Loading...
HomeMy WebLinkAbout23SITE3 2EnterpriseDr BondEst Rev032223ITEM QTY UNIT UNIT PRICE AMOUNT 1 Catch Basin Inserts 5 EA 500.00$ 2,500.00$ 2 Construction Entrance 1 EA 500.00$ 500.00$ 3 Topsoil 125 CY 20.00$ 2,500.00$ 4 Silt Fence 755 LF 3.00$ 2,265.00$ 5 Oil Separator 1 EA 2,000.00$ 2,000.00$ 6 Seed Mix 13500 SF 0.10$ 1,350.00$ Total 11,115.00$ Erosion & Sediment Control Bond Estimate 2 Enterprise Lane