HomeMy WebLinkAbout22IWC24 Site Plan Rev 12-5-2250
50
50 50
50
50 5050 505062'80'pppppppppppppp ppppppp p
p
p pppppp p p p p p p ppppppppppppp
p
ppppppppppp
p
p
p
pppppppp
p
p
p
pp
pppppppppppppppppppppppppppppppppppppppppppppppp
NORWICH - NEW
L
O
N
D
O
N
T
U
R
N
P
I
K
E
(
C
O
N
N
.
R
O
U
T
E
#
3
2
)OCCUM LANEPODURGIEL LANEOCCUM LANE76'36'pppppppp
p
p
p
p p p p p p p p p p
p p p p
p
p
p
p
p
p p p
p
pp
p p505050
50 50 50
50
50
505050
pppp
pppppppp5
0
50
HYATT PLACE DRIVEScale: 1"=1000'
Location Map
21-001048 DCJOB NO.DRAWN BY:OFSHEET NO.
0DRAWING SCALE: 1"=30'15 30 60
Prepared For:
Uncasville, Connecticut
2040 New London Turnpike
of
Cover Sheet
AMER CHOUDREY
DATE REVISIONSNO.
2040 Route 32
Montville, Connecticut
Office: (860) 536-7390 Fax: (860) 536-1644
Mailing Address: 70 Essex Street Mystic, Connecticut 06355
FEDUS ENGINEERINGCIVIL ENGINEERS LLC
N:\2021\21-001048 - UNCASVILLE - 2040 ROUTE 32 - AMER CHOUDREY - GAS STATION - SITE PLAN APPROVAL\ACAD\21-001048 - UNCASVILLE - 2040 ROUTE 32 - AMER CHOUDREY - GAS STATION - SITE PLAN - 10-3-22- REV.1.DWGSubject Parcel Information
OWNER: HASSAN HUSSAIN, LLC
PARCEL ADDRESS: 2040 NEW ROUTE 32, MONTVILLE, CT
MAILING ADDRESS: 4 BOSTON POST RD, WATERFORD, CT 06385
MBL 103/1/1A
DEED: VOLUME 663 PAGE 612
AREA: 116,639 SF = 2.68 ACRES
FLOOD ZONE: ZONE X PER FIRM MAP # 09011C0351G
EFFECTIVE DATE: JULY 18, 2011
UTILITY POLE W/ LIGHT
OVERHEAD WIRES
PROPERTY LINE
INDEX CONTOUR
STONEWALL
NOW OR FORMERLY
CONTOUR
FENCE LINE
WATER VALVE
TYPICAL
DRILL HOLE
POINT OF BEGINNING
Legend
PROPOSED
TEST PIT
SYMBOL
EXISTING
DESCRIPTION
p p
ADJACENT PROPERTY LINE
CATCH BASIN
SPOT ELEVATION
MEAN HIGH WATER LINE
HIGH TIDE LINE
COASTAL JURISDICTIONAL
LINE
WETLANDS BOUNDARY/FLAG
MEAN LOW WATER LINE
UTILITY POLE
DRAINAGE MANHOLE
EASEMENT LINE
ZONE LINE
EXISTING WATER LINE
EXISTING SEWER LINE
BUILDING SETBACK LINE
SEWER MANHOLE
PERCOLATION TEST
HYDRANT
WATER SHUTOFF
DRILL HOLE
EX. IP / REBAR
MONUMENT
IRON PIN TO BE SET
61
3.17 & LINDEN LANE AT #4 LINDEN LANE, STONINGTON, CONNECTICUT", PREPARED FOR
AGNES PETTINI, SCALE: 1"=40', DATE: 3/17/2003, BY: J. DEMPSEY ASSOCIATES, LLC,
JEROME J. DEMPSEY, LS #18141, STC MAP #3616
4.
DATE: AUG. 30, 1948
5.
CONNECTICUT ROUTE 1A, A.K.A. ELM STREET, STONINGTON, CONNECTICUT, SCALE:
1"=40', DATE: OCTOBER 2000, REVISED: DECEMBER 11, 2000, BY: DIETER GARDNER &
MEREEN, INC., LS #14208
(AKA CT RT 32)
16 PODURGIEL LN
UNCASVILLE, CT 06382
N/F
V571/495
MAILING ADDRESS
16 PODURGIEL LN
BETH SCIARRONI
M/B/L: 103/001/00B
PO BOX 105842
ATLANTA GA 30348-5842
N/F
V463/849
MAILING ADDRESS
2030 ROUTE 32
HOME DEPOT USA INC
M/B/L: 099/049/000
PO BOX 105842
ATLANTA GA 30348-5842
N/F
V463/849
MAILING ADDRESS
2030 ROUTE 32
HOME DEPOT USA INC
M/B/L: 099/049/000
Gregg T. Fedus P.E.
INLAND WETLAND SUBMISSION
2040 ROUTE 32
2040 ROUTE 32, UNCASVILLE, CONNECTICUT
APPLICANT:
AMER CHOUDREY
PROPOSED CONVENIENCE STORE/GAS STATION
SHEET LIST TABLE
1 OF 6 COVER SHEET
2 OF 6 EXISTING CONDITIONS
3 OF 6 SITE PLAN
4 OF 6 GRADING PLAN
5 OF 6 SOIL & EROSION CONTROL PLAN
6 OF 6 DETAIL SHEET
CT. License No. 21231
Gregg T. Fedus P.E.
UPLANDSUPLANDS
UPLANDS
October 3, 2022
12/05/2022 WETLAND COMMENTS 1
50
50
50 50
50
50 5050 5050pppppppppppppp ppppppp p
p
p pppppp p p p p p p ppppppppppppp
p
ppppppppppp
p
p
p
pppppppp
p
p
p
pp
pppppppppppppppppppppppppppppppppppppppppppppppp
NORWICH - NEW
L
O
N
D
O
N
T
U
R
N
P
I
K
E
(
C
O
N
N
.
R
O
U
T
E
#
3
2
)OCCUM LANEN83° 33' 08"W218.01'N4° 24' 20"E
385.66'
N2
7
°
5
4
'
1
3
"
E
111
.
4
2
'
N60° 53' 04"W
36.66'
L=130.51
R=325.00
CL=129.63
CH=S72° 23' 17"E
D=23°00'27"
S83° 53' 30"E
61.78'
S4° 18' 48"W
114.05'
S60° 53' 04"E
26.17'
S6° 35' 04"W
54.13'
S62° 34' 19"E
12.75'PODURGIEL LANEOCCUM LANEpppppppp
p
p
p
p p p p p p p p p p
p p p p
p
p
p
p
p p p p
p
pp
p p505050
50 50 50
50
50
505050
pppp
ppppppXXXpp5
0
50
HYATT PLACE DRIVES60° 35' 04"E
27.17'
N83° 33' 08"W
31.22'
30' REAR YARD SETBACK
50' FRONT YARD SETB
A
C
K 50' REAR YARD SETBACK30'
S
I
D
E
Y
A
R
D
S
E
T
B
A
C
K
30' SIDE YARD SETBACKS6° 04' 38"W
285.29'
4' WIDE CHANNEL
Scale: 1"=1000'
Location Map
21-001048 DCJOB NO.DRAWN BY:OFSHEET NO.
0DRAWING SCALE: 1"=30'15 30 60
October 3, 2022
Prepared For:
Uncasville, Connecticut
2040 New London Turnpike
of
AMER CHOUDREY
DATE REVISIONSNO.
2040 Route 32
Montville, Connecticut
Office: (860) 536-7390 Fax: (860) 536-1644
Mailing Address: 70 Essex Street Mystic, Connecticut 06355
FEDUS ENGINEERINGCIVIL ENGINEERS LLC
N:\2021\21-001048 - UNCASVILLE - 2040 ROUTE 32 - AMER CHOUDREY - GAS STATION - SITE PLAN APPROVAL\ACAD\21-001048 - UNCASVILLE - 2040 ROUTE 32 - AMER CHOUDREY - GAS STATION - SITE PLAN - 10-3-22- REV.1.DWGSubject Parcel Information
OWNER: HASSAN HUSSAIN, LLC
PARCEL ADDRESS: 2040 NEW ROUTE 32, MONTVILLE, CT
MAILING ADDRESS: 4 BOSTON POST RD, WATERFORD, CT 06385
MBL 103/1/1A
DEED: VOLUME 663 PAGE 612
AREA: 116,639 SF = 2.68 ACRES
FLOOD ZONE: ZONE X PER FIRM MAP # 09011C0351G
EFFECTIVE DATE: JULY 18, 2011
UTILITY POLE W/ LIGHT
OVERHEAD WIRES
PROPERTY LINE
INDEX CONTOUR
STONEWALL
NOW OR FORMERLY
CONTOUR
FENCE LINE
WATER VALVE
TYPICAL
DRILL HOLE
POINT OF BEGINNING
Legend
PROPOSED
TEST PIT
SYMBOL
EXISTING
DESCRIPTION
p p
ADJACENT PROPERTY LINE
CATCH BASIN
SPOT ELEVATION
MEAN HIGH WATER LINE
HIGH TIDE LINE
COASTAL JURISDICTIONAL
LINE
WETLANDS BOUNDARY/FLAG
MEAN LOW WATER LINE
UTILITY POLE
DRAINAGE MANHOLE
EASEMENT LINE
ZONE LINE
EXISTING WATER LINE
EXISTING SEWER LINE
BUILDING SETBACK LINE
SEWER MANHOLE
PERCOLATION TEST
HYDRANT
WATER SHUTOFF
DRILL HOLE
EX. IP / REBAR
MONUMENT
IRON PIN TO BE SET
62
3.17 & LINDEN LANE AT #4 LINDEN LANE, STONINGTON, CONNECTICUT", PREPARED FOR
AGNES PETTINI, SCALE: 1"=40', DATE: 3/17/2003, BY: J. DEMPSEY ASSOCIATES, LLC,
JEROME J. DEMPSEY, LS #18141, STC MAP #3616
4.
DATE: AUG. 30, 1948
5.
CONNECTICUT ROUTE 1A, A.K.A. ELM STREET, STONINGTON, CONNECTICUT, SCALE:
1"=40', DATE: OCTOBER 2000, REVISED: DECEMBER 11, 2000, BY: DIETER GARDNER &
MEREEN, INC., LS #14208
(AKA CT RT 32)
16 PODURGIEL LN
UNCASVILLE, CT 06382
N/F
V571/495
MAILING ADDRESS
16 PODURGIEL LN
BETH SCIARRONI
M/B/L: 103/001/00B
PO BOX 105842
ATLANTA GA 30348-5842
N/F
V463/849
MAILING ADDRESS
2030 ROUTE 32
HOME DEPOT USA INC
M/B/L: 099/049/000
PO BOX 105842
ATLANTA GA 30348-5842
N/F
V463/849
MAILING ADDRESS
2030 ROUTE 32
HOME DEPOT USA INC
M/B/L: 099/049/000
Gregg T. Fedus P.E.
CT. License No. 21231
Gregg T. Fedus P.E.
UPLANDSUPLANDS
UPLANDS
WETLAND AREA DELINEATED BY
FUSS & O'NEILL
AND CONFIRMED BY DAVID LORD,
SOIL SCIENTIST
Existing Conditions
UPLANDS
UPLANDS
UPLANDS
UPLANDS
12/05/2022 WETLAND COMMENTS 1
50
50
50 50
50
50 5050 5050PROPOSED
DRAINAGE MANHOLE
62'80'pppppppppppppp ppppppp p
p
p pppppp p p p p p p ppppppppppppp
p
ppppppppppp
p
p
p
pppppppp
p
p
p
pp
pppppppppppppppppppppppppppppppppppppppppppppppp
NORWICH - NEW
L
O
N
D
O
N
T
U
R
N
P
I
K
E
(
C
O
N
N
.
R
O
U
T
E
#
3
2
)OCCUM LANEN83° 33' 08"W218.01'N4° 24' 20"E
385.66'
N2
7
°
5
4
'
1
3
"
E
111
.
4
2
'
N60° 53' 04"W
36.66'
L=130.51
R=325.00
CL=129.63
CH=S72° 23' 17"E
D=23°00'27"
S83° 53' 30"E
61.78'
S4° 18' 48"W
114.05'
S60° 53' 04"E
26.17'
S6° 35' 04"W
54.13'
S62° 34' 19"E
12.75'PODURGIEL LANEPROPOSED
GAS PUMP CANOPY
(36x76)
PROPOSED
GAS PUMP
(6 TYP.)
8OCCUM LANEPROPOSED
CONCRETE WALKWAYPROPOSED
TRASH ENCLOSURE
8'X20'76'36'
8
PROPOSED
DIESEL PUMPpppppppp
p
p
p
p p p p p p p p p p
p p p p
p
p
p
p
p p p p
p
pp
p p505050
50 50 50
50
50
505050
pppp
ppppppXXXSTOP BAR
(TYP.)pp24.0'PROPOSED
PLUNGE POOL
PROPOSED
RETAINING WALL
PROPOSED
DRIVE-THRU WINDOW
PROPOSED
RIP RAP5
0
50
WETLAND FLAGS 1 - 46
DELINEATED BY DAVID LORD
(MARCH,2022)
50' WETLAND REVIEW LINE
PROPOSED
LOADING AREA
PROPOSED
SIGN 100 SF
PROPOSED
F.E.U.
(TYP.)PROPOSED
OUTLET STRUCTURE
PROPOSED
AC CONDENSER
(4 TYP.)
PROPOSED
CATCH BASIN
TYPE-C
(TYP.)HYATT PLACE DRIVE30.0'
30.0'
PROPOSED
UNDERGROUND FUEL STORAGE TANKS
(TWO 15,000 GAL.) WITH CONCRETE PAD
(28' X 46')
S60° 35' 04"E
27.17'
N83° 33' 08"W
31.22'
30' REAR YARD SETBACK
50' FRONT YARD SETB
A
C
K 50' REAR YARD SETBACK30'
S
I
D
E
Y
A
R
D
S
E
T
B
A
C
K
30' SIDE YARD SETBACK61.5'66.8'48.5'103.4'116.3'S6° 04' 38"W
285.29'
PROPOSED
DETENTION BASIN
TO BE REMOVED
PROPOSED
BITUMINOUS CONCRETE CURB
(TYP.)
PROPOSED
8" RETAINING WALL
PROPOSED
80'x62'
BUILDING
4,960 SF
FF = 177.0'
TO BE REPLACED IN KIND
PROPOSED
PARKING STRIPING
(TYP.)
20.0'
24.0'
24.0'
PROPOSED
GRASS SWALE
PROPOSED
"LEFT TURN ONLY"
LANE EXTENDED
4' WIDE CHANNEL
31.6'
PROPOSED LIMITS
OF DISTURBANCE
PROPOSED
BASIN PLANTS
Scale: 1"=1000'
Location Map
21-001048 DCJOB NO.DRAWN BY:OFSHEET NO.
0DRAWING SCALE: 1"=30'15 30 60
October 3, 2022
Prepared For:
Uncasville, Connecticut
2040 New London Turnpike
of
Site Plan
AMER CHOUDREY
DATE REVISIONSNO.
2040 Route 32
Montville, Connecticut
Office: (860) 536-7390 Fax: (860) 536-1644
Mailing Address: 70 Essex Street Mystic, Connecticut 06355
FEDUS ENGINEERINGCIVIL ENGINEERS LLC
N:\2021\21-001048 - UNCASVILLE - 2040 ROUTE 32 - AMER CHOUDREY - GAS STATION - SITE PLAN APPROVAL\ACAD\21-001048 - UNCASVILLE - 2040 ROUTE 32 - AMER CHOUDREY - GAS STATION - SITE PLAN - 10-3-22- REV.1.DWGSubject Parcel Information
OWNER: HASSAN HUSSAIN, LLC
PARCEL ADDRESS: 2040 NEW ROUTE 32, MONTVILLE, CT
MAILING ADDRESS: 4 BOSTON POST RD, WATERFORD, CT 06385
MBL 103/1/1A
DEED: VOLUME 663 PAGE 612
AREA: 116,639 SF = 2.68 ACRES
FLOOD ZONE: ZONE X PER FIRM MAP # 09011C0351G
EFFECTIVE DATE: JULY 18, 2011
NOTES:
1.AREA OF WETLAND ON SITE IS 21,832 SF/0.50 ACRES.
2.PROPOSED AREA DISTURBED IN THE 50' REVIEW ZONE IS 21,484 SF/0.49 ACRES
UTILITY POLE W/ LIGHT
OVERHEAD WIRES
PROPERTY LINE
INDEX CONTOUR
STONEWALL
NOW OR FORMERLY
CONTOUR
FENCE LINE
WATER VALVE
TYPICAL
DRILL HOLE
POINT OF BEGINNING
Legend
PROPOSED
TEST PIT
SYMBOL
EXISTING
DESCRIPTION
p p
ADJACENT PROPERTY LINE
CATCH BASIN
SPOT ELEVATION
MEAN HIGH WATER LINE
HIGH TIDE LINE
COASTAL JURISDICTIONAL
LINE
WETLANDS BOUNDARY/FLAG
MEAN LOW WATER LINE
UTILITY POLE
DRAINAGE MANHOLE
EASEMENT LINE
ZONE LINE
EXISTING WATER LINE
EXISTING SEWER LINE
BUILDING SETBACK LINE
SEWER MANHOLE
PERCOLATION TEST
HYDRANT
WATER SHUTOFF
DRILL HOLE
EX. IP / REBAR
MONUMENT
IRON PIN TO BE SET
63
3.17 & LINDEN LANE AT #4 LINDEN LANE, STONINGTON, CONNECTICUT", PREPARED FOR
AGNES PETTINI, SCALE: 1"=40', DATE: 3/17/2003, BY: J. DEMPSEY ASSOCIATES, LLC,
JEROME J. DEMPSEY, LS #18141, STC MAP #3616
4.
DATE: AUG. 30, 1948
5.
CONNECTICUT ROUTE 1A, A.K.A. ELM STREET, STONINGTON, CONNECTICUT, SCALE:
1"=40', DATE: OCTOBER 2000, REVISED: DECEMBER 11, 2000, BY: DIETER GARDNER &
MEREEN, INC., LS #14208
(AKA CT RT 32)
16 PODURGIEL LN
UNCASVILLE, CT 06382
N/F
V571/495
MAILING ADDRESS
16 PODURGIEL LN
BETH SCIARRONI
M/B/L: 103/001/00B
PO BOX 105842
ATLANTA GA 30348-5842
N/F
V463/849
MAILING ADDRESS
2030 ROUTE 32
HOME DEPOT USA INC
M/B/L: 099/049/000
PO BOX 105842
ATLANTA GA 30348-5842
N/F
V463/849
MAILING ADDRESS
2030 ROUTE 32
HOME DEPOT USA INC
M/B/L: 099/049/000
Gregg T. Fedus P.E.
CT. License No. 21231
Gregg T. Fedus P.E.
UPLANDSUPLANDS
UPLANDS
C-2 ZONING REQUIREMENTS TABLE
SECTION REGULATION REQUIREMENTS EXISTING PROPOSED
11.4 MINIMUM LOT SIZE 40,000 SF 116,639 SF 116,639 SF
11.5 MINIMUM LOT FRONTAGE 80'480'480'
11.6.1 MINIMUM FRONT YARD 50'---BUILDING 66.8'
CANOPY 61.5'
11.6.2 MINIMUM SIDE YARD 30'---BUILDING 48.5' (S)
CANOPY 168.5' (S)
11.6.3 MINIMUM REAR YARD 30'---BUILDING 103.4'
CANOPY 116.3'
PARKING REQUIREMENTS
SECTION REGULATION MINIMUM REQ.PROPOSED
18.3.6 FREE STANDING RETAIL
5 SPACES *(4,960 SF /1000SF) = 24.8 SPACES
24.8 SPACES - 12 SPACES = 12.8 SPACES + 1 SPACE FOR TWO EMPLOYEES.
TOTAL: 13.8 ≈14
15 SPACES
18 VAN-ACCESSIBLE PARKING 1 SPACE REQUIRED 1 SPACES
168.5'
WETLAND AREA DELINEATED BY
FUSS & O'NEILL
AND CONFIRMED BY DAVID LORD,
SOIL SCIENTIST
PROPOSED
POSITIVE LIMITING
BARRIER
(TYP.)
12/05/2022 WETLAND COMMENTS 1
50
50
50 50
50
50 5050 505062'80'pppppppppppppp ppppppp p
p
p pppppp p p p p p p ppppppppppppp
p
ppppppppppp
p
p
p
pppppppp
p
p
p
pp
pppppppppppppppppppppppppppppppppppppppppppppppp
NORWICH - NEW
L
O
N
D
O
N
T
U
R
N
P
I
K
E
(
C
O
N
N
.
R
O
U
T
E
#
3
2
)OCCUM LANEN83° 33' 08"W218.01'N4° 24' 20"E
385.66'
N2
7
°
5
4
'
1
3
"
E
111
.
4
2
'
N60° 53' 04"W
36.66'
L=130.51
R=325.00
CL=129.63
CH=S72° 23' 17"E
D=23°00'27"
S83° 53' 30"E
61.78'
S4° 18' 48"W
114.05'
S60° 53' 04"E
26.17'
S6° 35' 04"W
54.13'
S62° 34' 19"E
12.75'PODURGIEL LANEOCCUM LANE76'36'pppppppp
p
p
p
p p p p p p p p p p
p p p p
p
p
p
p
p
p p p
p
pp
p p505050
50 50 50
50
50
505050
pppp
ppppppXXXpp186188178180
177.0180 178176174176174172158.0
PROPOSED
TYPE C
CATCH BASIN #1
TF = 171.35'
INV. OUT = 165.11'
PROPOSED
TYPE C
CATCH BASIN #2
TF=171.43'
INV. IN = 164.42'
INV. OUT= 164.32'
PROPOSED
69 LF 15" HDPE
S= 1.0%
PROPOSED
98 LF 15" HDPE
S= 5.0%
PROPOSED
8 LF 15" HDPE
S= 2.0%
PROPOSED
17 LF 15" HDPE
S= 1.5%
SF
SF SF
SF
SF
SF
SFSFSFSF
SF
SF
SF
SF SFSFSFSFPROPOSED F.E.U
INV. 158.00'
PROPOSED
CONTROL STRUCTURE 1
TF = 163.5'
INV. OUT = 158.00' 3"
INV. OUT = 161.00' 4"
INV. OUT = 163.50' GRATE
PROPOSED F.E.U.
INV. = 157.75'
PROPOSED
RETAINING WALL
(DETENTION BASIN)
T.O.W = 164.00'1725
0
50
PROPOSED
PLUNGE POOL
PROPOSED
GRASS SWALE
PROPOSED
RIP RAP
PROPOSED
TRASH ENCLOSURE
FF = 180.0'HYATT PLACE DRIVEPROPOSED
HYDRO-DYNAMIC
SEPARATOR 1
TF = 163.00'
INV. IN = 158.26'
INV. OUT = 158.16'176170168166164PROPOSED
TYPE C
CATCH BASIN #3
TF=163.36'
INV. IN = 159.42'
INV. OUT = 159.32'
PROPOSED
TYPE C
CATCH BASIN (4' SUMP)#4
TF=162.50'
INV. IN = 158.50'
INV. OUT = 158.40'
PROPOSED
41 LF 15" HDPE
S= 2.0%17216
4
162
180
178
180
18
2184PROPOSED
RETAINING WALL
TOW = 186.00'
166
170168166164PROPOSED
8" RETAINING WALL
TOW = 174.5'
S60° 35' 04"E
27.17'
N83° 33' 08"W
31.22'
S6° 04' 38"W
285.29'
TO BE REMOVED
PROPOSED
80'x62'
BUILDING
4,960 SF
FF = 177.0'
TO BE REPLACED IN KIND
PROPOSED
DETENTION BASIN BOTTOM
ELEVATION = 158.00'
4' WIDE CHANNEL
PROPOSED LIMITS OF DISTURBANCE
FOLLOWS THE PROPOSED SILT FENCE
Scale: 1"=1000'
Location Map
21-001048 DCJOB NO.DRAWN BY:OFSHEET NO.
0DRAWING SCALE: 1"=30'15 30 60
Prepared For:
Uncasville, Connecticut
2040 New London Turnpike
of
Grading Plan
AMER CHOUDREY
DATE REVISIONSNO.
2040 Route 32
Montville, Connecticut
Office: (860) 536-7390 Fax: (860) 536-1644
Mailing Address: 70 Essex Street Mystic, Connecticut 06355
FEDUS ENGINEERINGCIVIL ENGINEERS LLC
N:\2021\21-001048 - UNCASVILLE - 2040 ROUTE 32 - AMER CHOUDREY - GAS STATION - SITE PLAN APPROVAL\ACAD\21-001048 - UNCASVILLE - 2040 ROUTE 32 - AMER CHOUDREY - GAS STATION - SITE PLAN - 10-3-22- REV.1.DWGSubject Parcel Information
OWNER: HASSAN HUSSAIN, LLC
PARCEL ADDRESS: 2040 NEW ROUTE 32, MONTVILLE, CT
MAILING ADDRESS: 4 BOSTON POST RD, WATERFORD, CT 06385
MBL 103/1/1A
DEED: VOLUME 663 PAGE 612
AREA: 116,639 SF = 2.68 ACRES
FLOOD ZONE: ZONE X PER FIRM MAP # 09011C0351G
EFFECTIVE DATE: JULY 18, 2011
NOTES:
1.AREA OF WETLAND ON SITE IS 21,832 SF/0.50 ACRES.
2.PROPOSED AREA DISTURBED IN THE 50' REVIEW ZONE IS 21,484 SF/0.49 ACRES
UTILITY POLE W/ LIGHT
OVERHEAD WIRES
PROPERTY LINE
INDEX CONTOUR
STONEWALL
NOW OR FORMERLY
CONTOUR
FENCE LINE
WATER VALVE
TYPICAL
DRILL HOLE
POINT OF BEGINNING
Legend
PROPOSED
TEST PIT
SYMBOL
EXISTING
DESCRIPTION
p p
ADJACENT PROPERTY LINE
CATCH BASIN
SPOT ELEVATION
MEAN HIGH WATER LINE
HIGH TIDE LINE
COASTAL JURISDICTIONAL
LINE
WETLANDS BOUNDARY/FLAG
MEAN LOW WATER LINE
UTILITY POLE
DRAINAGE MANHOLE
EASEMENT LINE
ZONE LINE
EXISTING WATER LINE
EXISTING SEWER LINE
BUILDING SETBACK LINE
SEWER MANHOLE
PERCOLATION TEST
HYDRANT
WATER SHUTOFF
DRILL HOLE
EX. IP / REBAR
MONUMENT
IRON PIN TO BE SET
64
3.17 & LINDEN LANE AT #4 LINDEN LANE, STONINGTON, CONNECTICUT", PREPARED FOR
AGNES PETTINI, SCALE: 1"=40', DATE: 3/17/2003, BY: J. DEMPSEY ASSOCIATES, LLC,
JEROME J. DEMPSEY, LS #18141, STC MAP #3616
4.
DATE: AUG. 30, 1948
5.
CONNECTICUT ROUTE 1A, A.K.A. ELM STREET, STONINGTON, CONNECTICUT, SCALE:
1"=40', DATE: OCTOBER 2000, REVISED: DECEMBER 11, 2000, BY: DIETER GARDNER &
MEREEN, INC., LS #14208
(AKA CT RT 32)
16 PODURGIEL LN
UNCASVILLE, CT 06382
N/F
V571/495
MAILING ADDRESS
16 PODURGIEL LN
BETH SCIARRONI
M/B/L: 103/001/00B
PO BOX 105842
ATLANTA GA 30348-5842
N/F
V463/849
MAILING ADDRESS
2030 ROUTE 32
HOME DEPOT USA INC
M/B/L: 099/049/000
PO BOX 105842
ATLANTA GA 30348-5842
N/F
V463/849
MAILING ADDRESS
2030 ROUTE 32
HOME DEPOT USA INC
M/B/L: 099/049/000
Gregg T. Fedus P.E.
CT. License No. 21231
Gregg T. Fedus P.E.
UPLANDSUPLANDS
UPLANDS
October 3, 2022
12/05/2022 WETLAND COMMENTS 1
WETLAND AREA DELINEATED BY
FUSS & O'NEILL
AND CONFIRMED BY DAVID LORD,
SOIL SCIENTIST
PROPOSED BASIN PLANTS SEEDED WITH WOOL
- SEDGE 2" PLUG (SCIRPUS CYPERINUS) (200),
-SOFT RUSH 2" PLUG (JUNUCS EFFUSUS) (75),
-HOT SEDGE (CAREX LUPULINA)(75)
(BASIN TO BE SEEDED BETWEEN APRIL 1 AND JUNE 1)
PROPOSED 4" UNDERDRAIN
50
50
50 50
50
50 5050 505062'80'pppppppppppppp ppppppp p
p
p pppppp p p p p p p ppppppppppppp
p
ppppppppppp
p
p
p
pppppppp
p
p
p
pp
pppppppppppppppppppppppppppppppppppppppppppppppp
NORWICH - NEW
L
O
N
D
O
N
T
U
R
N
P
I
K
E
(
C
O
N
N
.
R
O
U
T
E
#
3
2
)OCCUM LANEN83° 33' 08"W218.01'N4° 24' 20"E
385.66'
N2
7
°
5
4
'
1
3
"
E
111
.
4
2
'
N60° 53' 04"W
36.66'
L=130.51
R=325.00
CL=129.63
CH=S72° 23' 17"E
D=23°00'27"
S83° 53' 30"E
61.78'
S4° 18' 48"W
114.05'
S60° 53' 04"E
26.17'
S6° 35' 04"W
54.13'
S62° 34' 19"E
12.75'PODURGIEL LANEOCCUM LANE76'36'pppppppp
p
p
p
p p p p p p p p p p
p p p p
p
p
p
p
p
p p p
p
pp
p p505050
50 50 50
50
50
505050
pppp
ppppppXXXpp186188178180
177.0180 178176174176174172158.0
SF
SF SF
SF
SF
SF
SFSFSFSF
SF
SF
SF
SF SFSFSFSFPROPOSED
HAY BALE
PROPOSED
SILT FENCE IN FRONT OF HAY BALES
(PROPOSED LIMITS OF DISTURBANCE FOLLOWS THE PROPOSED SILT FENCE)1725
0
50
HYATT PLACE DRIVE17617016816616417216
4
162
180
178
180
18
2184 166
170168166 164S60° 35' 04"E
27.17'
N83° 33' 08"W
31.22'
30' REAR YARD SETBACK
50' FRONT YARD SETB
A
C
K 50' REAR YARD SETBACK30'
S
I
D
E
Y
A
R
D
S
E
T
B
A
C
K
30' SIDE YARD SETBACKS6° 04' 38"W
285.29'
TO BE REMOVED
PROPOSED
80'x62'
BUILDING
4,960 SF
FF = 177.0'
TO BE REPLACED IN KIND
PROPOSED STOCKPILE
LOCATION
4' WIDE CHANNEL
PROPOSED
COIR WATTLE CHECK DAM
PROPOSED
COIR WATTLE CHECK DAM
PROPOSED DEWATERING BASIN
-WITH 15' X 15' DEWATERING BAG pppppppppppppppp76'50
5050SFSFScale: 1"=1000'
Location Map
21-001048 DCJOB NO.DRAWN BY:OFSHEET NO.
0DRAWING SCALE: 1"=30'15 30 60
Prepared For:
Uncasville, Connecticut
2040 New London Turnpike
of
Soil & Erosion Control Plan
AMER CHOUDREY
DATE REVISIONSNO.
2040 Route 32
Montville, Connecticut
Office: (860) 536-7390 Fax: (860) 536-1644
Mailing Address: 70 Essex Street Mystic, Connecticut 06355
FEDUS ENGINEERINGCIVIL ENGINEERS LLC
N:\2021\21-001048 - UNCASVILLE - 2040 ROUTE 32 - AMER CHOUDREY - GAS STATION - SITE PLAN APPROVAL\ACAD\21-001048 - UNCASVILLE - 2040 ROUTE 32 - AMER CHOUDREY - GAS STATION - SITE PLAN - 10-3-22- REV.1.DWGSubject Parcel Information
OWNER: HASSAN HUSSAIN, LLC
PARCEL ADDRESS: 2040 NEW ROUTE 32, MONTVILLE, CT
MAILING ADDRESS: 4 BOSTON POST RD, WATERFORD, CT 06385
MBL 103/1/1A
DEED: VOLUME 663 PAGE 612
AREA: 116,639 SF = 2.68 ACRES
FLOOD ZONE: ZONE X PER FIRM MAP # 09011C0351G
EFFECTIVE DATE: JULY 18, 2011
UTILITY POLE W/ LIGHT
OVERHEAD WIRES
PROPERTY LINE
INDEX CONTOUR
STONEWALL
NOW OR FORMERLY
CONTOUR
FENCE LINE
WATER VALVE
TYPICAL
DRILL HOLE
POINT OF BEGINNING
Legend
PROPOSED
TEST PIT
SYMBOL
EXISTING
DESCRIPTION
p p
ADJACENT PROPERTY LINE
CATCH BASIN
SPOT ELEVATION
MEAN HIGH WATER LINE
HIGH TIDE LINE
COASTAL JURISDICTIONAL
LINE
WETLANDS BOUNDARY/FLAG
MEAN LOW WATER LINE
UTILITY POLE
DRAINAGE MANHOLE
EASEMENT LINE
ZONE LINE
EXISTING WATER LINE
EXISTING SEWER LINE
BUILDING SETBACK LINE
SEWER MANHOLE
PERCOLATION TEST
HYDRANT
WATER SHUTOFF
DRILL HOLE
EX. IP / REBAR
MONUMENT
IRON PIN TO BE SET
65
3.17 & LINDEN LANE AT #4 LINDEN LANE, STONINGTON, CONNECTICUT", PREPARED FOR
AGNES PETTINI, SCALE: 1"=40', DATE: 3/17/2003, BY: J. DEMPSEY ASSOCIATES, LLC,
JEROME J. DEMPSEY, LS #18141, STC MAP #3616
4.
DATE: AUG. 30, 1948
5.
CONNECTICUT ROUTE 1A, A.K.A. ELM STREET, STONINGTON, CONNECTICUT, SCALE:
1"=40', DATE: OCTOBER 2000, REVISED: DECEMBER 11, 2000, BY: DIETER GARDNER &
MEREEN, INC., LS #14208
(AKA CT RT 32)
16 PODURGIEL LN
UNCASVILLE, CT 06382
N/F
V571/495
MAILING ADDRESS
16 PODURGIEL LN
BETH SCIARRONI
M/B/L: 103/001/00B
PO BOX 105842
ATLANTA GA 30348-5842
N/F
V463/849
MAILING ADDRESS
2030 ROUTE 32
HOME DEPOT USA INC
M/B/L: 099/049/000
PO BOX 105842
ATLANTA GA 30348-5842
N/F
V463/849
MAILING ADDRESS
2030 ROUTE 32
HOME DEPOT USA INC
M/B/L: 099/049/000
Gregg T. Fedus P.E.
TWO STAKES PER BALE
HAY BALE BARRIER DETAIL
NOT TO SCALE
FLOW DIRECTION
SF SF
NOT TO SCALE
SILT FENCE DETAIL
STEP 1
2"x4"x4' POSTS
SET 8' - 10' APART
EXISTING
GRADE
SET POSTS AND EXCAVATE A 6"x6" TRENCH.
SET POSTS DOWNSLOPE.
STEP 2
STEP 3 STEP 4
ANGLE 10° UPSLOPE
FOR STABILITY AND
SELF CLEANING
12" MIN. DEPTH
100°
WIRE FENCING
STAPLE THE WIRE MESH FENCING TO END
POSTS.
FILTER FABRIC
ATTACH FILTER FABRIC TO THE WIRE FENCING
AND EXTEND IT TO THE TRENCH.
COMPACTED
BACKFILL
BACKFILL THE TRENCH AND COMPACT THE
EXCAVATED SOIL.
PROPOSED ANTI-TRACKING PAD
N.T.S.
ANTI-TRACKING PAD
CT. License No. 21231
Gregg T. Fedus P.E.
UPLANDSUPLANDS
UPLANDS
October 3, 2022
VEGETATIVE TURF ESTABLISHMENT PROCEDURE
SCARIFY ALL AREAS TO BE TOPSOILED AND SEEDED. APPLY A MINIMUM OF 4 INCHES OF TOPSOIL ON ALL AREAS TO BE SEEDED. APPLY
GRASS SEED, LIME, FERTILIZER AND MULCH ACCORDING TO THE FOLLOWING SCHEDULE:
PERMANENT SEED MIXTURE:
CREEPING RED FESCUE 2.4 LBS. PER 1,000 SQ. FT.
REDTOP 0.2
TALL FESCUE 2.4
TOTAL 5.0
FERTILIZER:
10-10-10 APPLY AT 7.5 LBS. PER 1,000 SQ. FT.
LIMESTONE:
APPLY AT 150 LBS. PER 1,000 SQ. FT.
MULCHING:
SPREAD HAY OR STRAW OVER ALL AREAS AFTER SEEDING. USE 1 1/2 TO 2 BALES PER 1,000 SQ. FT.
TARGET FOR 100% COVERAGE. ANCHOR BY USING NETTING OR TRACKING AS NECESSARY.
SEEDING DATES:
SEEDING DATES IN CONNECTICUT ARE NORMALLY APRIL 1 THROUGH JUNE 15 AND AUGUST 15 THROUGH OCTOBER 1.
SEED GERMINATION NORMALLY CANNOT BE EXPECTED FROM NOVEMBER THROUGH FEBRUARY. IF ADEQUATE SEED
GERMINATION IS NOT POSSIBLE DUE TO TIME OF YEAR CONSTRAINTS, MULCHING SHALL BE ADEQUATELY PROVIDED
TO PROTECT THE SEED FROM WIND AND SURFACE EROSION UNTIL THE WEATHER IMPROVES AND THE SEEDING
BECOMES WELL ESTABLISHED.
CONSTRUCTION SEQUENCE
1.INSTALL ALL EROSION AND SEDIMENT CONTROL AS SHOWN ON APPROVED PLANS.
2.INSPECTION OF EROSION CONTROL INSTALLATION BY TOWN STAFF & DESIGN ENGINEER.
3.CLEAR AND GRUB SITE TO LIMITS OF DISTURBANCE.
4.ROUGH GRADE SITE.
5.CONSTRUCT OF RETAINING WALL.
6.CONSTRUCT BUILDING.
A.EXCAVATE FOUNDATION OF BUILDING
B.FORM AND POUR FOOTINGS AND WALLS
C.STRIP FORMS, WATERPROOF FOUNDATIONS AND BACKFILL
D.COMPACT LOWER LEVEL FLOOR AND POUR CONCRETE FLOORS
E.FRAME BUILDING AND ROOFING
F.INSTALL WINDOWS AND DOORS
G.INSTALL SIDING
H.ROUGH MECHANICALS
I.INSULATE
J.SHEETROCK
K.INTERIOR TRIM AND DOORS
L.FLOORING
M.FINISH MECHANICALS
N.PAINT
7.CONSTRUCT TANKS
8.CONSTRUCT CANOPY & PUMPS
9.REMOVE UTILITY POLE
10.CONSTRUCT BASIN.
11.INSTALL SEWER LINE.
12.INSTALL WATER LINE.
13.INSTALL DRAINAGE SYSTEM.
14.INSTALL UNDERGROUND ELECTRIC.
15.INSTALL SUBGRADE AND COMPACT IN PAVED AREAS.
16.INSTALL SIDEWALKS.
17.PLACE BINDER COURSE.
18.INSTALL SURFACE COURSE.
19.LOAM AND SEED DISTURBED AREAS.
20.LANDSCAPE FINISHED AREAS.
21.FINAL STABILIZATION OF SITE.
22.FINAL CLEANING OF STORMWATER SYSTEM AND GENERAL SITE CLEANUP.
23.OBTAIN FINAL INSPECTIONS.
24.REMOVE EROSION AND SEDIMENTATION CONTROL DEVICES.
SOIL EROSION AND SEDIMENT CONTROL PLAN NARRATIVE
THE SITE CONTRACTOR MUST FOLLOW ALL GUIDELINES SET FORTH IN THE MANUAL ENTITLED "2002 CONNECTICUT GUIDELINES FOR
SOIL EROSION AND SEDIMENT CONTROL" PUBLISHED BY THE CONNECTICUT COUNCIL ON SOIL AND WATER CONSERVATION IN
COOPERATION WITH THE CONNECTICUT DEPARTMENT OF ENVIRONMENTAL PROTECTION. THIS MANUAL IS ALSO KNOWN AS DEP
BULLETIN 34. IN ADDITION THE SITE CONTRACTOR MUST FOLLOW THE TOWN'S ZONING AND SUBDIVISION REGULATIONS, TOWN
EMERGENCY STANDARDS AND SPECIFICATIONS, CTDOT FORM 816 WHERE APPLICABLE.
12/05/2022 WETLAND COMMENTS 1
COIR WATTLE: CHECK DAMS IN SLOPES & WATERWAYS
CONTROL BLANKET (ECB).
MAT (TRM) OR EROSION
TURF REINFORCEMENT
WITH PERMANENT WOODY PLANTS.
COIR WATTLE AND WILLOW FASCINES STABALIZING SLOPE
WEDGE
COIR WATTLEFIGURE2A
FIGURE1
THAN POINT B
POINT A SHOULD BE HIGHER
COIR WATTLEWEDGEFIGURE2B
PROPER PLACEMENT OF COIR WATTLE IN SLOPE
WEDGE
COIR WATTLE
BA
PROPER PLACEMENT OF COIR WATTLE IN DRAINAGE WAY
WILLOW
FASCINES
NOTES:
1. ON DRAINAGE WAY LINED WITH TURF REINFORCEMENT MAT (TRM) OR EROSION CONTROL BLANKET (ECB), COIR WATTLE SHALL BE
INSTALLED AS CHECK DAMS (FIG 1).
2. INSTALLATION TO BE COMPLETED IN ACCORDANCE WITH MANUFACTURER'S SPECIFICATIONS.
3. DO NOT SCALE DRAWING.
4. THIS DRAWING IS INTENDED FOR USE BY ARCHITECTS, ENGINEERS, CONTRACTORS, CONSULTANTS AND DESIGN PROFESSIONALS
FOR PLANNING PURPOSES ONLY. THIS DRAWING MAY NOT BE USED FOR CONSTRUCTION.
5. ALL INFORMATION CONTAINED HEREIN WAS CURRENT AT THE TIME OF DEVELOPMENT BUT MUST BE REVIEWED AND APPROVED BY
THE PRODUCT MANUFACTURER TO BE CONSIDERED ACCURATE.
6. CONTRACTOR'S NOTE: FOR PRODUCT AND COMPANY INFORMATION VISIT www.CADdetails.com/info AND ENTER
REFERENCE NUMBER 084-015A.
N.T.S.
PROPOSED COFFER DAM AROUND FUEL TANKS
PROPOSED COFFER DAM
(SHEET PILLING)
PROPOSED CONCRETE PAD
PROPOSED FUEL TANKS
62'80'NORWICH - NEW
L
O
N
D
O
N
T
U
R
N
P
I
K
E
(
C
O
N
N
.
R
O
U
T
E
#
3
2
)OCCUM LANEPODURGIEL LANEOCCUM LANE76'36'
30' REAR YARD SETBACK
50' FRONT YARD SETBACK 50' REAR YARD SETBACK30' S
I
D
E
Y
A
R
D
S
E
T
B
A
C
K
30' SIDE YARD SETBACKTO BE REMOVED
PROPOSED80'x62'BUILDING4,960 SFFF = 177.0'
TO BE REPLACED IN KIND
PROPOSED
RETAINING WALL
(SEE DETAIL THIS
SHEET).
PROPOSED
15" FLARED
END UNIT
PROPOSED
MODIFIED RIPRAP
(12" THICK)
EXISTING
GRADE
PROPOSED
FEU INV=157.75'
PROPOSED
FILTER FABRIC
PROPOSED
1-1/4" CLEAN
CRUSHED STONE
(BEDDING
MATERIAL)
PROPOSED
LEVEL SPREADER
LIP ELEVATION = 156.75'
15" HDPE
2
1 1'
MIN.
BOTTOM OF
POOL ELEVATION = 155.61'
2:1 2:12:1STORM DRAIN
FLOWA A
SET ELEVATION 1'
LOWER THAN PIPE
OUTLET INVERT
17778
5101516
DRAWN
CHECKED
QA
MFG
APPROVED
toddbolzer 12/21/2020
NORWESCO, INC. SAINT BONIFACIUS, MN
TITLE
15000 GALLON UNDERGROUND TANK
SIZE
B
SCALE: 1/16
PN 41615
SHEET 1 OF 1
REV
21-001048 DCJOB NO.DRAWN BY:OFSHEET NO.
DRAWING SCALE: AS SHOWN
Prepared For:
Uncasville, Connecticut
2040 New London Turnpike
of
Detail
AMER CHOUDREY
DATE REVISIONSNO.
Office: (860) 536-7390 Fax: (860) 536-1644
Mailing Address: 70 Essex Street Mystic, Connecticut 06355
FEDUS ENGINEERINGCIVIL ENGINEERS LLC
N:\2021\21-001048 - UNCASVILLE - 2040 ROUTE 32 - AMER CHOUDREY - GAS STATION - SITE PLAN APPROVAL\ACAD\21-001048 - UNCASVILLE - 2040 ROUTE 32 - AMER CHOUDREY - GAS STATION - SITE PLAN - 10-3-22- REV.1.DWG66
3.17 & LINDEN LANE AT #4 LINDEN LANE, STONINGTON, CONNECTICUT", PREPARED FOR
AGNES PETTINI, SCALE: 1"=40', DATE: 3/17/2003, BY: J. DEMPSEY ASSOCIATES, LLC,
JEROME J. DEMPSEY, LS #18141, STC MAP #3616
4.
DATE: AUG. 30, 1948
5.
CONNECTICUT ROUTE 1A, A.K.A. ELM STREET, STONINGTON, CONNECTICUT, SCALE:
1"=40', DATE: OCTOBER 2000, REVISED: DECEMBER 11, 2000, BY: DIETER GARDNER &
MEREEN, INC., LS #14208
(AKA CT RT 32)
Gregg T. Fedus P.E.
TRUCK TURNING TEMPLATE
NOT TO SCALE
CT. License No. 21231
Gregg T. Fedus P.E.
PROPOSED FUEL TANKS
TRUCK'S TURNING
RADIUS
NOTE:
TRUCK USED WAS AASHTO WB-55 INTERSTATE
SEMI-TRAILER (LENGTH = 65.8')
October 3, 2022
3 5/8"3 5/8"15 15/16"15 15/16"11 1/2"TYPE "C" CATCH BASIN DETAIL
TYPE "C" CATCH BASIN DETAIL
TYPE "C" CATCH BASIN.DWG
NOT TO SCALE
12"
7 5/8"
8"
5'-4"
4'-0"
SECTION A-A
12"
7 5/8"
2'-8 3/4"2'-0" MIN.SECTION B-B6"6"8"8"3'-0"
4'-4"2'-0"2'-0"VARIABLEVARIABLE12"2'-1 3/8"
2 13/16"
7 13/16"
8"
8"
1. REMOVE HAYBALE BARRIER AFTER PERMANENT
GROUNDCOVER HAS BEEN ESTABLLISHED.
2. CLEAN SUMPS AFTER REMOVAL OF BARRIER.
3. CATCH BASINS SHALL BE PRECAST UNITS.
2'-2 3/8"
A
2'-2 3/8"
5'-4"
B
PLAN
B
10 3/16"
A
4'-4"10 3/16"10"
NOTES:
10"2"
3 13/16"
2"2"
1"2 13/16"2"
2:1
M
I
N
.
VARIES
VARIES 2:1 MI
N.
PROPOSED GRADE
DENSE GRASS
GROWTH
GRASS DRAINAGE SWALE
NOT TO SCALE
PLUNGE POOL DETAIL
(LOOKING NORTH)
SCALE: 1"=5'
DUMPSTER ENCLOSURE DETAIL
NOT TO SCALE
6' HIGH WOODEN
STOCKADE FENCE
SUPPORT POST SECURED
TO CONCRETE PAD (TYPICAL)
CONCRETE PAD
6' WOODEN STOCKADE GATE
(TYPICAL)8-0"20'-0"
DUMPSTER
Specifications Outlet
1. Must be independently tested to the 2013 NJDEP Laboratory
Protocol and 2013 ETV Canada protocol (ISO 14024:2016).
Separator must be sized based on this data.
2. Any testing performed by the manufacturer is unacceptableto demonstrate an alternate equal.
3. Field Testing is unreliable, site and storm specific, and subjectto compounding equipment and analytical errors and thereforeis unacceptable as verification of an alternate equal. TARP
verfication as per NJDEP is testing consistent with the 2013
NJDEP laboratory protocol.
4. The separator must be designed based on the following
criteria:
Flow Criteria
Water Quality FLow Rate cfs (L/s)
Peak Design Flow Rate cfs
TSS Removal Criteria
Annual TSS Removal (%)
NJDEP/ETV Canada TSS
OK110 Sand
City of Toronto
Other
Notes:
1. Headloss K factor of 1.04 for hydraulic gradeline calculations
2. Sump depths shown are typical. Additional depth can be added as required
3. Multiple inlet pipes allowed
4. Drops allowed
5. Inlet invert elevations should be the same or higher than the outlet invert elevation.Inlet can be up to 12" (300 mm) lower than outlet if pretreatment area is omitted but 12"
(300 mm) must be added to sump depth to maintain overall treatment volume.
6. Solid Cover shown. HydroStorm can be desiged with an inlet grate if required.
7. Oil capacities given are spill capacities.
8. Sediment depths are maximum holding capacities and not recommended capacities forregular maintenance.
9. Capacities are rounded down to nearest 5 gal or ft3 (1L or 0.1 m3 for metric units)
10. Base Extensions not provided on standard units larger than the HS 6. Extensions can be
provided if required due to groundwater/buoyancy concerns at the request of the
engineer of record.
11. HS4 to HS6 models require one frame and cover. HS7 to HS12 models require two
covers REVISION DATE: 12/5/2022
D
H
Plan
Inlet
HydroStorm Components
A. Perforated Scour Plate
B. Outlet DiskC. Pretreatment DiskD. Pretreatment GrateE. Inner Chamber
F. By-Pass Weirs
G. Frame and Cover (1-2)H. Inlet and Outlet PipesI. Structure Diameter
J. Base Extension (HS4 - HS6)K. Sump Depth
A
Profile
HydroStorm by Hydroworks, LLCUS Patent No. 10,710,907
www.hydroworks.com
888-290-7900
Model
HS 3
HS 4
HS 5
HS 6
HS 7
HS 8
HS 10
HS 12
Diameter ft (m)(9)
3 (0.9)
4 (1.2)
5 (1.5)
6 (1.8)
Sump Depth ft(m)(11)
HydroStorm Dimensions / Capacities
(8)Inner ChamberDiam. ft (m) (5)Max. Pipe in(mm)Oil Spill Volumegal (L)Sediment Volumeft3 (m3)Total Volume gal (L)
3 (0.9) 1.5 (0.45) 18 (450) 40 (155) 10 (0.35) 155 (600)
4 (1.2)
48"
J
G
E Inlet
B K
F
H I
HF
As Required
3
Inlet Elev.
Outlet Elev.
Inlet D 24"Outlet
C
H
F
30"
2 (0.6) 24 (600) 95 (375) 30 (0.85) 375 (1420)
5 (1.5) 2.5 (0.8) 30 (750) 165 (635) 60 (1.8) 730 (2780)
6 (1.8)
7 (2.1)
3 (0.9) 36 (900) 270 (1030) 110 (3.2) 1265 (4800)
7 (2.1) 6.5 (2.0) 3.5 (1.0) 42 (1050) 410 (1560) 160 (4.6) 1870 (7080)
8 (2.4)
10 (3.0) 9 (2.7)
4 (1.2) 48 (1200) 615 (2330) 220 (6.2) 2630 (9960)
5 (1.5) 60 (1500) 1130 (4285) 465 (13.1) 5285 (20015)
12 (3.6) 11 (3.3) 6 (1.8) 72 (1800) 1875 (7100) 835 (23.7) 9305 (35225)
Hydroworks HydroStorm
PROJECT:
LOCATION:
NA
4.57
85
NA
NA
NA
NA
2040 ROUTE 32, UNCASVILLE
2040 ROUTE 32
·HYDROWORKS HYDROSTORM
-THE HYDRODOME SEPARATOR SHOULD BE INSPECTED EVERY FOUR WEEKS
AND AFTER EVERY LARGE STORM (OVER 0.5” (12.5 MM) OF RAIN) DURING THE
CONSTRUCTION PERIOD.
-INSPECT AT LEAST TWICE A YEAR.
-THE MAINTENANCE FOR SEDIMENT ACCUMULATION IS REQUIRED IF THE
DEPTH OF SEDIMENT IS 1FT OR GREATER IN SEPARATORS WITH STANDARD
WATER (SUMP) DEPTHS.
-LOOK FOR OBSTRUCTIONS IN INLETS.
-CLEAN ANY FLOATING DEBRIS IN THE SEPARATOR DURING THE INSPECTION.
-LOOK FOR ANY CRACKING OR DEFICIENCIES IN THE CONCRETE.
·DETENTION BASIN
-MAKE SURE BASIN SURFACE IS CLEAR OF DEBRIS.
-MOWING PERFORMED WHEN NECESSARY.
-CHECK IF THERE IS EVIDENCE OF VEGETATION EROSION AND THAT
VEGETATION COVERAGE IS ADEQUATE. IF NOT REPLACE VEGETATION.
-MAKE SURE THAT DRAWDOWN TIMES DO NOT EXCEED 36 TO 48 HOURS.
-FIRST FEW MONTHS AFTER CONSTRUCTION CHECK FOR EROSION AFTER
MAJOR STORMS.
-MAKE SURE OUTLET IS CLEAR OF DEBRIS.
-MAKE SURE OVERFLOW SPILLWAY/EMERGENCY SPILLWAY IS CLEAR OF
DEBRIS.
-IF FILTER FABRIC IS EXPOSED/RIPPED REPLACE.
-INSPECT AT LEAST TWICE A YEAR.
-BASIN MOWED AND CLIPPINGS REMOVED.
· CATCH BASIN
-CLEAN AT LEAST ANNUALLY, AFTER THE SNOW AND ICE REMOVAL SEASON IS
OVER AND AS SOON AS POSSIBLE BEFORE SPRING RAINFALL EVENTS..
-IF A CATCH BASIN SIGNIFICANTLY EXCEEDS THIS ONE-HALF DEPTH
STANDARD DURING THE ANNUAL INSPECTION, THEN IT SHOULD BE CLEANED
MORE FREQUENTLY.
#4 EACH WAY 1' O.C.
RETAINING WALL
#5 HORIZ. 1' O.C.
#6 VERT. 1' O.C.
#5 EACH WAY
1' O.C.
FINISHED GRADE
158.0'
BACKFILL W/ FREE
DRAINING MATERIAL
NOTE:
PRIOR TO CONSTRUCTION,
RETAINING WALL DESIGN
SHALL BE REVIEWED BY
STRUCTURAL ENGINEER.
FINISHED GRADE
NOT TO SCALE
TOP OF WALL
164.00'
SOIL EROSION AND SEDIMENT CONTROLS
ALL ADJACENT PROPERTIES AND RECEIVING WATERCOURSES AND / OR WETLAND AREAS SHALL BE ADEQUATELY PROTECTED FROM SOIL
EROSION AND SEDIMENTATION BOTH DURING AND AFTER CONSTRUCTION.
ADDITIONAL EROSION AND SEDIMENT CONTROLS MAY BE REQUIRED BY THE TOWN AND SHALL BE INSTALLED AND MAINTAINED BY THE
CONTRACTOR. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE PROPER INSTALLATION AND MAINTENANCE OF ALL EROSION AND
SEDIMENT CONTROLS BEFORE, DURING AND AFTER CONSTRUCTION. THE CONTRACTOR IS ALSO RESPONSIBLE FOR THE PROPER
REMOVAL AND DISPOSAL OF ALL EROSION AND SEDIMENT CONTROLS ONCE THE SITE IS COMPLETELY STABILIZED.
ALL ACCUMULATED SEDIMENTS AT ALL EROSION AND SEDIMENT CONTROLS SHALL BE PERIODICALLY REMOVED AND SPREAD IN AREAS
THAT ARE NOT SUBJECT TO EROSION.
ALL EROSION AND SEDIMENT CONTROLS SHALL BE INSPECTED WEEKLY AND AFTER ALL RAINFALL EVENTS. E & S CONTROLS SHALL BE
REPAIRED OR REPLACED AS NECESSARY WITHIN 24 HOURS THROUGHOUT THE CONSTRUCTION DURATION.
THE PERMITTEE SHALL EMPLOY BEST MANAGEMENT PRACTICES, CONSISTENT WITH THE TERMS AND CONDITIONS OF THE INLAND
WETLANDS PERMIT, TO CONTROL STORMWATER DISCHARGES AND TO PREVENT EROSION AND SEDIMENTATION AND TO OTHERWISE
PREVENT POLLUTION OF WETLANDS OR WATERCOURSES. THE PERMITTEE SHALL IMMEDIATELY INFORM THE TOWN WETLANDS OFFICER
OF ANY PROBLEMS INVOLVING WETLANDS OR WATERCOURSES THAT HAVE DEVELOPED IN THE COURSE OF, OR THAT ARE CAUSED BY,
THE AUTHORIZED WORK.
THE RESPONSIBLE CONTACT PERSON FOR THE INSTALLATION AND MAINTENANCE OR EROSION AND SEDIMENTATION CONTROLS ON
THIS PROJECT WILL BE THE SITE CONTRACTOR. THE CONTACT INFORMATION FOR THE CONTRACTOR WILL BE MADE AVAILABLE TO THE
TOWN AS SOON AS IT IS AVAILABLE.
ALL CONSTRUCTION SITE RUNOFF SHALL BE ROUTED INTERNALLY TO STORMWATER MANAGMENT AREA. SEDIMENT SHALL BE
MONITORED, MAINTAINED AND REMOVED AFTER EACH STORM EVENT IN EXCESS OF 1" OF RAINFALL OR WHEN THE CAPACITY EXCEEDS
50% OF THE STORAGE VOLUME. EROSION AND SEDIMENT CONTROLS SHALL BE INSPECTED WEEKLY AND AFTER ALL RAINFALL EVENTS.
E & S CONTROLS SHALL BE REPAIRED OR REPLACED AS NECESSARY WITHIN 24 HOURS THROUGHOUT THE CONSTRUCTION DURATION.
TYPICAL STOCKPILE DETAIL
SILT FENCE BARRIER
AROUND STOCKPILE
STOCKPILE
EXISTING GRADE
NOTE: ANY STOCKPILE THAT WILL REMAIN UNDISTURBED
FOR A PERIOD LONGER THAN 30 DAYS SHALL BE SEEDED
WITH A TEMPORARY GRASS SEED MIXTURE TO PREVENT
EXCESSIVE EROSION AND SEDIMENTATION.
SIZING WAS DONE USINGHYDROWORKS SOFTWARE.
12/05/2022 WETLAND COMMENTS 1