Loading...
HomeMy WebLinkAbout22SITE2 Phasing Plan Sheet C 2.2 - Rev 011323C-2.2 Job Number: Job Start Date: Checked By: Sheet Title: Drawn By: Sheet Number: Scale: 1/4/22 FE22-1700 THIS DRAWING IS THE PROPERTY OF THE ENGINEER. IT HAS BEEN SPECIFICALLY PREPARED FOR THE OWNER FOR THIS PROJECT AT THIS SITE AND IS NOT TO BE USED FOR ANY OTHER PURPOSE, LOCATION OR OWNER WITHOUT WRITTEN CONSENT OF THE ENGINEER.PREPARED FOR245 NORWICH-NEW LONDON ROAD (RT 32)22 UNIT CONDOMINIUM DEVELOPMENTD.R.R.J.E.Q.WESTERN GROUP, LLCSubmission 01/25/22 525 JOHN STREET BRIDGEPORT, CT. 06604 Office (203) 333-9465 fax (203) 336-1769 e-mail Info@FullerSurveyors MONTVILLE, CONNECTICUTAPPROVED BY THE MONTVILLE PLANNING AND ZONING COMMISSION CHAIRMAN DATE WILTON'S WAY1/13/2023 1:45 PMStaff Comments 03/08/22 APPROVED BY THE MONTVILLE INLAND WETLAND COMMISSION CHAIRMAN DATE EXPIRATION DATE SEC PLAN APPROVAL DATE Building Mods/Cond. of Approval08/10/22 Final Cond. of Approval 10/21/22 Phasing 12/04/22 Conditions of Approval 01/06/23 Conditions of Approval Revised01/13/23 PHASE 1 PHASE 2 PHASE 3 PHASE 4NORWICH-NEW LONDONROAD (CT ROUTE 32)22 21 20 19 18 17 16 15 14 13 12 11 6 7 8 9 1012345 FUTURE PHASE AREA 2 PHASE 1 AREA 2 TEMPORARY STANDARD PARKING SPACES 1 SPACE 1 SPACE 1 SPACE 1 SPACE 1 SPACE 2 SPACES TEMPORARY PARKING SPACES EXTG BUILDINGS TO BE REMOVED CONSTRUCT ALL SITE IMPROVEMENTS WITHIN STATE ROW CONSTRUCT ALL SITE IMPROVEMENTS WITHIN STATE ROW 1.CONSTRUCT PRIMARY DRAINAGE SYSTEM 2.INSTALL TEMPORARY DRAINAGE CONVEYANCE SYSTEM TO LEVEL SPREADER 3.CONSTRUCT UNITS 17-22 4.CONSTRUCTION SUBSURFACE UTILITIES 5.CONSTRUCT PARKING AREA WITH 15 TOTAL PARKING SPACES 6.INSTALL TEMPORARY STOCKADE FENCE AROUND PERIMETER OF PHASE 1 AREA PHASE 1 CONSTRUCT LEVEL SPREADER TEMPORARY STOCKADE FENCE CONSTRUCT COMPLETE STORMWATER SYSTEM CONSTRUCT CONCRETE WALLS INSTALL BIT. CONC. PAVEMENTS UNDER FUTURE PHASES SCREENED REFUSE AREA w/DOUBLE GATES NORWICH-NEW LONDONROAD (CT ROUTE 32)22 21 20 19 18 17 16 15 14 13 12 11 6 7 8 9 1012345 FUTURE PHASE AREA PHASE 2 AREA 1 SPACE 1 SPACE 1 SPACE 1 SPACE 1 SPACE 2 SPACES 2 SPACES EXTEND PARKING LOT 1.CONSTRUCT UNITS 11-16 2.EXTEND SUBSURFACE UTILITIES 3.CONSTRUCT PARKING AREA WITH 15 SPACES 4.INSTALL TEMPORARY STOCKADE FENCE AROUND COMPLETED PHASE 2 WORK TEMPORARY ACCESS WAY UTILIZE EXTG. CURB CUT FOR PHASES 2, 3, AND 4 PHASE 1 PHASE 2 15 PARKING SPACES PROVIDED IN PHASE 1 TEMPORARY STOCKADE FENCE SCREENED REFUSE AREA w/DOUBLE GATES PHASE 2 AREA NORWICH-NEW LONDONROAD (CT ROUTE 32)22 21 20 19 18 17 16 15 14 13 12 11 6 7 8 9 1012345 PHASE 4 AREA 2 SPACES 1.CONSTRUCT UNITS 1-5 2.CONNECT SUBSURFACE UTILITIES. 3.CONSTRUCT PARKING FINAL AREAS. PHASE 1 PHASE 2 PHASE 3 2 SPACES2 SPACES2 SPACES2 SPACES NORWICH-NEW LONDONROAD (CT ROUTE 32)22 21 20 19 18 17 16 15 14 13 12 11 6 7 8 9 1012345 FUTURE PHASE AREA 2 PHASE 3 AREA 2 SPACES 1 SPACE 1 SPACE 1 SPACE 1 SPACE EXTEND PARKING LOT 1.CONSTRUCT UNITS 6-10 2.CONNECT SUBSURFACE UTILITIES. 3.CONSTRUCT PARKING AREA WITH 15 TOTAL PARKING SPACES.TEMPORARY ACCESS WAY UTILIZE EXTG. CURB CUT FOR PHASES 2, 3, AND 4 PHASE 1 PHASE 2 5 TEMPORARY SPACES PHASE 3 CONSTRUCT 5 ADDITIONAL TEMPORARY PARKING SPACES PHASE 3 AREA REFUSE AREA CONSTRUCTED UNDER PHASE 2