HomeMy WebLinkAbout22SITE2 Phasing Plan Sheet C 2.2 - Rev 011323C-2.2
Job Number:
Job Start Date:
Checked By:
Sheet Title:
Drawn By:
Sheet Number:
Scale:
1/4/22
FE22-1700
THIS DRAWING IS THE PROPERTY OF
THE ENGINEER. IT HAS BEEN
SPECIFICALLY PREPARED FOR THE
OWNER FOR THIS PROJECT AT THIS SITE
AND IS NOT TO BE USED FOR ANY
OTHER PURPOSE, LOCATION OR OWNER
WITHOUT WRITTEN CONSENT OF THE
ENGINEER.PREPARED FOR245 NORWICH-NEW LONDON ROAD (RT 32)22 UNIT CONDOMINIUM DEVELOPMENTD.R.R.J.E.Q.WESTERN GROUP, LLCSubmission 01/25/22
525 JOHN STREET BRIDGEPORT, CT. 06604
Office (203) 333-9465
fax (203) 336-1769
e-mail Info@FullerSurveyors
MONTVILLE, CONNECTICUTAPPROVED BY THE MONTVILLE PLANNING AND ZONING COMMISSION
CHAIRMAN DATE WILTON'S WAY1/13/2023 1:45 PMStaff Comments 03/08/22
APPROVED BY THE MONTVILLE INLAND WETLAND COMMISSION
CHAIRMAN DATE
EXPIRATION DATE
SEC PLAN APPROVAL DATE
Building Mods/Cond. of Approval08/10/22
Final Cond. of Approval 10/21/22
Phasing 12/04/22
Conditions of Approval 01/06/23
Conditions of Approval Revised01/13/23
PHASE 1 PHASE 2
PHASE 3 PHASE 4NORWICH-NEW LONDONROAD (CT ROUTE 32)22 21 20 19 18 17 16 15 14 13 12 11
6 7 8 9 1012345
FUTURE PHASE
AREA
2
PHASE 1 AREA
2 TEMPORARY STANDARD
PARKING SPACES
1 SPACE 1 SPACE 1 SPACE 1 SPACE 1 SPACE 2 SPACES
TEMPORARY
PARKING SPACES
EXTG BUILDINGS
TO BE REMOVED
CONSTRUCT ALL SITE
IMPROVEMENTS WITHIN
STATE ROW
CONSTRUCT ALL SITE
IMPROVEMENTS WITHIN
STATE ROW
1.CONSTRUCT PRIMARY
DRAINAGE SYSTEM
2.INSTALL TEMPORARY
DRAINAGE CONVEYANCE
SYSTEM TO LEVEL
SPREADER
3.CONSTRUCT UNITS 17-22
4.CONSTRUCTION
SUBSURFACE UTILITIES
5.CONSTRUCT PARKING
AREA WITH 15 TOTAL
PARKING SPACES
6.INSTALL TEMPORARY
STOCKADE FENCE
AROUND PERIMETER OF
PHASE 1 AREA
PHASE 1
CONSTRUCT
LEVEL SPREADER
TEMPORARY
STOCKADE FENCE
CONSTRUCT
COMPLETE
STORMWATER
SYSTEM
CONSTRUCT
CONCRETE
WALLS
INSTALL BIT. CONC.
PAVEMENTS UNDER
FUTURE PHASES
SCREENED
REFUSE AREA
w/DOUBLE GATES
NORWICH-NEW LONDONROAD (CT ROUTE 32)22 21 20 19 18 17 16 15 14 13 12 11
6 7 8 9 1012345
FUTURE PHASE
AREA
PHASE 2 AREA
1 SPACE 1 SPACE 1 SPACE 1 SPACE 1 SPACE 2 SPACES
2 SPACES
EXTEND PARKING
LOT
1.CONSTRUCT UNITS 11-16
2.EXTEND SUBSURFACE UTILITIES
3.CONSTRUCT PARKING AREA WITH 15
SPACES
4.INSTALL TEMPORARY STOCKADE FENCE
AROUND COMPLETED PHASE 2 WORK
TEMPORARY
ACCESS WAY
UTILIZE EXTG. CURB
CUT FOR PHASES 2,
3, AND 4
PHASE 1 PHASE 2
15 PARKING
SPACES PROVIDED
IN PHASE 1
TEMPORARY
STOCKADE FENCE
SCREENED
REFUSE AREA
w/DOUBLE GATES
PHASE 2 AREA
NORWICH-NEW LONDONROAD (CT ROUTE 32)22 21 20 19 18 17 16 15 14 13 12 11
6 7 8 9 1012345
PHASE 4 AREA
2 SPACES
1.CONSTRUCT UNITS 1-5
2.CONNECT SUBSURFACE UTILITIES.
3.CONSTRUCT PARKING FINAL AREAS.
PHASE 1 PHASE 2
PHASE 3
2 SPACES2 SPACES2 SPACES2 SPACES
NORWICH-NEW LONDONROAD (CT ROUTE 32)22 21 20 19 18 17 16 15 14 13 12 11
6 7 8 9 1012345
FUTURE PHASE
AREA
2
PHASE 3 AREA
2 SPACES 1 SPACE 1 SPACE 1 SPACE 1 SPACE
EXTEND PARKING
LOT
1.CONSTRUCT UNITS 6-10
2.CONNECT SUBSURFACE UTILITIES.
3.CONSTRUCT PARKING AREA WITH
15 TOTAL PARKING SPACES.TEMPORARY
ACCESS WAY
UTILIZE EXTG. CURB
CUT FOR PHASES 2,
3, AND 4
PHASE 1 PHASE 2
5 TEMPORARY SPACES
PHASE 3
CONSTRUCT 5 ADDITIONAL
TEMPORARY PARKING
SPACES
PHASE 3 AREA
REFUSE AREA
CONSTRUCTED
UNDER PHASE 2