A SOIL TEST OR
BROADCAST BIENNIALL'f, 300 POUNDS OF 10-10-10 OR EQUIVALENT PER ACRE
7.5 POUNDS PER 1,000 SQUAB FEET).
iii.) WHERE LEGUMES PREDOMINATE, FERTILIZE ACCORDING TO A SOIL TEST OR
BROADCAST EVERY THREE YEARS 300 POUNDS OF 0-20-20 PER ACRE OR EQUIVALENT
7.5 POUNDS PER 1,000 SQUARE FEET).
3. NONSTRUCTURAL MEASURES
a.) HAYBALES
SHEET FLOW APPLICATIONS
INSTALLATION REQUIRUIENTS
i.) BALES SHALL BE PLACED LENGTHWISE IN A SINGLE ROW FOLLOWING THE
GROUND CONTOURS, WITH THE ENDS OF ADJACENT BALES TIGHTLY ABUTTING
ONE ANOTHER.
ii.) ALL BALES SHALL BE EITHER WIRE BOUND OR STRING TIED. BALES SHALL BE
INSTALLED SO THAT BINDINGS ARE ORIENTED AROUND THE SIDES OF THE BALES
PARALLEL TO THE GROUND TO PREVENT DETERIORATION OF THE BINDING.
iii.) A TRENCH SHALL BE EXCAVATED THE WIDTH OF A BALL AND THE LENGTH OF
THE PROPOSED BARRIER TO A MINIMUM DEPTH OF 4 INCHES. AFTER THE BALES
ARE STAKED AND CHINKED, THE EXCAVATED SOIL SHALL. BE BACKFILLED AGAINST THE
BARRIER. BACKFILL SOIL SHALL CONFORM TO THE GROUND LEVEL ON THE DOWNHILL
SIDE AND SHALL BE BUILT UP TO 4 INCHES AGAINST TriE UPHILL SIDE OF THE
BARRIER. BALES SHOULD BE PLACED TEN FEET AWAY FROM THE TOE OF SLOPES
UNLESS OTHERWISE SHOWN Ott THE DRAWINGS OR DIRECTED.
iv.) EACH BALE SHALL BE SECURELY ANCHORED BY AT LEAST TWO (2) STAKES
DRIVEN THROUGH THE BALE THE FIRST STAKE IN EACH BALE SHALL BE DRIVEN
TOWARD THE PREVIOUSLY LAID BALE TO FORCE THE BALES TOGETHER. STAKES SHALL
BE DRIVEN DEEP ENOUGH INTO rHE GROUND TO SECURELY ANCHOR THE BALES.
v.) THE GAPS BETNEEN BALES SHALL BE FILLED BY WEDGING STRAW BETWEEN
THEM TO PREVENT WATER FROM FLOWING BETWEEN THE BALES.
CHANNEL FLOW APPLICATIONS
INSTALLATION REQUIREMENTS
E.) BALES SHALL BE PLACED IN A SINGLE ROW, LENGTHWISE, ORIENTED PERPENDICULAR
TO THE GROUND CONTOURS, WITH ENDS OF ADJACENT BALES TIGHTLY ABUTTING ONE
ANOTHER.
H.) THE REMAINING STEPS FOR INSTALLING A HAYBALE BARRIER FOR SHEET FLOW
APPLICATIONS APPLY HERE, WITH THE FOLLOWING ADDITION:
THE BARRIER SHALL BE EXTENDED TO SUCH A LENGTH THAT THE BOTTOMS OF
THE END BALES ARE WCHER IN ELEVATION THAT THE TOP OF THE LOWEST
MIDDLE BALE TO ASSURE THAT SEDIMENT WILL FLOW EITHER THROUGH OR
OVER THE BARRIER BUT NOT AROUND IT.
MAINTENANCE
E.) INSPECTION SHALL BE MADE AFTER EACH STORM EVENT AND PERIODICALLY
DURING PROLONGED RAIN EVENTS AND REPAIR OR REPLACEMENT SHALL BE MADE
PROMPTLY! AS REQUIRED.
H.) ACCUMULATED SEDIMEtfr BEHIND THE BALES SHALL BE REMOVED WHEN IT
REACHES 1/2 OF THE ORIGINAL HEIGHT OF THE BALES.
b.) FILTER FABRIC FENCE
MATERIALS
E.) SYNTHETIC FILTER FABRIC
SYNTHETIC FILTER FABRIC SHALL BE A PERVIOUS SHEET OF PROPYLENE, NYLON,
POLYESTER OR ETHYLENE FILAIAENTS AND SHALL BE CERTIFIED BY THE
MANUFACTURER OR SUPPLIER AS CONFORMING TO THE FOLLOWING REQUIREMENTS:
PHYSICAL PROPERTY REQUIREMENTS
FILTERING EFFICIENCY 75% (MIN.)
TENSILE STRENGTH AT 207. (MAX) ELONGATION:
EXTRA STRENGTH 50 LBS./LIN. IN. (MIN.)
STANDARD STRENGTH 30 LBS./LIN. IN. (MIN.)
FLOW RATE 0.3 GAL/SF/MIN (MIN.)
H.) POSTS FOR FILTER FABRIC FENCES SHALL BE EITHER i X 2 INCH WOOD OR 0.5
POUND (MINIMUM) PER LINEAL FOOT STEEL WITH A MINIMUM LENGTH OF 5 FEET
STEEL POSTS SHALL NAVE PROJECTIONS FOR FASTENING WIRE TO THEM.
WIRE FENCE REINFORCEMENT FOR FILTER FABRIC FENCES USING STANDARD
STRENGTH MATERIAL SHALL BE A MINIMUM OF 42 INCHES Itt HEIGHT, A
MINIMUM OF 14 GAUGE AND SHALL HAVE A MAXIMUM MESH SPACING OF
6 INCHES.
INSTALLATION REQUIREMENTS
Q THE 'HEIGHT OF THE BARRIER SHALL NOT EXCEED 36 INCHES. (HIGHER BARIIERS
MAY IMPOUND VOLUMES OF WATER SUFFICIENT TO CAUSE FAILURE). THE FILTER
FABRIC FENCE SHALL BE PLACED 10 FEET AWAY FROM THE TOE OF SLOPES
UNLESS OTHERWISE SHOWN ON THE DRAWINGS OR DIRECTED.
ii.) WHEN JOINTS ARE NECESSARY, FILTER FABRIC ROLL ENDS SHALL BE SPLICED
TOGETHER ONLY AT A SUPPORT POST IN CONFORMANCE WITH THE
MANUFACTURERS RECOMMENDATIONS.
iii.) POSTS SHALL BE SPACED A MAXIMUM OF 10 FEET APART AND DRIVEN SECURELY
INTO THE GROUND A MINIMUM DEPTH OF 12 INCHES.
v.) WHEN STANDARD STRENGTH FILTER FABRIC IS USED; A WIRE MESH SUPPORT
FENCE SHALL BE FASTENED SECURELY TO THE UPSLOPE SIDE OF THE POSTS
USING HEAVY DUTY WIRE STAPLES AT LEAS(' 1 INCH LONG, TIE WIRES OR
HOG RINGS. THE WIRE SHALL EXTEND INTO A TRENCH A MINIMUM OF 2 INCHES
AND SHALL NOT EXTEND MORE THAN 36 INCHES ABOVE THE ORIGINAL GROUND
SURFACE.
vi.) THE STANDARD STRENGTH FILTER FABRIC SHALL BE STAPLED, WIRED OR TIED
TO THE WIRE FENCE, AND 8 INCHES OF THE FABRIC SHALL BE EXTENDED
INTO THE TRENCH.
vii.) WHEN EXTRA STRENGTH FILTER FABRIC OR BURLAP AND CLOSER POST SPACING
ARE USED, THE WIRE MESH SUPPORT FENCE MAY BE ELIMINATED.
At.) THE TRENCH SHALL BE BACKFILLED AND THE SOIL COMPACTED OVER THE
FILTER FABRIC.
MAINTENANCE
E.) INSPECTION SHALL BE MADE AFTER EACH STORM EVENT AND PERIODICALLY
DURING PROLONGED RAINFALL. REPAIR OR REPLACEMENT SHALL BE MADE
AS REQUIRED.
ii.) ACCUMULATED SEDIMENT BEHIND THE FABRIC SHALL BE REMOVED WHEN IT
REACHES 1/2 OF THE HEIGHT OF THE BARRIER.
c.) GRADING
Q ALL GRADED OR DISTURBED AREAS INCLUDING SLOPES SHALL BE PROTECTED DURING
CLEARING AND CONSTRUCTION IN ACCORDANCE WITH THE APPROVED SEDIMENT CONTROL
PLAN UNTIL THEY ARE PERMANENTLY STABILIZED.
ii.) AREAS TO BE FILLED SHALL BE CLEARED, GRUBBED AND STRIPPED OF TOPSOIL TO
REMOVE TREES, VEGETATION, ROOTS OR OTHER OBJECTIONABLE MATERIAL
iii.) ALL FILLS SHALL BE COMPACTED AS REQUIRED TO REDUCE EROSION, SLIPPAGE,
SETTLEMENT, SUBSIDENCE OR OTHER RELATED PROBLEMS.
iv.) FILL MATERIAL SHALL BE FREE OF BRUSH, RUBBISH, ROCKS, LOGS, STUMPS,
BUILDING DEBRIS AND OTHER OBJECTIONABLE MATERIALS.
v.) FROZEN MATERIAL OR SOFT, MUCKY OR HIGHLY COMPRESSIBLE MATERIALS SHALL
NOT BE INCORPORATED INTO FILLS.
A.) FILL SHALL NOT BE PLACED ON A FROZEN FOUNDATION.
vii.) TOPSOILING SHALL BE ACCOMPLISHED IN ACCORDANCE WITH THE REQUIREMENTS FOR
TOPSOILING.
AIL) ALL GRADED AREAS SHALL BE PERMANENTLY STABILIZED IMMEDIATELY FOLLOWING
FINISHED GRADING OPERATIONS.
d.) TOPSOILING
MATERIALS
AN INVESTIGATION SHALL BE MADE TO DETERMINE IF THERE IS A SUFFICIENT
QUANTITY OF TOPSOIL OF GOOD QUALITY ON THE SITE TO JUSTIFY STRIPPING. HIGH
QUALITY TOPSOIL SHALL BE FRIABLE AND LOAMY (LOAM, SANDY LOAM, SILT LOAM,
SANDY CLAY LOAM, CLAY LOAM). OTHER SOIL TYPES WITH HIGH ORGANIC CONTENT
MAY BE FOUND SUITABLE AFTER TESTING. R SHALL BE FREE OF DEBRIS, TRASH,
STUMPS, ROCKS, ROOTS, AND NOXIOUS WEEDS. R SHALL GIVE EVIDENCE OF BEING
ABLE TO SUPPORT HEALTHY VEGETATION. IT SHALL CONTAIN NO SUBSTANCE THAT IS
POTENTIALLY TOXIC TO PLANT GROWTH.
ALL TOPSOIL SHALL BE TESTED BY A RECOGNIZED LABORATORY TO DETERMINE THE
THE PROPER APPLICATION RATES OF LIME AND FERTILIZER.
INSTALLATION REQUIREMENTS
STRIPPING OF TOPSOIL SHALL BE CONFINED TO THE IMMEDIATE CONSTRUCTION
AREA. THE DEPTH OF REMOVAL MAY VERY DEPENDING ON THE SITE CONDITIONS.
ALL SEDIMENT CONTROLS SHALL BE IN PLACE PRIOR TO BEGINNING STRIPPING
OPERATIONS.
ii.) TOPSOIL SHALL BE STOCKPILED IN SUCH A MANNER THAT NATURAL DRAINAGE 1S NOT
OBSTRUCTED AND NO OFF-SITE SEDIMENT DAMAGE SHALL RESULT.
iii.) SLOPES OF STOCKPILES SHALL NOT BE STEEPER THAN 2 HORIZONTAL TO 1 VERTICAL
iv.) A SEDIMENT BARRIER SHALL SURROUND ALL TOPSOIL STOCKPILES.
v.) TEMPORARY SEEDING OF STOCKPILES SHALL BE COMPLETED WITHIN 15 DAYS OF THE
FORMATION OF THE STOCKPILE IN ACCORDANCE WITH THE TEMPORARY VEGETATIVE
COVER REQUIREMENTS.
vi.) PREVIOUSLY ESTABLISHED GRADES ON THE AREAS TO BE TOPSOILED SHALL BE MAINTAINED
ACCORDING TO THE DRAWINGS.
vii.) WHERE THE PH OF THE SUBSOIL IS 6.0 OR LESS, GROUND AGRICULTURAL LIMESTONE
SHALL BE SPREAD IN ACCORDANCE WITH THE SOIL TEST OR THE VEGETATIVE
ESTABLISHMENT PRACTICE BEING USED.
viii.) AFTER THE AREAS TO BE TOPSOILED HAVE BEEN BROUGHT TO GRADE, AND
IMMEDIATELY PRIOR TO SPREADING THE TOPSOIL, THE SUBGRADE SHALL BE
LOOSENED BY DISCING OR SCARIFYING TO A DEPTH OF AT LEAST 2 INCHES TO
ENSURE BONDING OF THE TOPSOIL AND SUBSOIL.
ix.) TOPSOIL SHALL NOT BE PLACED WHILE IN A FROZEN OR MUDDY CONDITION, WHEN
THE SUBGRADE IS EXCESSIVELY WET, OR IN A CONDITION THAT MAY OTHERWISE BE
DETRIMENTAL TO PROPER GRADING OR PROPOSED SODDING OR SEEDING. THE
TOPSOIL SHALL BE UNIFORMLY DISTRIBUTED TO A MINIMUM COMPACTED DEPTH OF
4 INCHES. ANY IRREGULARITIES, IN THE SURFACE RESULTING FROM TOPSOILING
OR OTHER OPERATIONS SHALL BE CORRECTED IN ORDER TO PREVENT THE
FORMATION OF DEPRESSIONS OR WATER POCKETS.
x.) TOPSOIL SHOULD BE COMPACTED ENOUGH TO ENSURE GOOD CONTACT WITH THE
UNDERLYING SOIL AND TO OBTAIN A UNIFORM FIRM SEEDBED FOR THE
ESTABLISHMENT OF A LOW MAINTENANCE TURF. UNDUE COMPACTION IS TO BE
AVOIDED AS IT INCREASES RUNOFF VELOCITY AND VOLUME, AND PREVENTS SEED
GERMINATION.
e.) TEMPORARY MULCHING
INSTALLATION REQUIREMENTS
ORGANIC MULCHES
Q ORGANIC MULCHES MAY BE USED IN ANY AREA WHERE MULCH IS REQUIRED,
SUBJECT TO THE RESTRICTIONS NOTED BELOW:
ORGANIC MULCH MATERIALS AND APPLICATION RATES
RATES
MULCHES PER ACRE PER 1000 SF
STRAW OR HAY 1-1/2 - 2 TONS 70-90 LB
WOOD FIBER 1000-2000 LB 25-50 LB
CORN STALKS, 4-6 TONS 185-275 LB
WOOD CHIPS 4-6 TONS 185-275 LB
SHREDDED BARK 50-75 CY 1-2 CY
MATERIALS
E.) SELECT MULCH MATERIALS BASED ON SITE CONDITIONS, AVAILABILITY OF
MATERIALS AND LABOR AND EQUIPMENT. OTHER MATERIALS MAY BE USED ONLY
WITH THE PERMISSION OF THE APPROVING AUTHORITY.
APPLICATION
E.) MULCH MATERIALS SHALL BE SPREAD UNIFORMLY, BY HAND OR MACHINE.
WHEN SPREADING STRAW OR HAY MULCH BY HAND, DIVIDE THE AREA TO BE
MULCHED INTO APPROXIMATELY 1,000 SQUARE FOOT SECTIONS AND PLACE 70-90
POUNDS (1-1/2 TO 2 BALES) OF STRAW OR HAY IN EACH SECTION TO ENSURE
UNIFORM DISTRIBUTION.
ANCHORING
Q HAY OR STRAW MULCHES MUST BE ANCHORED IMMEDIATELY AFTER APPLICATION TO PREVENT
WINDBLOWING HAY OR STRAW MULCH MAY BE ANCHORED BY TRACKING WITH CONSTRUCTION
EQUIPMENT OR BY USING MULCH NETTING OR LIQUID MULCH BINDERS.
MAINTENANCE
T.) ALL MULCHES MUST BE INSPECTED PERIODICALLY, IN PARTICULAR AFTER
RAINSTORMS, TO CHECK FOR RILL EROSION. WHERE EROSION IS OBSERVED,
ADDITIONAL MULCH SHOULD BE APPLIED. NETS SHOULD BE INSPECTED AFTER
RAINSTORMS FOR DISLOCATION OR FAILURE. IF WASHOUTS OR BREAKAGE OCCUR,
REINSTALL NET AS NECESSARY AFTER REPAIRING DAMAGE TO THE SLOPE.
INSPECTIONS SHOULD TAKE PLACE UNTIL GRASSES ARE FIRMLY ESTABLISHED.
GRASSES SHALL NOT BE CONSIDERED ESTABLISHED UNTIL A GROUND COVER IS
ACHIEVED WHICH IS MATURE ENOUGH TO CONTROL SOIL EROSION AND TO SUR`/PIE
SEVERE WEATHER CONDITIONS. WHERE MULCH IS USED IN CONJUNCTION WITH
ORNAMENTAL PLANTINGS, INSPECT PERIODICALLY THROUGHOUT THE YEAR TO
DETERMINE IF MULCH IS MAINTAINING COVERAGE OF THE SOIL SURFACE AND
REPAIR AS NEEDED.
Q DUST CONTROL
INSTALLATION REQUIREMENTS
WATER
E.) THE EXPOSED SOIL SURFACE SHOULD BE MOISTENED PERIODICALLY WITH ADEQUATE
QUANTITIES OF WATER TO CONTROL DUST.
STONE
E.) COVER SURFACE WITH CRUSHED STONE OR COARSE GRAVEL IN AREAS ADJACENT
TO WATERWAYS USE CHEMICALLY STABLE AGGREGATE.
MAINTENANCE
i.) WHEN TEMPORARY DUST CONTROL MEASURES ARE USED, REPETITIVE TREATMENT
SHALL BE APPLIED AS NEEDED TO ACCOMPLISH CONTROL.
IP
IF
IF
IF
DH
IP
IP \
Ilk, \ ' a s
IF
IF
IF
Propo5ed Lot 31 IThI5 Lot to Rem_ Ian
th EX15tinG HoU Fwi
s a a os
Ara=12 ,. _ r_or2. 5 e
e Fso
DH
Soil 5tockpi Area (W)e`
DH a \
DH + ~ \
DH - -
IF
3
2 O IF
mg 9
Y Y Y
r +
Y + r Y
flame+ + i Y
rop05ed Lot J O, +
Area= 120,063 5F or 2. ' 1;r V__ r 3 7Ura
05 r
N1b -9_Ile
0 ,. z2 ar :rte
2 O J 3 / h
ro o d Lo ' v
ToEi rta-- i'L3>U6S5P or.83- N J 15
o ow
Iron Pipe Fd
ii?3 0 3 N
43.0t 54.95•
NOBLE HILL SUBDIVISION
NOT TO ANY STANDARD SCALE
TYPICAL. LOT SOIL EROSION
AND SEDIMENT CONTROL PLAN
NOTES:
1. UPON APPROVAL OF INDIVIDUAL SITE PLAN APPROVAL, THE LIMITS OF
DEVELOPMENT SHOULD BE ESTABLISHED IN THE FIELD FOR EACH PROPOSED
RESIDENTIAL STRUCTURE. DISTURBANCE LIMITS OF 25-35 FEET BEYOND THE
PHYSICAL DIMENSIONS OF THE STRUCTURE ARE RECOMMENDED. STAKED
HAY BALES OR FILTER FABRIC SHALL BE PLACED DOWN SLOPE OF ALL
DISTURBED AREAS WITHIN 75' OF AN ESTABLISHED WETLAND BOUNDARY.
2. ALL DRIVEWAYS AND DRIVEWAY SHOULDERS SHOULD BE STABILIZED
IMMEDIATELY UPON COMPLETION OF ROUGH GRADING. SHOULDER SEED BED
PREPARATION SHOULD FOLLOW THE GENERAL NOTES PROVIDED. HAY BALES OR
FILTER FABRIC SHOULD BE USED TO ENTRAP ANY SEDIMENT GENERATED FROM
EXPOSED SOIL SURFACES. DRIVEWAY ROADBEDS SHALL BE STABILIZED WITH
COMPACTED ROAD AGGREGATE AS SOON AS POSSIBLE.
3. TOPSOIL AND EXCAVATED SUBSOIL SHOULD BE STOCKPILED WITHIN THE AREA
OF DISTURBANCE IF NOT USED FOR ON-SITE REGRADING. EACH STOCKPILE
MUST BE ADEQUATELY RINGED WITH SEDIMENT CONTROL MATERIALS ( i.e.
HAY BALES OR FILTER FABRIC FENCING).
4. ANY ADDITIONAL STOCKPILING OF LUMBER OR BUILDING MATERIALS SHOULD
ALSO BE CONFINED TO THE AREA OF DISTURBANCE. SIMILARLY, VEHICULAR
MOVEMENT SHOULD. BE DIRECTED TO ESTABLISHED PARKING AREAS. PROPOSED
LEACHING SYSTEM AREAS MUST NOT BE IMPACTED BY VEHICULAR TRAFFIC OR
UTILIZED AS PARKING AREA. DEVELOPMENT OF SEWAGE DISPOSAL LEACHING
AREAS SHOULD BE STAGED TO FOLLOW HOUSE SITE PREPARATION. ONLY THE
PRIMARY LEACHING SYSTEM NEED BE CLEARED OF EXISTING VEGETATION IN
COORDINATION WITH THE APPROVED SEPTIC SYSTEM DESIGN. . RESERVE AREAS
SHOULD REMAIN UNALTERED IF SITE CONDITIONS PERMIT.
5. UPON 50% COMPLETION OF DWELLING CONSTRUCTION, ALL DISTURBED AREAS
SURROUNDING THE STRUCTURE SHOULD BE FINE GRADED, SEEDED, AND
MULCHED IN ACCORDANCE WITH SECTIONS III, IV AND V OF THE SOIL EROSION
AND SEDIMENT CONTROL PLAN NARRATIVE.
6. SEDIMENT AND EROSION CONTROL MEASURES SHALL BE INSTALLED AND
MAINTAINED IN ACCORDANCE WITH THE DETAILS AND PROCEDURES OUTLINED
IN THE SOIL EROSION AND SEDIMENT CONTROL PLAN NARRATIVE.
LINA
MINI-AN[2 MlLMP5 PC
OCKPIL
Ir,MEEf1
Clr:-- 2
0
7S
I
JUN 3 2007
4-
O
hi
j F=
O z
z z < W
F-W
IA W VJi'.t z3-00
F=
O
FF ---
O_
Z W "*&&g0p.*
20F-
000
wQ
cn w
L,..1
F'z0
l
Q) (j
DATE
OJ -07-02
DRAWING
PROJECT
FILE
ARCHS$
DRAWN
DESIGNED
APPROVED
SHEET O
Z
4OF4
C I
rr
II
DATE
OJ -07-02
DRAWING
PROJECT
FILE
ARCHS$
DRAWN
DESIGNED
APPROVED
SHEET O
Z
4OF4