Loading...
HomeMy WebLinkAbout23SITE1 689OCR E&S Control Bond Estimate Rev 021723 Civilworks New England P.O. Box 1166 181 Watson Road, Dover, NH (603) 749-0443 EROSION and SEDIMENTATION CONTROL BOND COST ESTIMATE Breezeline - Uncasville, CT Date:2/16/2023 Plan Date:2/13/2023 Location:Breezeline Uncasville CT Uncasville, CT UNIT TOTAL DESCRIPTION UNIT QUANTITY COST COST SUBTOTAL EROSION CONTROL Silt Fence LF 430.00 2.91$ 1,251.30$ Stabilized Construction Entrance EA 1.00 2,500.00$ 2,500.00$ Temporary Sediment Basin CY 70.00 49.35$ 3,454.50$ SC150BN (Slope stabilization)ROLL 1.00 205.55$ 205.55$ 7,411$ This is an engineers opinion of probable cost. Civilworks New England has no control over the cost of labor, materials, equipment or services furnished by others or over the Contractor(s) methods of determining prices or over competitive bidding or market conditions. Civilworks New England cannot and does not guarantee that actual costs will not vary from this opinion of probable cost. TOTAL 7,411$ NOTES 22102 - Breezeline E&S Control Bond Estimate - 021623 Rev 1 2/16/2023]