Loading...
HomeMy WebLinkAboutSite PlanLOT DEVELOPMENT NOTES: EROSION AND SEDIMENT CONTROL PLAN: TEST HOLE DATA 1. IMPROVEMENTS DEPICTED ON THIS PIAN ARE CONCEPTUAL ONLY AND ARE INTENDED 1. CLEARING, GRUBBING, AND GRADING OF THE PROPOSED SITE WITNESSED BY MICHAEL KIRBY TO DEMONSTRATE LOT DEVELOPMENT FEASIBILITY. INDIVIDUAL SITE DEVELOPMENT TO BE LIMITED TO AREAS ADJACENT TO THE PROPOSED HOUSE UNCAS HEALTH DISTRICT - 6/6/18 PLANS WILL BE REQUIRED TO OBTAIN PERMITS FOR CONSTRUCTION. DRIVEWAY AND SEPTIC SYSTEM. ANY DEVEATION OF THE PROPOSED Da— ROVEMENTS SHOWN MAY REQUIRE APPROVALS 2. DISTURBED AREAS TO BE LOAMED, SEEDED, AND MULCHED. FROM THE TOWN OF MONTVILLE INLAND WETLANDS & WATERCOURSES COMMISSION. 3. ALL TOPSOIL TO BE STOCKPILED ON SITE AND PROTECTED TH#3A - 0"-86" SAND & GRAVEL TH#3C . - 0"-95" SAND & GRAVEL WITH HAYBALES OR SILT FENCE, NO WATER NO WATER 2. PASSIVE SOLAR ENERGY TECHNIQUES AS PRESCRIBED BY LAW HAVE BEEN CONSIDERED 4. ALL CUT AND FILL SLOPES ARE NOT TO EXCEED 3:1 SLOPES. NO LEDGE NO LEDGE IN THE DEVELOPMENT OF THIS PLAN. 5. PRIOR TO SITE DISTURBANCE, THE REPRESENTATIVE OF THE TOWN OF MONTVILLE SHALL BE NOTIFIED WHEN SEDIMENT NO MOTTLING NO MOTTLING p 3. ALL PROPOSED UTILITY CONNECTIONS SHALL BE COORDINATED WITH THE ! — CONTROL MEASURES ARE IN PLACE SO THAT THE INSPECTION TH#3B - 0"-82" SAND & GRAVEL TH#3D - 0"-34" LARGE STONES & ROCKS Z CAN OCCUR NO WATER SE SIDE OF HOLE GOVERNING UTILITY AUTHORITY. 6. THE CONTRACTOR WILL BE RESPONSIBLE FOR THE INSTALLATION 4. ALL DRIVEWAYS SHALL HAVE A PAVER APRON INSTALLED TO THE STREETLINE. 31 _ \ �� AND MAINTENANCE OF ALL REQUIRED SEDIMENT CONTROL NO LEDGE NO MOTTLING -34 -108„ SAND &GRAVEL DRIVEWAYS GRADED OVER 10% SHALT, BE PAVED. MEASURES THROUGHOUT CONSTRUCTION. NO WATER CUP CU7. DUST CONTROL WILL BE ACCOMPLISHED BY SPRAYING WITH NO LEDGE #3298\ WATER, AND IF NECESSARY THE APPLICATION OF CALCIUM CHLORIDE. NO MOTTLING CB TEMPORARY VEGETATIVE COVER: CB \ \ / TEST HOLE DATA FROM REFERENCE MAP #1 \ / MULCHES APPLICATION RATE NOTES JUNE 23,1983 PER 1000 S.F. STRAW/HAY 70-901bs. FREE FROM WEEDS TH#3 - 0"-9” TOPSOIL AND COARSE MATTER - UBSOIL 20"-60 SME SANDY HARDPAN N. \ \ — — WOOD CHIPS 185-275 lbs. FREE OF COARSE MATTER NO WATER AIR DRIED, TREAT WITH NO MOTTLING PLANTING SCHEDULE: 121bs NITROGEN / TON LEDGE @60" OCB / / \ \ SEEDING DATES: PERC RATE -.1" IN 10 MIN. / \ \ \ APRIL 1------ JUNE 15 \ \ AUGUST 1---- SEPTEMBER 15 SEED MIXTURE: f . \ ► \ \ 45% RED FESCUE CB 45% KENTUCKY BLUE GRASS PERC TEST DATA WL\#30 \ \ \ 10% PERENNIAL RYE . \ \ \ PERFORMED BY ADVANCED SURVEYS, LLC - 6/7/18 WL# i. 1 80 \ \ — \ \ :.....::'::>;: _, \ \ PERC #3 \ \ \ \ DEPTH - 36 „ ............ . ;..,. \ \ \ \ \ \ \ \ PRESOAK - 10:20 - DRY AT11:00 11:30-811 12:00-3411 11:35 -15 " 12:05 - 351/4 / 11:40-2111 12:10 - 36 DRY /— 11:45 - 251/2 11:50 - 29 1/4" ..:..:.;.., \ \ \ 11:55 - 32" PERC RATE - 3 MINUTES PER INCH -EXISTING-LflT-5_QB \ \ \ / / / / / ► / _ \ \ \ \ _- MLSS DATA y 17i \ PROPOSED LOT 50B-02 \ r \ \ EXISTING LOT #5013 \ \ \ MLSS NEED NOT BE CONSIDERED 3 BEDROOM RESIDENCE 298// 4 BEDROOM HOUSE REQUIRES 577.5 S.F. SLOPE 5% / 19 — ' .`'i << PERC RATE -1" IN 10 MINUTES ► r \ \ \ \ \ \ \ \ OF EFFECTIVE LEACHING AREA /- USE 58 FEET OF GEOMATRIX-GST 6212 (12 DEPTH) RESTRICTIVE - 60 (58 X 10.0 = 580 SX.) (IF) 20 X (IT)1.5 X (PF)1.0 = 30 250 GAL. COMPARTMENT SEPTIC TANK MLSS USE 1, REQUIRED - 30 LIMITS OF �'\ / "ter .:: 1 / _ \ ) \ \ \ \ \ \ \ MLSS PROVIDED 50 :::>._:;;:::. I \ \ \ \ \ \ W/OUTLET FILTER DEVICE 50' WETLANDS % / \ 3 BEDROOM HOUSE REQUIRES 495 S.F. -LIMITS OF REVIEW AREA /L#10 \ -I\ \ OF EFFECTIVE LEACHING AREA „ USE 50 FEET OF GEOMATRIX-GST 6212 12 DEPTH) CUP / / / / / \\ — / \ �. \ r \ \ \ \ \ \ \ \ \ \ \ \ 1 \ (50 X 10.0 = 500 S.F.) . / / / / / / / — \ _-280' �L/MITS OF, ::::;;: _.;. \ \ \ \ \ \ #17 / / — — \ \ \ \ \ USE 1,000 GAL. 2 COMPARTMENT SEPTIC TANK / r \ \ \ \ \ WETLANDS W/OUTLET FILTER DEVICE 11" urn a / 288---- � f *SNET #187 i CL &P ROPOSEI) \\\ ! '�� _ INSTALL & MAINTAIN A CONTINU uo �— - ✓ ' \ \ ` i `1 \ \ \ / WELL -------------- FOOTING LINE OF SILT FENCE (SEE DETAIL) r / /j / \ / \ \\ I — CRAIG C. HOLMES \ \ / VOL. 618 PG. 123 DRAIN (MAP 38 - LOT 40B OUTLET ) PROPOSED 2-76-- DRIVEWAY, /16 1 PRaPOSEB��50' ' / / \ UTILITIES \ \ \ & POLE 280, zg �! /f SION LANE 2 0 CB CB 2 SAT&T ��� �SNET 1 $� ' // / / - 1-1 216 \ #186 #184 2� SNET — — CLEAR ALL VEGETATION & STONEWALLS PAVED DRIVEWAY APRON PROVIDE NON -TRACKING #182 O SNET TO NEW STREETLINE ALONG SIMPSON LANE TO STREETLDM CONSTRUCTION ENTRANCE #181 AS NEEDED TO ACHIEVE 280' SIGHT DISTANCES (TVP) (SEE DETAIL) APPROVED BY THE TOWN OF MONTVILLE PLANNING & ZONING COMMISSION CHAIRMAN OR SECRETARY DATE APPROVED BY THE UNCAS HEALTH DISTRICT SIGNATURE DATE - DATE OF COMPLETION OF ALL WORK SIGNATURE DATE PASSIVE SOLAR ENERGY TECHNIQUE'S AS PRESCRIBED BY LAW HAVE BEEN CONSIDERED IN DEVELOPMENT OF THIS PLAN. LEGEND: _ CHAIRMAN OR SECRETARY VOL. VOLUME PG. PAGE PROTECT NO. 20-028 RE N/F NOW OR FORMERLY S.F. SQUARE FEET oQo DRAWN BY: R.A.D. DH DRILL HOLE �JG� DATE:2/08/2o ROI MON MONUMENT Q� IPIN IRON PIN - SCALE:'--,, 111=401 REC. RECOVERED CL&P CONNECTICUT LIGHT& POWER � -9,s. �G �T� SHEET 2 OF 2 JUj FABRIC �F�i,Q SNET SOUTHERN NEW ENGLAND TELEPHONE POST ANGLE 100 UP SLOPE REVISIONS #167 00000 STONE WALL s� _ ALF FOR STABILITY AND �U� � l�� SELF CLEANING MON'. ----- 280----- EXISTING CONTOUR - F��� MINI 4 ' PROPOSED CONTOUR COMPACTED a CONCEPTUAL DEVEL BACKFILL AeR�C TO MY KNOWLEDGE AND BELIEF, THIS MAP IS SUBSTANTIALLY CORRECT PROPOSED SILT FENCE BARRIER AS NOTED HEREON. THIS MAP IS NOT VALID WITHOUT A LIVE SIGNATURE ----- FD PROPOSED FOOTING DRAIN CONSTRUCTION ENTRANCE SILT FENCE AND THE EMBOSSED SEAL OF THE SURVEYOR HEREON. ADVANCED S • IRON PIN OR DRILL HOLE TO BE SET NOT TO SCALE NOT TO SCALE � ■ MONUMENMT TO BE SET RICHARD SCHAMPS L.S. #70019 DATE 40 20 0 40 IPhone 25 Apple Lane, Col &Fax (860) 26' - :_ GRAPHIC SCALE IN FEET