Loading...
HomeMy WebLinkAbout22IWC24 Site Plan Rev 12-5-2250 50 50 50 50 50 5050 505062'80'pppppppppppppp ppppppp p p p pppppp p p p p p p ppppppppppppp p ppppppppppp p p p pppppppp p p p pp pppppppppppppppppppppppppppppppppppppppppppppppp NORWICH - NEW L O N D O N T U R N P I K E ( C O N N . R O U T E # 3 2 )OCCUM LANEPODURGIEL LANEOCCUM LANE76'36'pppppppp p p p p p p p p p p p p p p p p p p p p p p p p p p pp p p505050 50 50 50 50 50 505050 pppp pppppppp5 0 50 HYATT PLACE DRIVEScale: 1"=1000' Location Map 21-001048 DCJOB NO.DRAWN BY:OFSHEET NO. 0DRAWING SCALE: 1"=30'15 30 60 Prepared For: Uncasville, Connecticut 2040 New London Turnpike of Cover Sheet AMER CHOUDREY DATE REVISIONSNO. 2040 Route 32 Montville, Connecticut Office: (860) 536-7390 Fax: (860) 536-1644 Mailing Address: 70 Essex Street Mystic, Connecticut 06355 FEDUS ENGINEERINGCIVIL ENGINEERS LLC N:\2021\21-001048 - UNCASVILLE - 2040 ROUTE 32 - AMER CHOUDREY - GAS STATION - SITE PLAN APPROVAL\ACAD\21-001048 - UNCASVILLE - 2040 ROUTE 32 - AMER CHOUDREY - GAS STATION - SITE PLAN - 10-3-22- REV.1.DWGSubject Parcel Information OWNER: HASSAN HUSSAIN, LLC PARCEL ADDRESS: 2040 NEW ROUTE 32, MONTVILLE, CT MAILING ADDRESS: 4 BOSTON POST RD, WATERFORD, CT 06385 MBL 103/1/1A DEED: VOLUME 663 PAGE 612 AREA: 116,639 SF = 2.68 ACRES FLOOD ZONE: ZONE X PER FIRM MAP # 09011C0351G EFFECTIVE DATE: JULY 18, 2011 UTILITY POLE W/ LIGHT OVERHEAD WIRES PROPERTY LINE INDEX CONTOUR STONEWALL NOW OR FORMERLY CONTOUR FENCE LINE WATER VALVE TYPICAL DRILL HOLE POINT OF BEGINNING Legend PROPOSED TEST PIT SYMBOL EXISTING DESCRIPTION p p ADJACENT PROPERTY LINE CATCH BASIN SPOT ELEVATION MEAN HIGH WATER LINE HIGH TIDE LINE COASTAL JURISDICTIONAL LINE WETLANDS BOUNDARY/FLAG MEAN LOW WATER LINE UTILITY POLE DRAINAGE MANHOLE EASEMENT LINE ZONE LINE EXISTING WATER LINE EXISTING SEWER LINE BUILDING SETBACK LINE SEWER MANHOLE PERCOLATION TEST HYDRANT WATER SHUTOFF DRILL HOLE EX. IP / REBAR MONUMENT IRON PIN TO BE SET 61 3.17 & LINDEN LANE AT #4 LINDEN LANE, STONINGTON, CONNECTICUT", PREPARED FOR AGNES PETTINI, SCALE: 1"=40', DATE: 3/17/2003, BY: J. DEMPSEY ASSOCIATES, LLC, JEROME J. DEMPSEY, LS #18141, STC MAP #3616 4. DATE: AUG. 30, 1948 5. CONNECTICUT ROUTE 1A, A.K.A. ELM STREET, STONINGTON, CONNECTICUT, SCALE: 1"=40', DATE: OCTOBER 2000, REVISED: DECEMBER 11, 2000, BY: DIETER GARDNER & MEREEN, INC., LS #14208 (AKA CT RT 32) 16 PODURGIEL LN UNCASVILLE, CT 06382 N/F V571/495 MAILING ADDRESS 16 PODURGIEL LN BETH SCIARRONI M/B/L: 103/001/00B PO BOX 105842 ATLANTA GA 30348-5842 N/F V463/849 MAILING ADDRESS 2030 ROUTE 32 HOME DEPOT USA INC M/B/L: 099/049/000 PO BOX 105842 ATLANTA GA 30348-5842 N/F V463/849 MAILING ADDRESS 2030 ROUTE 32 HOME DEPOT USA INC M/B/L: 099/049/000 Gregg T. Fedus P.E. INLAND WETLAND SUBMISSION 2040 ROUTE 32 2040 ROUTE 32, UNCASVILLE, CONNECTICUT APPLICANT: AMER CHOUDREY PROPOSED CONVENIENCE STORE/GAS STATION SHEET LIST TABLE 1 OF 6 COVER SHEET 2 OF 6 EXISTING CONDITIONS 3 OF 6 SITE PLAN 4 OF 6 GRADING PLAN 5 OF 6 SOIL & EROSION CONTROL PLAN 6 OF 6 DETAIL SHEET CT. License No. 21231 Gregg T. Fedus P.E. UPLANDSUPLANDS UPLANDS October 3, 2022 12/05/2022 WETLAND COMMENTS 1 50 50 50 50 50 50 5050 5050pppppppppppppp ppppppp p p p pppppp p p p p p p ppppppppppppp p ppppppppppp p p p pppppppp p p p pp pppppppppppppppppppppppppppppppppppppppppppppppp NORWICH - NEW L O N D O N T U R N P I K E ( C O N N . R O U T E # 3 2 )OCCUM LANEN83° 33' 08"W218.01'N4° 24' 20"E 385.66' N2 7 ° 5 4 ' 1 3 " E 111 . 4 2 ' N60° 53' 04"W 36.66' L=130.51 R=325.00 CL=129.63 CH=S72° 23' 17"E D=23°00'27" S83° 53' 30"E 61.78' S4° 18' 48"W 114.05' S60° 53' 04"E 26.17' S6° 35' 04"W 54.13' S62° 34' 19"E 12.75'PODURGIEL LANEOCCUM LANEpppppppp p p p p p p p p p p p p p p p p p p p p p p p p p p pp p p505050 50 50 50 50 50 505050 pppp ppppppXXXpp5 0 50 HYATT PLACE DRIVES60° 35' 04"E 27.17' N83° 33' 08"W 31.22' 30' REAR YARD SETBACK 50' FRONT YARD SETB A C K 50' REAR YARD SETBACK30' S I D E Y A R D S E T B A C K 30' SIDE YARD SETBACKS6° 04' 38"W 285.29' 4' WIDE CHANNEL Scale: 1"=1000' Location Map 21-001048 DCJOB NO.DRAWN BY:OFSHEET NO. 0DRAWING SCALE: 1"=30'15 30 60 October 3, 2022 Prepared For: Uncasville, Connecticut 2040 New London Turnpike of AMER CHOUDREY DATE REVISIONSNO. 2040 Route 32 Montville, Connecticut Office: (860) 536-7390 Fax: (860) 536-1644 Mailing Address: 70 Essex Street Mystic, Connecticut 06355 FEDUS ENGINEERINGCIVIL ENGINEERS LLC N:\2021\21-001048 - UNCASVILLE - 2040 ROUTE 32 - AMER CHOUDREY - GAS STATION - SITE PLAN APPROVAL\ACAD\21-001048 - UNCASVILLE - 2040 ROUTE 32 - AMER CHOUDREY - GAS STATION - SITE PLAN - 10-3-22- REV.1.DWGSubject Parcel Information OWNER: HASSAN HUSSAIN, LLC PARCEL ADDRESS: 2040 NEW ROUTE 32, MONTVILLE, CT MAILING ADDRESS: 4 BOSTON POST RD, WATERFORD, CT 06385 MBL 103/1/1A DEED: VOLUME 663 PAGE 612 AREA: 116,639 SF = 2.68 ACRES FLOOD ZONE: ZONE X PER FIRM MAP # 09011C0351G EFFECTIVE DATE: JULY 18, 2011 UTILITY POLE W/ LIGHT OVERHEAD WIRES PROPERTY LINE INDEX CONTOUR STONEWALL NOW OR FORMERLY CONTOUR FENCE LINE WATER VALVE TYPICAL DRILL HOLE POINT OF BEGINNING Legend PROPOSED TEST PIT SYMBOL EXISTING DESCRIPTION p p ADJACENT PROPERTY LINE CATCH BASIN SPOT ELEVATION MEAN HIGH WATER LINE HIGH TIDE LINE COASTAL JURISDICTIONAL LINE WETLANDS BOUNDARY/FLAG MEAN LOW WATER LINE UTILITY POLE DRAINAGE MANHOLE EASEMENT LINE ZONE LINE EXISTING WATER LINE EXISTING SEWER LINE BUILDING SETBACK LINE SEWER MANHOLE PERCOLATION TEST HYDRANT WATER SHUTOFF DRILL HOLE EX. IP / REBAR MONUMENT IRON PIN TO BE SET 62 3.17 & LINDEN LANE AT #4 LINDEN LANE, STONINGTON, CONNECTICUT", PREPARED FOR AGNES PETTINI, SCALE: 1"=40', DATE: 3/17/2003, BY: J. DEMPSEY ASSOCIATES, LLC, JEROME J. DEMPSEY, LS #18141, STC MAP #3616 4. DATE: AUG. 30, 1948 5. CONNECTICUT ROUTE 1A, A.K.A. ELM STREET, STONINGTON, CONNECTICUT, SCALE: 1"=40', DATE: OCTOBER 2000, REVISED: DECEMBER 11, 2000, BY: DIETER GARDNER & MEREEN, INC., LS #14208 (AKA CT RT 32) 16 PODURGIEL LN UNCASVILLE, CT 06382 N/F V571/495 MAILING ADDRESS 16 PODURGIEL LN BETH SCIARRONI M/B/L: 103/001/00B PO BOX 105842 ATLANTA GA 30348-5842 N/F V463/849 MAILING ADDRESS 2030 ROUTE 32 HOME DEPOT USA INC M/B/L: 099/049/000 PO BOX 105842 ATLANTA GA 30348-5842 N/F V463/849 MAILING ADDRESS 2030 ROUTE 32 HOME DEPOT USA INC M/B/L: 099/049/000 Gregg T. Fedus P.E. CT. License No. 21231 Gregg T. Fedus P.E. UPLANDSUPLANDS UPLANDS WETLAND AREA DELINEATED BY FUSS & O'NEILL AND CONFIRMED BY DAVID LORD, SOIL SCIENTIST Existing Conditions UPLANDS UPLANDS UPLANDS UPLANDS 12/05/2022 WETLAND COMMENTS 1 50 50 50 50 50 50 5050 5050PROPOSED DRAINAGE MANHOLE 62'80'pppppppppppppp ppppppp p p p pppppp p p p p p p ppppppppppppp p ppppppppppp p p p pppppppp p p p pp pppppppppppppppppppppppppppppppppppppppppppppppp NORWICH - NEW L O N D O N T U R N P I K E ( C O N N . R O U T E # 3 2 )OCCUM LANEN83° 33' 08"W218.01'N4° 24' 20"E 385.66' N2 7 ° 5 4 ' 1 3 " E 111 . 4 2 ' N60° 53' 04"W 36.66' L=130.51 R=325.00 CL=129.63 CH=S72° 23' 17"E D=23°00'27" S83° 53' 30"E 61.78' S4° 18' 48"W 114.05' S60° 53' 04"E 26.17' S6° 35' 04"W 54.13' S62° 34' 19"E 12.75'PODURGIEL LANEPROPOSED GAS PUMP CANOPY (36x76) PROPOSED GAS PUMP (6 TYP.) 8OCCUM LANEPROPOSED CONCRETE WALKWAYPROPOSED TRASH ENCLOSURE 8'X20'76'36' 8 PROPOSED DIESEL PUMPpppppppp p p p p p p p p p p p p p p p p p p p p p p p p p p pp p p505050 50 50 50 50 50 505050 pppp ppppppXXXSTOP BAR (TYP.)pp24.0'PROPOSED PLUNGE POOL PROPOSED RETAINING WALL PROPOSED DRIVE-THRU WINDOW PROPOSED RIP RAP5 0 50 WETLAND FLAGS 1 - 46 DELINEATED BY DAVID LORD (MARCH,2022) 50' WETLAND REVIEW LINE PROPOSED LOADING AREA PROPOSED SIGN 100 SF PROPOSED F.E.U. (TYP.)PROPOSED OUTLET STRUCTURE PROPOSED AC CONDENSER (4 TYP.) PROPOSED CATCH BASIN TYPE-C (TYP.)HYATT PLACE DRIVE30.0' 30.0' PROPOSED UNDERGROUND FUEL STORAGE TANKS (TWO 15,000 GAL.) WITH CONCRETE PAD (28' X 46') S60° 35' 04"E 27.17' N83° 33' 08"W 31.22' 30' REAR YARD SETBACK 50' FRONT YARD SETB A C K 50' REAR YARD SETBACK30' S I D E Y A R D S E T B A C K 30' SIDE YARD SETBACK61.5'66.8'48.5'103.4'116.3'S6° 04' 38"W 285.29' PROPOSED DETENTION BASIN TO BE REMOVED PROPOSED BITUMINOUS CONCRETE CURB (TYP.) PROPOSED 8" RETAINING WALL PROPOSED 80'x62' BUILDING 4,960 SF FF = 177.0' TO BE REPLACED IN KIND PROPOSED PARKING STRIPING (TYP.) 20.0' 24.0' 24.0' PROPOSED GRASS SWALE PROPOSED "LEFT TURN ONLY" LANE EXTENDED 4' WIDE CHANNEL 31.6' PROPOSED LIMITS OF DISTURBANCE PROPOSED BASIN PLANTS Scale: 1"=1000' Location Map 21-001048 DCJOB NO.DRAWN BY:OFSHEET NO. 0DRAWING SCALE: 1"=30'15 30 60 October 3, 2022 Prepared For: Uncasville, Connecticut 2040 New London Turnpike of Site Plan AMER CHOUDREY DATE REVISIONSNO. 2040 Route 32 Montville, Connecticut Office: (860) 536-7390 Fax: (860) 536-1644 Mailing Address: 70 Essex Street Mystic, Connecticut 06355 FEDUS ENGINEERINGCIVIL ENGINEERS LLC N:\2021\21-001048 - UNCASVILLE - 2040 ROUTE 32 - AMER CHOUDREY - GAS STATION - SITE PLAN APPROVAL\ACAD\21-001048 - UNCASVILLE - 2040 ROUTE 32 - AMER CHOUDREY - GAS STATION - SITE PLAN - 10-3-22- REV.1.DWGSubject Parcel Information OWNER: HASSAN HUSSAIN, LLC PARCEL ADDRESS: 2040 NEW ROUTE 32, MONTVILLE, CT MAILING ADDRESS: 4 BOSTON POST RD, WATERFORD, CT 06385 MBL 103/1/1A DEED: VOLUME 663 PAGE 612 AREA: 116,639 SF = 2.68 ACRES FLOOD ZONE: ZONE X PER FIRM MAP # 09011C0351G EFFECTIVE DATE: JULY 18, 2011 NOTES: 1.AREA OF WETLAND ON SITE IS 21,832 SF/0.50 ACRES. 2.PROPOSED AREA DISTURBED IN THE 50' REVIEW ZONE IS 21,484 SF/0.49 ACRES UTILITY POLE W/ LIGHT OVERHEAD WIRES PROPERTY LINE INDEX CONTOUR STONEWALL NOW OR FORMERLY CONTOUR FENCE LINE WATER VALVE TYPICAL DRILL HOLE POINT OF BEGINNING Legend PROPOSED TEST PIT SYMBOL EXISTING DESCRIPTION p p ADJACENT PROPERTY LINE CATCH BASIN SPOT ELEVATION MEAN HIGH WATER LINE HIGH TIDE LINE COASTAL JURISDICTIONAL LINE WETLANDS BOUNDARY/FLAG MEAN LOW WATER LINE UTILITY POLE DRAINAGE MANHOLE EASEMENT LINE ZONE LINE EXISTING WATER LINE EXISTING SEWER LINE BUILDING SETBACK LINE SEWER MANHOLE PERCOLATION TEST HYDRANT WATER SHUTOFF DRILL HOLE EX. IP / REBAR MONUMENT IRON PIN TO BE SET 63 3.17 & LINDEN LANE AT #4 LINDEN LANE, STONINGTON, CONNECTICUT", PREPARED FOR AGNES PETTINI, SCALE: 1"=40', DATE: 3/17/2003, BY: J. DEMPSEY ASSOCIATES, LLC, JEROME J. DEMPSEY, LS #18141, STC MAP #3616 4. DATE: AUG. 30, 1948 5. CONNECTICUT ROUTE 1A, A.K.A. ELM STREET, STONINGTON, CONNECTICUT, SCALE: 1"=40', DATE: OCTOBER 2000, REVISED: DECEMBER 11, 2000, BY: DIETER GARDNER & MEREEN, INC., LS #14208 (AKA CT RT 32) 16 PODURGIEL LN UNCASVILLE, CT 06382 N/F V571/495 MAILING ADDRESS 16 PODURGIEL LN BETH SCIARRONI M/B/L: 103/001/00B PO BOX 105842 ATLANTA GA 30348-5842 N/F V463/849 MAILING ADDRESS 2030 ROUTE 32 HOME DEPOT USA INC M/B/L: 099/049/000 PO BOX 105842 ATLANTA GA 30348-5842 N/F V463/849 MAILING ADDRESS 2030 ROUTE 32 HOME DEPOT USA INC M/B/L: 099/049/000 Gregg T. Fedus P.E. CT. License No. 21231 Gregg T. Fedus P.E. UPLANDSUPLANDS UPLANDS C-2 ZONING REQUIREMENTS TABLE SECTION REGULATION REQUIREMENTS EXISTING PROPOSED 11.4 MINIMUM LOT SIZE 40,000 SF 116,639 SF 116,639 SF 11.5 MINIMUM LOT FRONTAGE 80'480'480' 11.6.1 MINIMUM FRONT YARD 50'---BUILDING 66.8' CANOPY 61.5' 11.6.2 MINIMUM SIDE YARD 30'---BUILDING 48.5' (S) CANOPY 168.5' (S) 11.6.3 MINIMUM REAR YARD 30'---BUILDING 103.4' CANOPY 116.3' PARKING REQUIREMENTS SECTION REGULATION MINIMUM REQ.PROPOSED 18.3.6 FREE STANDING RETAIL 5 SPACES *(4,960 SF /1000SF) = 24.8 SPACES 24.8 SPACES - 12 SPACES = 12.8 SPACES + 1 SPACE FOR TWO EMPLOYEES. TOTAL: 13.8 ≈14 15 SPACES 18 VAN-ACCESSIBLE PARKING 1 SPACE REQUIRED 1 SPACES 168.5' WETLAND AREA DELINEATED BY FUSS & O'NEILL AND CONFIRMED BY DAVID LORD, SOIL SCIENTIST PROPOSED POSITIVE LIMITING BARRIER (TYP.) 12/05/2022 WETLAND COMMENTS 1 50 50 50 50 50 50 5050 505062'80'pppppppppppppp ppppppp p p p pppppp p p p p p p ppppppppppppp p ppppppppppp p p p pppppppp p p p pp pppppppppppppppppppppppppppppppppppppppppppppppp NORWICH - NEW L O N D O N T U R N P I K E ( C O N N . R O U T E # 3 2 )OCCUM LANEN83° 33' 08"W218.01'N4° 24' 20"E 385.66' N2 7 ° 5 4 ' 1 3 " E 111 . 4 2 ' N60° 53' 04"W 36.66' L=130.51 R=325.00 CL=129.63 CH=S72° 23' 17"E D=23°00'27" S83° 53' 30"E 61.78' S4° 18' 48"W 114.05' S60° 53' 04"E 26.17' S6° 35' 04"W 54.13' S62° 34' 19"E 12.75'PODURGIEL LANEOCCUM LANE76'36'pppppppp p p p p p p p p p p p p p p p p p p p p p p p p p p pp p p505050 50 50 50 50 50 505050 pppp ppppppXXXpp186188178180 177.0180 178176174176174172158.0 PROPOSED TYPE C CATCH BASIN #1 TF = 171.35' INV. OUT = 165.11' PROPOSED TYPE C CATCH BASIN #2 TF=171.43' INV. IN = 164.42' INV. OUT= 164.32' PROPOSED 69 LF 15" HDPE S= 1.0% PROPOSED 98 LF 15" HDPE S= 5.0% PROPOSED 8 LF 15" HDPE S= 2.0% PROPOSED 17 LF 15" HDPE S= 1.5% SF SF SF SF SF SF SFSFSFSF SF SF SF SF SFSFSFSFPROPOSED F.E.U INV. 158.00' PROPOSED CONTROL STRUCTURE 1 TF = 163.5' INV. OUT = 158.00' 3" INV. OUT = 161.00' 4" INV. OUT = 163.50' GRATE PROPOSED F.E.U. INV. = 157.75' PROPOSED RETAINING WALL (DETENTION BASIN) T.O.W = 164.00'1725 0 50 PROPOSED PLUNGE POOL PROPOSED GRASS SWALE PROPOSED RIP RAP PROPOSED TRASH ENCLOSURE FF = 180.0'HYATT PLACE DRIVEPROPOSED HYDRO-DYNAMIC SEPARATOR 1 TF = 163.00' INV. IN = 158.26' INV. OUT = 158.16'176170168166164PROPOSED TYPE C CATCH BASIN #3 TF=163.36' INV. IN = 159.42' INV. OUT = 159.32' PROPOSED TYPE C CATCH BASIN (4' SUMP)#4 TF=162.50' INV. IN = 158.50' INV. OUT = 158.40' PROPOSED 41 LF 15" HDPE S= 2.0%17216 4 162 180 178 180 18 2184PROPOSED RETAINING WALL TOW = 186.00' 166 170168166164PROPOSED 8" RETAINING WALL TOW = 174.5' S60° 35' 04"E 27.17' N83° 33' 08"W 31.22' S6° 04' 38"W 285.29' TO BE REMOVED PROPOSED 80'x62' BUILDING 4,960 SF FF = 177.0' TO BE REPLACED IN KIND PROPOSED DETENTION BASIN BOTTOM ELEVATION = 158.00' 4' WIDE CHANNEL PROPOSED LIMITS OF DISTURBANCE FOLLOWS THE PROPOSED SILT FENCE Scale: 1"=1000' Location Map 21-001048 DCJOB NO.DRAWN BY:OFSHEET NO. 0DRAWING SCALE: 1"=30'15 30 60 Prepared For: Uncasville, Connecticut 2040 New London Turnpike of Grading Plan AMER CHOUDREY DATE REVISIONSNO. 2040 Route 32 Montville, Connecticut Office: (860) 536-7390 Fax: (860) 536-1644 Mailing Address: 70 Essex Street Mystic, Connecticut 06355 FEDUS ENGINEERINGCIVIL ENGINEERS LLC N:\2021\21-001048 - UNCASVILLE - 2040 ROUTE 32 - AMER CHOUDREY - GAS STATION - SITE PLAN APPROVAL\ACAD\21-001048 - UNCASVILLE - 2040 ROUTE 32 - AMER CHOUDREY - GAS STATION - SITE PLAN - 10-3-22- REV.1.DWGSubject Parcel Information OWNER: HASSAN HUSSAIN, LLC PARCEL ADDRESS: 2040 NEW ROUTE 32, MONTVILLE, CT MAILING ADDRESS: 4 BOSTON POST RD, WATERFORD, CT 06385 MBL 103/1/1A DEED: VOLUME 663 PAGE 612 AREA: 116,639 SF = 2.68 ACRES FLOOD ZONE: ZONE X PER FIRM MAP # 09011C0351G EFFECTIVE DATE: JULY 18, 2011 NOTES: 1.AREA OF WETLAND ON SITE IS 21,832 SF/0.50 ACRES. 2.PROPOSED AREA DISTURBED IN THE 50' REVIEW ZONE IS 21,484 SF/0.49 ACRES UTILITY POLE W/ LIGHT OVERHEAD WIRES PROPERTY LINE INDEX CONTOUR STONEWALL NOW OR FORMERLY CONTOUR FENCE LINE WATER VALVE TYPICAL DRILL HOLE POINT OF BEGINNING Legend PROPOSED TEST PIT SYMBOL EXISTING DESCRIPTION p p ADJACENT PROPERTY LINE CATCH BASIN SPOT ELEVATION MEAN HIGH WATER LINE HIGH TIDE LINE COASTAL JURISDICTIONAL LINE WETLANDS BOUNDARY/FLAG MEAN LOW WATER LINE UTILITY POLE DRAINAGE MANHOLE EASEMENT LINE ZONE LINE EXISTING WATER LINE EXISTING SEWER LINE BUILDING SETBACK LINE SEWER MANHOLE PERCOLATION TEST HYDRANT WATER SHUTOFF DRILL HOLE EX. IP / REBAR MONUMENT IRON PIN TO BE SET 64 3.17 & LINDEN LANE AT #4 LINDEN LANE, STONINGTON, CONNECTICUT", PREPARED FOR AGNES PETTINI, SCALE: 1"=40', DATE: 3/17/2003, BY: J. DEMPSEY ASSOCIATES, LLC, JEROME J. DEMPSEY, LS #18141, STC MAP #3616 4. DATE: AUG. 30, 1948 5. CONNECTICUT ROUTE 1A, A.K.A. ELM STREET, STONINGTON, CONNECTICUT, SCALE: 1"=40', DATE: OCTOBER 2000, REVISED: DECEMBER 11, 2000, BY: DIETER GARDNER & MEREEN, INC., LS #14208 (AKA CT RT 32) 16 PODURGIEL LN UNCASVILLE, CT 06382 N/F V571/495 MAILING ADDRESS 16 PODURGIEL LN BETH SCIARRONI M/B/L: 103/001/00B PO BOX 105842 ATLANTA GA 30348-5842 N/F V463/849 MAILING ADDRESS 2030 ROUTE 32 HOME DEPOT USA INC M/B/L: 099/049/000 PO BOX 105842 ATLANTA GA 30348-5842 N/F V463/849 MAILING ADDRESS 2030 ROUTE 32 HOME DEPOT USA INC M/B/L: 099/049/000 Gregg T. Fedus P.E. CT. License No. 21231 Gregg T. Fedus P.E. UPLANDSUPLANDS UPLANDS October 3, 2022 12/05/2022 WETLAND COMMENTS 1 WETLAND AREA DELINEATED BY FUSS & O'NEILL AND CONFIRMED BY DAVID LORD, SOIL SCIENTIST PROPOSED BASIN PLANTS SEEDED WITH WOOL - SEDGE 2" PLUG (SCIRPUS CYPERINUS) (200), -SOFT RUSH 2" PLUG (JUNUCS EFFUSUS) (75), -HOT SEDGE (CAREX LUPULINA)(75) (BASIN TO BE SEEDED BETWEEN APRIL 1 AND JUNE 1) PROPOSED 4" UNDERDRAIN 50 50 50 50 50 50 5050 505062'80'pppppppppppppp ppppppp p p p pppppp p p p p p p ppppppppppppp p ppppppppppp p p p pppppppp p p p pp pppppppppppppppppppppppppppppppppppppppppppppppp NORWICH - NEW L O N D O N T U R N P I K E ( C O N N . R O U T E # 3 2 )OCCUM LANEN83° 33' 08"W218.01'N4° 24' 20"E 385.66' N2 7 ° 5 4 ' 1 3 " E 111 . 4 2 ' N60° 53' 04"W 36.66' L=130.51 R=325.00 CL=129.63 CH=S72° 23' 17"E D=23°00'27" S83° 53' 30"E 61.78' S4° 18' 48"W 114.05' S60° 53' 04"E 26.17' S6° 35' 04"W 54.13' S62° 34' 19"E 12.75'PODURGIEL LANEOCCUM LANE76'36'pppppppp p p p p p p p p p p p p p p p p p p p p p p p p p p pp p p505050 50 50 50 50 50 505050 pppp ppppppXXXpp186188178180 177.0180 178176174176174172158.0 SF SF SF SF SF SF SFSFSFSF SF SF SF SF SFSFSFSFPROPOSED HAY BALE PROPOSED SILT FENCE IN FRONT OF HAY BALES (PROPOSED LIMITS OF DISTURBANCE FOLLOWS THE PROPOSED SILT FENCE)1725 0 50 HYATT PLACE DRIVE17617016816616417216 4 162 180 178 180 18 2184 166 170168166 164S60° 35' 04"E 27.17' N83° 33' 08"W 31.22' 30' REAR YARD SETBACK 50' FRONT YARD SETB A C K 50' REAR YARD SETBACK30' S I D E Y A R D S E T B A C K 30' SIDE YARD SETBACKS6° 04' 38"W 285.29' TO BE REMOVED PROPOSED 80'x62' BUILDING 4,960 SF FF = 177.0' TO BE REPLACED IN KIND PROPOSED STOCKPILE LOCATION 4' WIDE CHANNEL PROPOSED COIR WATTLE CHECK DAM PROPOSED COIR WATTLE CHECK DAM PROPOSED DEWATERING BASIN -WITH 15' X 15' DEWATERING BAG pppppppppppppppp76'50 5050SFSFScale: 1"=1000' Location Map 21-001048 DCJOB NO.DRAWN BY:OFSHEET NO. 0DRAWING SCALE: 1"=30'15 30 60 Prepared For: Uncasville, Connecticut 2040 New London Turnpike of Soil & Erosion Control Plan AMER CHOUDREY DATE REVISIONSNO. 2040 Route 32 Montville, Connecticut Office: (860) 536-7390 Fax: (860) 536-1644 Mailing Address: 70 Essex Street Mystic, Connecticut 06355 FEDUS ENGINEERINGCIVIL ENGINEERS LLC N:\2021\21-001048 - UNCASVILLE - 2040 ROUTE 32 - AMER CHOUDREY - GAS STATION - SITE PLAN APPROVAL\ACAD\21-001048 - UNCASVILLE - 2040 ROUTE 32 - AMER CHOUDREY - GAS STATION - SITE PLAN - 10-3-22- REV.1.DWGSubject Parcel Information OWNER: HASSAN HUSSAIN, LLC PARCEL ADDRESS: 2040 NEW ROUTE 32, MONTVILLE, CT MAILING ADDRESS: 4 BOSTON POST RD, WATERFORD, CT 06385 MBL 103/1/1A DEED: VOLUME 663 PAGE 612 AREA: 116,639 SF = 2.68 ACRES FLOOD ZONE: ZONE X PER FIRM MAP # 09011C0351G EFFECTIVE DATE: JULY 18, 2011 UTILITY POLE W/ LIGHT OVERHEAD WIRES PROPERTY LINE INDEX CONTOUR STONEWALL NOW OR FORMERLY CONTOUR FENCE LINE WATER VALVE TYPICAL DRILL HOLE POINT OF BEGINNING Legend PROPOSED TEST PIT SYMBOL EXISTING DESCRIPTION p p ADJACENT PROPERTY LINE CATCH BASIN SPOT ELEVATION MEAN HIGH WATER LINE HIGH TIDE LINE COASTAL JURISDICTIONAL LINE WETLANDS BOUNDARY/FLAG MEAN LOW WATER LINE UTILITY POLE DRAINAGE MANHOLE EASEMENT LINE ZONE LINE EXISTING WATER LINE EXISTING SEWER LINE BUILDING SETBACK LINE SEWER MANHOLE PERCOLATION TEST HYDRANT WATER SHUTOFF DRILL HOLE EX. IP / REBAR MONUMENT IRON PIN TO BE SET 65 3.17 & LINDEN LANE AT #4 LINDEN LANE, STONINGTON, CONNECTICUT", PREPARED FOR AGNES PETTINI, SCALE: 1"=40', DATE: 3/17/2003, BY: J. DEMPSEY ASSOCIATES, LLC, JEROME J. DEMPSEY, LS #18141, STC MAP #3616 4. DATE: AUG. 30, 1948 5. CONNECTICUT ROUTE 1A, A.K.A. ELM STREET, STONINGTON, CONNECTICUT, SCALE: 1"=40', DATE: OCTOBER 2000, REVISED: DECEMBER 11, 2000, BY: DIETER GARDNER & MEREEN, INC., LS #14208 (AKA CT RT 32) 16 PODURGIEL LN UNCASVILLE, CT 06382 N/F V571/495 MAILING ADDRESS 16 PODURGIEL LN BETH SCIARRONI M/B/L: 103/001/00B PO BOX 105842 ATLANTA GA 30348-5842 N/F V463/849 MAILING ADDRESS 2030 ROUTE 32 HOME DEPOT USA INC M/B/L: 099/049/000 PO BOX 105842 ATLANTA GA 30348-5842 N/F V463/849 MAILING ADDRESS 2030 ROUTE 32 HOME DEPOT USA INC M/B/L: 099/049/000 Gregg T. Fedus P.E. TWO STAKES PER BALE HAY BALE BARRIER DETAIL NOT TO SCALE FLOW DIRECTION SF SF NOT TO SCALE SILT FENCE DETAIL STEP 1 2"x4"x4' POSTS SET 8' - 10' APART EXISTING GRADE SET POSTS AND EXCAVATE A 6"x6" TRENCH. SET POSTS DOWNSLOPE. STEP 2 STEP 3 STEP 4 ANGLE 10° UPSLOPE FOR STABILITY AND SELF CLEANING 12" MIN. DEPTH 100° WIRE FENCING STAPLE THE WIRE MESH FENCING TO END POSTS. FILTER FABRIC ATTACH FILTER FABRIC TO THE WIRE FENCING AND EXTEND IT TO THE TRENCH. COMPACTED BACKFILL BACKFILL THE TRENCH AND COMPACT THE EXCAVATED SOIL. PROPOSED ANTI-TRACKING PAD N.T.S. ANTI-TRACKING PAD CT. License No. 21231 Gregg T. Fedus P.E. UPLANDSUPLANDS UPLANDS October 3, 2022 VEGETATIVE TURF ESTABLISHMENT PROCEDURE SCARIFY ALL AREAS TO BE TOPSOILED AND SEEDED. APPLY A MINIMUM OF 4 INCHES OF TOPSOIL ON ALL AREAS TO BE SEEDED. APPLY GRASS SEED, LIME, FERTILIZER AND MULCH ACCORDING TO THE FOLLOWING SCHEDULE: PERMANENT SEED MIXTURE: CREEPING RED FESCUE 2.4 LBS. PER 1,000 SQ. FT. REDTOP 0.2 TALL FESCUE 2.4 TOTAL 5.0 FERTILIZER: 10-10-10 APPLY AT 7.5 LBS. PER 1,000 SQ. FT. LIMESTONE: APPLY AT 150 LBS. PER 1,000 SQ. FT. MULCHING: SPREAD HAY OR STRAW OVER ALL AREAS AFTER SEEDING. USE 1 1/2 TO 2 BALES PER 1,000 SQ. FT. TARGET FOR 100% COVERAGE. ANCHOR BY USING NETTING OR TRACKING AS NECESSARY. SEEDING DATES: SEEDING DATES IN CONNECTICUT ARE NORMALLY APRIL 1 THROUGH JUNE 15 AND AUGUST 15 THROUGH OCTOBER 1. SEED GERMINATION NORMALLY CANNOT BE EXPECTED FROM NOVEMBER THROUGH FEBRUARY. IF ADEQUATE SEED GERMINATION IS NOT POSSIBLE DUE TO TIME OF YEAR CONSTRAINTS, MULCHING SHALL BE ADEQUATELY PROVIDED TO PROTECT THE SEED FROM WIND AND SURFACE EROSION UNTIL THE WEATHER IMPROVES AND THE SEEDING BECOMES WELL ESTABLISHED. CONSTRUCTION SEQUENCE 1.INSTALL ALL EROSION AND SEDIMENT CONTROL AS SHOWN ON APPROVED PLANS. 2.INSPECTION OF EROSION CONTROL INSTALLATION BY TOWN STAFF & DESIGN ENGINEER. 3.CLEAR AND GRUB SITE TO LIMITS OF DISTURBANCE. 4.ROUGH GRADE SITE. 5.CONSTRUCT OF RETAINING WALL. 6.CONSTRUCT BUILDING. A.EXCAVATE FOUNDATION OF BUILDING B.FORM AND POUR FOOTINGS AND WALLS C.STRIP FORMS, WATERPROOF FOUNDATIONS AND BACKFILL D.COMPACT LOWER LEVEL FLOOR AND POUR CONCRETE FLOORS E.FRAME BUILDING AND ROOFING F.INSTALL WINDOWS AND DOORS G.INSTALL SIDING H.ROUGH MECHANICALS I.INSULATE J.SHEETROCK K.INTERIOR TRIM AND DOORS L.FLOORING M.FINISH MECHANICALS N.PAINT 7.CONSTRUCT TANKS 8.CONSTRUCT CANOPY & PUMPS 9.REMOVE UTILITY POLE 10.CONSTRUCT BASIN. 11.INSTALL SEWER LINE. 12.INSTALL WATER LINE. 13.INSTALL DRAINAGE SYSTEM. 14.INSTALL UNDERGROUND ELECTRIC. 15.INSTALL SUBGRADE AND COMPACT IN PAVED AREAS. 16.INSTALL SIDEWALKS. 17.PLACE BINDER COURSE. 18.INSTALL SURFACE COURSE. 19.LOAM AND SEED DISTURBED AREAS. 20.LANDSCAPE FINISHED AREAS. 21.FINAL STABILIZATION OF SITE. 22.FINAL CLEANING OF STORMWATER SYSTEM AND GENERAL SITE CLEANUP. 23.OBTAIN FINAL INSPECTIONS. 24.REMOVE EROSION AND SEDIMENTATION CONTROL DEVICES. SOIL EROSION AND SEDIMENT CONTROL PLAN NARRATIVE THE SITE CONTRACTOR MUST FOLLOW ALL GUIDELINES SET FORTH IN THE MANUAL ENTITLED "2002 CONNECTICUT GUIDELINES FOR SOIL EROSION AND SEDIMENT CONTROL" PUBLISHED BY THE CONNECTICUT COUNCIL ON SOIL AND WATER CONSERVATION IN COOPERATION WITH THE CONNECTICUT DEPARTMENT OF ENVIRONMENTAL PROTECTION. THIS MANUAL IS ALSO KNOWN AS DEP BULLETIN 34. IN ADDITION THE SITE CONTRACTOR MUST FOLLOW THE TOWN'S ZONING AND SUBDIVISION REGULATIONS, TOWN EMERGENCY STANDARDS AND SPECIFICATIONS, CTDOT FORM 816 WHERE APPLICABLE. 12/05/2022 WETLAND COMMENTS 1 COIR WATTLE: CHECK DAMS IN SLOPES & WATERWAYS CONTROL BLANKET (ECB). MAT (TRM) OR EROSION TURF REINFORCEMENT WITH PERMANENT WOODY PLANTS. COIR WATTLE AND WILLOW FASCINES STABALIZING SLOPE WEDGE COIR WATTLEFIGURE2A FIGURE1 THAN POINT B POINT A SHOULD BE HIGHER COIR WATTLEWEDGEFIGURE2B PROPER PLACEMENT OF COIR WATTLE IN SLOPE WEDGE COIR WATTLE BA PROPER PLACEMENT OF COIR WATTLE IN DRAINAGE WAY WILLOW FASCINES NOTES: 1. ON DRAINAGE WAY LINED WITH TURF REINFORCEMENT MAT (TRM) OR EROSION CONTROL BLANKET (ECB), COIR WATTLE SHALL BE INSTALLED AS CHECK DAMS (FIG 1). 2. INSTALLATION TO BE COMPLETED IN ACCORDANCE WITH MANUFACTURER'S SPECIFICATIONS. 3. DO NOT SCALE DRAWING. 4. THIS DRAWING IS INTENDED FOR USE BY ARCHITECTS, ENGINEERS, CONTRACTORS, CONSULTANTS AND DESIGN PROFESSIONALS FOR PLANNING PURPOSES ONLY. THIS DRAWING MAY NOT BE USED FOR CONSTRUCTION. 5. ALL INFORMATION CONTAINED HEREIN WAS CURRENT AT THE TIME OF DEVELOPMENT BUT MUST BE REVIEWED AND APPROVED BY THE PRODUCT MANUFACTURER TO BE CONSIDERED ACCURATE. 6. CONTRACTOR'S NOTE: FOR PRODUCT AND COMPANY INFORMATION VISIT www.CADdetails.com/info AND ENTER REFERENCE NUMBER 084-015A. N.T.S. PROPOSED COFFER DAM AROUND FUEL TANKS PROPOSED COFFER DAM (SHEET PILLING) PROPOSED CONCRETE PAD PROPOSED FUEL TANKS 62'80'NORWICH - NEW L O N D O N T U R N P I K E ( C O N N . R O U T E # 3 2 )OCCUM LANEPODURGIEL LANEOCCUM LANE76'36' 30' REAR YARD SETBACK 50' FRONT YARD SETBACK 50' REAR YARD SETBACK30' S I D E Y A R D S E T B A C K 30' SIDE YARD SETBACKTO BE REMOVED PROPOSED80'x62'BUILDING4,960 SFFF = 177.0' TO BE REPLACED IN KIND PROPOSED RETAINING WALL (SEE DETAIL THIS SHEET). PROPOSED 15" FLARED END UNIT PROPOSED MODIFIED RIPRAP (12" THICK) EXISTING GRADE PROPOSED FEU INV=157.75' PROPOSED FILTER FABRIC PROPOSED 1-1/4" CLEAN CRUSHED STONE (BEDDING MATERIAL) PROPOSED LEVEL SPREADER LIP ELEVATION = 156.75' 15" HDPE 2 1 1' MIN. BOTTOM OF POOL ELEVATION = 155.61' 2:1 2:12:1STORM DRAIN FLOWA A SET ELEVATION 1' LOWER THAN PIPE OUTLET INVERT 17778 5101516 DRAWN CHECKED QA MFG APPROVED toddbolzer 12/21/2020 NORWESCO, INC. SAINT BONIFACIUS, MN TITLE 15000 GALLON UNDERGROUND TANK SIZE B SCALE: 1/16 PN 41615 SHEET 1 OF 1 REV 21-001048 DCJOB NO.DRAWN BY:OFSHEET NO. DRAWING SCALE: AS SHOWN Prepared For: Uncasville, Connecticut 2040 New London Turnpike of Detail AMER CHOUDREY DATE REVISIONSNO. Office: (860) 536-7390 Fax: (860) 536-1644 Mailing Address: 70 Essex Street Mystic, Connecticut 06355 FEDUS ENGINEERINGCIVIL ENGINEERS LLC N:\2021\21-001048 - UNCASVILLE - 2040 ROUTE 32 - AMER CHOUDREY - GAS STATION - SITE PLAN APPROVAL\ACAD\21-001048 - UNCASVILLE - 2040 ROUTE 32 - AMER CHOUDREY - GAS STATION - SITE PLAN - 10-3-22- REV.1.DWG66 3.17 & LINDEN LANE AT #4 LINDEN LANE, STONINGTON, CONNECTICUT", PREPARED FOR AGNES PETTINI, SCALE: 1"=40', DATE: 3/17/2003, BY: J. DEMPSEY ASSOCIATES, LLC, JEROME J. DEMPSEY, LS #18141, STC MAP #3616 4. DATE: AUG. 30, 1948 5. CONNECTICUT ROUTE 1A, A.K.A. ELM STREET, STONINGTON, CONNECTICUT, SCALE: 1"=40', DATE: OCTOBER 2000, REVISED: DECEMBER 11, 2000, BY: DIETER GARDNER & MEREEN, INC., LS #14208 (AKA CT RT 32) Gregg T. Fedus P.E. TRUCK TURNING TEMPLATE NOT TO SCALE CT. License No. 21231 Gregg T. Fedus P.E. PROPOSED FUEL TANKS TRUCK'S TURNING RADIUS NOTE: TRUCK USED WAS AASHTO WB-55 INTERSTATE SEMI-TRAILER (LENGTH = 65.8') October 3, 2022 3 5/8"3 5/8"15 15/16"15 15/16"11 1/2"TYPE "C" CATCH BASIN DETAIL TYPE "C" CATCH BASIN DETAIL TYPE "C" CATCH BASIN.DWG NOT TO SCALE 12" 7 5/8" 8" 5'-4" 4'-0" SECTION A-A 12" 7 5/8" 2'-8 3/4"2'-0" MIN.SECTION B-B6"6"8"8"3'-0" 4'-4"2'-0"2'-0"VARIABLEVARIABLE12"2'-1 3/8" 2 13/16" 7 13/16" 8" 8" 1. REMOVE HAYBALE BARRIER AFTER PERMANENT GROUNDCOVER HAS BEEN ESTABLLISHED. 2. CLEAN SUMPS AFTER REMOVAL OF BARRIER. 3. CATCH BASINS SHALL BE PRECAST UNITS. 2'-2 3/8" A 2'-2 3/8" 5'-4" B PLAN B 10 3/16" A 4'-4"10 3/16"10" NOTES: 10"2" 3 13/16" 2"2" 1"2 13/16"2" 2:1 M I N . VARIES VARIES 2:1 MI N. PROPOSED GRADE DENSE GRASS GROWTH GRASS DRAINAGE SWALE NOT TO SCALE PLUNGE POOL DETAIL (LOOKING NORTH) SCALE: 1"=5' DUMPSTER ENCLOSURE DETAIL NOT TO SCALE 6' HIGH WOODEN STOCKADE FENCE SUPPORT POST SECURED TO CONCRETE PAD (TYPICAL) CONCRETE PAD 6' WOODEN STOCKADE GATE (TYPICAL)8-0"20'-0" DUMPSTER Specifications Outlet 1. Must be independently tested to the 2013 NJDEP Laboratory Protocol and 2013 ETV Canada protocol (ISO 14024:2016). Separator must be sized based on this data. 2. Any testing performed by the manufacturer is unacceptableto demonstrate an alternate equal. 3. Field Testing is unreliable, site and storm specific, and subjectto compounding equipment and analytical errors and thereforeis unacceptable as verification of an alternate equal. TARP verfication as per NJDEP is testing consistent with the 2013 NJDEP laboratory protocol. 4. The separator must be designed based on the following criteria: Flow Criteria Water Quality FLow Rate cfs (L/s) Peak Design Flow Rate cfs TSS Removal Criteria Annual TSS Removal (%) NJDEP/ETV Canada TSS OK110 Sand City of Toronto Other Notes: 1. Headloss K factor of 1.04 for hydraulic gradeline calculations 2. Sump depths shown are typical. Additional depth can be added as required 3. Multiple inlet pipes allowed 4. Drops allowed 5. Inlet invert elevations should be the same or higher than the outlet invert elevation.Inlet can be up to 12" (300 mm) lower than outlet if pretreatment area is omitted but 12" (300 mm) must be added to sump depth to maintain overall treatment volume. 6. Solid Cover shown. HydroStorm can be desiged with an inlet grate if required. 7. Oil capacities given are spill capacities. 8. Sediment depths are maximum holding capacities and not recommended capacities forregular maintenance. 9. Capacities are rounded down to nearest 5 gal or ft3 (1L or 0.1 m3 for metric units) 10. Base Extensions not provided on standard units larger than the HS 6. Extensions can be provided if required due to groundwater/buoyancy concerns at the request of the engineer of record. 11. HS4 to HS6 models require one frame and cover. HS7 to HS12 models require two covers REVISION DATE: 12/5/2022 D H Plan Inlet HydroStorm Components A. Perforated Scour Plate B. Outlet DiskC. Pretreatment DiskD. Pretreatment GrateE. Inner Chamber F. By-Pass Weirs G. Frame and Cover (1-2)H. Inlet and Outlet PipesI. Structure Diameter J. Base Extension (HS4 - HS6)K. Sump Depth A Profile HydroStorm by Hydroworks, LLCUS Patent No. 10,710,907 www.hydroworks.com 888-290-7900 Model HS 3 HS 4 HS 5 HS 6 HS 7 HS 8 HS 10 HS 12 Diameter ft (m)(9) 3 (0.9) 4 (1.2) 5 (1.5) 6 (1.8) Sump Depth ft(m)(11) HydroStorm Dimensions / Capacities (8)Inner ChamberDiam. ft (m) (5)Max. Pipe in(mm)Oil Spill Volumegal (L)Sediment Volumeft3 (m3)Total Volume gal (L) 3 (0.9) 1.5 (0.45) 18 (450) 40 (155) 10 (0.35) 155 (600) 4 (1.2) 48" J G E Inlet B K F H I HF As Required 3 Inlet Elev. Outlet Elev. Inlet D 24"Outlet C H F 30" 2 (0.6) 24 (600) 95 (375) 30 (0.85) 375 (1420) 5 (1.5) 2.5 (0.8) 30 (750) 165 (635) 60 (1.8) 730 (2780) 6 (1.8) 7 (2.1) 3 (0.9) 36 (900) 270 (1030) 110 (3.2) 1265 (4800) 7 (2.1) 6.5 (2.0) 3.5 (1.0) 42 (1050) 410 (1560) 160 (4.6) 1870 (7080) 8 (2.4) 10 (3.0) 9 (2.7) 4 (1.2) 48 (1200) 615 (2330) 220 (6.2) 2630 (9960) 5 (1.5) 60 (1500) 1130 (4285) 465 (13.1) 5285 (20015) 12 (3.6) 11 (3.3) 6 (1.8) 72 (1800) 1875 (7100) 835 (23.7) 9305 (35225) Hydroworks HydroStorm PROJECT: LOCATION: NA 4.57 85 NA NA NA NA 2040 ROUTE 32, UNCASVILLE 2040 ROUTE 32 ·HYDROWORKS HYDROSTORM -THE HYDRODOME SEPARATOR SHOULD BE INSPECTED EVERY FOUR WEEKS AND AFTER EVERY LARGE STORM (OVER 0.5” (12.5 MM) OF RAIN) DURING THE CONSTRUCTION PERIOD. -INSPECT AT LEAST TWICE A YEAR. -THE MAINTENANCE FOR SEDIMENT ACCUMULATION IS REQUIRED IF THE DEPTH OF SEDIMENT IS 1FT OR GREATER IN SEPARATORS WITH STANDARD WATER (SUMP) DEPTHS. -LOOK FOR OBSTRUCTIONS IN INLETS. -CLEAN ANY FLOATING DEBRIS IN THE SEPARATOR DURING THE INSPECTION. -LOOK FOR ANY CRACKING OR DEFICIENCIES IN THE CONCRETE. ·DETENTION BASIN -MAKE SURE BASIN SURFACE IS CLEAR OF DEBRIS. -MOWING PERFORMED WHEN NECESSARY. -CHECK IF THERE IS EVIDENCE OF VEGETATION EROSION AND THAT VEGETATION COVERAGE IS ADEQUATE. IF NOT REPLACE VEGETATION. -MAKE SURE THAT DRAWDOWN TIMES DO NOT EXCEED 36 TO 48 HOURS. -FIRST FEW MONTHS AFTER CONSTRUCTION CHECK FOR EROSION AFTER MAJOR STORMS. -MAKE SURE OUTLET IS CLEAR OF DEBRIS. -MAKE SURE OVERFLOW SPILLWAY/EMERGENCY SPILLWAY IS CLEAR OF DEBRIS. -IF FILTER FABRIC IS EXPOSED/RIPPED REPLACE. -INSPECT AT LEAST TWICE A YEAR. -BASIN MOWED AND CLIPPINGS REMOVED. · CATCH BASIN -CLEAN AT LEAST ANNUALLY, AFTER THE SNOW AND ICE REMOVAL SEASON IS OVER AND AS SOON AS POSSIBLE BEFORE SPRING RAINFALL EVENTS.. -IF A CATCH BASIN SIGNIFICANTLY EXCEEDS THIS ONE-HALF DEPTH STANDARD DURING THE ANNUAL INSPECTION, THEN IT SHOULD BE CLEANED MORE FREQUENTLY. #4 EACH WAY 1' O.C. RETAINING WALL #5 HORIZ. 1' O.C. #6 VERT. 1' O.C. #5 EACH WAY 1' O.C. FINISHED GRADE 158.0' BACKFILL W/ FREE DRAINING MATERIAL NOTE: PRIOR TO CONSTRUCTION, RETAINING WALL DESIGN SHALL BE REVIEWED BY STRUCTURAL ENGINEER. FINISHED GRADE NOT TO SCALE TOP OF WALL 164.00' SOIL EROSION AND SEDIMENT CONTROLS ALL ADJACENT PROPERTIES AND RECEIVING WATERCOURSES AND / OR WETLAND AREAS SHALL BE ADEQUATELY PROTECTED FROM SOIL EROSION AND SEDIMENTATION BOTH DURING AND AFTER CONSTRUCTION. ADDITIONAL EROSION AND SEDIMENT CONTROLS MAY BE REQUIRED BY THE TOWN AND SHALL BE INSTALLED AND MAINTAINED BY THE CONTRACTOR. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE PROPER INSTALLATION AND MAINTENANCE OF ALL EROSION AND SEDIMENT CONTROLS BEFORE, DURING AND AFTER CONSTRUCTION. THE CONTRACTOR IS ALSO RESPONSIBLE FOR THE PROPER REMOVAL AND DISPOSAL OF ALL EROSION AND SEDIMENT CONTROLS ONCE THE SITE IS COMPLETELY STABILIZED. ALL ACCUMULATED SEDIMENTS AT ALL EROSION AND SEDIMENT CONTROLS SHALL BE PERIODICALLY REMOVED AND SPREAD IN AREAS THAT ARE NOT SUBJECT TO EROSION. ALL EROSION AND SEDIMENT CONTROLS SHALL BE INSPECTED WEEKLY AND AFTER ALL RAINFALL EVENTS. E & S CONTROLS SHALL BE REPAIRED OR REPLACED AS NECESSARY WITHIN 24 HOURS THROUGHOUT THE CONSTRUCTION DURATION. THE PERMITTEE SHALL EMPLOY BEST MANAGEMENT PRACTICES, CONSISTENT WITH THE TERMS AND CONDITIONS OF THE INLAND WETLANDS PERMIT, TO CONTROL STORMWATER DISCHARGES AND TO PREVENT EROSION AND SEDIMENTATION AND TO OTHERWISE PREVENT POLLUTION OF WETLANDS OR WATERCOURSES. THE PERMITTEE SHALL IMMEDIATELY INFORM THE TOWN WETLANDS OFFICER OF ANY PROBLEMS INVOLVING WETLANDS OR WATERCOURSES THAT HAVE DEVELOPED IN THE COURSE OF, OR THAT ARE CAUSED BY, THE AUTHORIZED WORK. THE RESPONSIBLE CONTACT PERSON FOR THE INSTALLATION AND MAINTENANCE OR EROSION AND SEDIMENTATION CONTROLS ON THIS PROJECT WILL BE THE SITE CONTRACTOR. THE CONTACT INFORMATION FOR THE CONTRACTOR WILL BE MADE AVAILABLE TO THE TOWN AS SOON AS IT IS AVAILABLE. ALL CONSTRUCTION SITE RUNOFF SHALL BE ROUTED INTERNALLY TO STORMWATER MANAGMENT AREA. SEDIMENT SHALL BE MONITORED, MAINTAINED AND REMOVED AFTER EACH STORM EVENT IN EXCESS OF 1" OF RAINFALL OR WHEN THE CAPACITY EXCEEDS 50% OF THE STORAGE VOLUME. EROSION AND SEDIMENT CONTROLS SHALL BE INSPECTED WEEKLY AND AFTER ALL RAINFALL EVENTS. E & S CONTROLS SHALL BE REPAIRED OR REPLACED AS NECESSARY WITHIN 24 HOURS THROUGHOUT THE CONSTRUCTION DURATION. TYPICAL STOCKPILE DETAIL SILT FENCE BARRIER AROUND STOCKPILE STOCKPILE EXISTING GRADE NOTE: ANY STOCKPILE THAT WILL REMAIN UNDISTURBED FOR A PERIOD LONGER THAN 30 DAYS SHALL BE SEEDED WITH A TEMPORARY GRASS SEED MIXTURE TO PREVENT EXCESSIVE EROSION AND SEDIMENTATION. SIZING WAS DONE USINGHYDROWORKS SOFTWARE. 12/05/2022 WETLAND COMMENTS 1