HomeMy WebLinkAboutInspection ReportsTown of Montville Inspection Report
H:\IWC\Applications\Past Years\2018\18 Sacatello Industrial DriveM5L27‐10\IWC Restoration Reports\InspRep111219.docx
Date: 11/12/19 Inspection Type: Wetlands Restoration
Inspection
Location: 18 Sachatello Drive Map/Lot: M5 L27-10
Parties
Present
Choose
an
item.
Choose
an
item.
Choose
an
item.
Choose
an
item.
Choose
an
item.
Other: Bob Russo – CLA & Paul Stone‐
Lombardi Gravel
Click here to enter text.
Click here to enter text.
Click here to enter text.
Yes No
CZC Approved ☐ ☐
N/A
Comments/Observations
Resolution Date: 11/12/2019
Met Bob Russo from CLA Engineering and Paul Stone with Lombardi out at the site today. The Wetland
Restoration Project has been completed per the approved plan.
Mr. Russo will provide a report for the Commission to review at their November 21, 2019 meeting.
It will be his recommendation and my recommendation that the restoration has been completed, I will
then recommend that the Cease and Restore Order be lifted with conditions.
Monitoring will continue to ensure that maintenance be ongoing and done as needed.
Town of Montville Inspection Report
H:\IWC\Applications\Past Years\2018\18 Sacatello Industrial DriveM5L27‐10\IWC Restoration Reports\InspRep111219.docx
Northeast sediment basin with
plantings of red maple, high bush
blueberry, winterberry holly and
arrowood viburnum.
Town of Montville Inspection Report
H:\IWC\Applications\Past Years\2018\18 Sacatello Industrial DriveM5L27‐10\IWC Restoration Reports\InspRep111219.docx
Northwest sediment basin with
plantings of red maple, high bush
blueberry, winterberry holly and
arrowood viburnum.
Town of Montville Inspection Report
H:\IWC\Applications\Past Years\2018\18 Sacatello Industrial DriveM5L27‐10\IWC Restoration Reports\InspRep102419.docx
Date: 10/24/19 Inspection Type: Wetlands Restoration
Inspection
Location: 18 Sachatello Drive Map/Lot: M5 L27-10
Parties
Present
Choose
an
item.
Choose
an
item.
Choose
an
item.
Choose
an
item.
Choose
an
item.
Other: Bob Russo – CLA & Paul Stone‐
Lombardi Gravel
Click here to enter text.
Click here to enter text.
Click here to enter text.
Yes No
CZC Approved ☐ ☒
N/A
Comments/Observations
Resolution Date: 10/24/2019
Met Bob Russo from CLA Engineering and Paul Stone out at the site today. The Wetland Restoration
work on the property is ongoing, more planting will be done in the northeast basin and repairs to other
areas have almost been done.
An inspection will be planned in a week or so to verify planting of appropriate numbers of red maple,
highbush blueberry, winterberry holly and arrowood viburnum has been done per plan approved.
Mr. Russo plans to have the first annual report to the Inland Wetland Commission, for their November
21, 2019 meeting.
Monitoring will be ongoing, restoration work per plan is nearing completion.
Town of Montville Inspection Report
H:\IWC\Applications\Past Years\2018\18 Sacatello Industrial DriveM5L27‐10\IWC Restoration Reports\InspRep102419.docx
Sediment was cleaned from in front of
orange fencing and from within the
basin below.
Riprap stone was replaced in the area
that had washed out.
Town of Montville Inspection Report
H:\IWC\Applications\Past Years\2018\18 Sacatello Industrial DriveM5L27‐10\IWC Restoration Reports\InspRep101819.docx
Date: 10/18/19 Inspection Type: Wetlands Restoration
Inspection
Location: 18 Sachatello Drive Map/Lot: M5 L27-10
Parties
Present
Choose
an
item.
Choose
an
item.
Choose
an
item.
Choose
an
item.
Choose
an
item.
Other: Bob Russo ‐ CLA
Click here to enter text.
Click here to enter text.
Click here to enter text.
Yes No
CZC Approved ☐ ☒
N/A
Comments/Observations
Resolution Date: 10/18/2019
Met Bob Russo from CLA Engineering out at the site today. The Wetland Restoration work on the
property is wrapping up as per the approved plan. All areas are seeded and grass mix has taken and is
coming in well in all areas. Check dams sediment basins and wood chip/stone berms are in place.
Highbush blueberry, Red Maple and Holly have been planted as per the plan.
There are areas that will need to be addressed due to a very heavy rain event that occurred on
Wednesday, 10/16/19, over five inches of rain fell in a short period of time. Areas will be re‐enforced
with more stone and repaired as needed. A re‐inspection with Mr. Russo and Paul Stone will be planned
for October 24, 2019.
Mr. Russo plans to have the first annual report to the Inland Wetland Commission, for their November
21, 2019 meeting.
Monitoring will be ongoing, restoration work per plan is nearing completion.
Town of Montville Inspection Report
H:\IWC\Applications\Past Years\2018\18 Sacatello Industrial DriveM5L27‐10\IWC Restoration Reports\InspRep101819.docx
Check dam and berm have been
installed to the right of the entrance to
the rear stock pile area. Photo below
shows the same area different view.
Heading to the rear stock pile area, the
equipment on the right side of the road
near the wetland area has been
removed.
Town of Montville Inspection Report
H:\IWC\Applications\Past Years\2018\18 Sacatello Industrial DriveM5L27‐10\IWC Restoration Reports\InspRep101819.docx
Sediment basin held up well
considering the more than average rain
fall that took place on 10‐16‐19.
Areas that were weakened by the rain
event will be repaired and stone will be
added in between the concrete blocks
to reinforce that area to avoid future
breaches.
Town of Montville Inspection Report
H:\IWC\Applications\Past Years\2018\18 Sacatello Industrial DriveM5L27‐10\IWC Restoration Reports\InspRep101819.docx
Red Maple, Winterberry Holly and High
Bush Blueberry have been planted in
the northwest sediment basin area.
Town of Montville Inspection Report
H:\IWC\Applications\Past Years\2018\18 Sacatello Industrial DriveM5L27‐10\IWC Restoration Reports\InspRep101819.docx
View of the northwest sediment basin,
check dam and vegetated swale.
Same as above.
Existing heavily vegetated swale along
the eastern portion of the stock pile
area.
Town of Montville Inspection Report
H:\IWC\Applications\Past Years\2018\18 Sacatello Industrial DriveM5L27‐10\IWC Restoration Reports\InspRep101819.docx
Red Maple has been planted in the
northeast sediment basin area, will
confirm if Winterberry Holly, High Bush
Blueberry and Arrowood Viburnum
have been planted also as per plan.
Same as above facing toward the south.
Areas where excess sediment could
form rills in the vegetated swale in the
northeast sediment basin area. This will
be addressed by adding more rip rap
stone in between the concrete blocks.
Town of Montville Inspection Report
H:\IWC\Applications\Past Years\2018\18 Sacatello Industrial DriveM5L27‐10\IWC Restoration Reports\InspRep101819.docx
The spreader held up well from
Wednesday’s rain event.
View of the access road facing north, all
the equipment has been removed from
the western edge of the road.
Spreader area that was breached by the
heavy rainfall near the rock crusher,
this area will be repaired and re‐
enforced.
Town of Montville Inspection Report
H:\IWC\Applications\Past Years\2018\18 Sacatello Industrial DriveM5L27‐10\IWC Restoration Reports\InspRep101819.docx
Same as above, showing the sediment
that entered basin from the breach.
Cat tails in the sediment basin and
vegetated swale in place behind that.
Town of Montville Inspection Report
H:\IWC\Applications\Past Years\2018\18 Sacatello Industrial DriveM5L27‐10\IWC Restoration Reports\InspRep092719.docx
Date: 9/27/2019 Inspection Type: Wetlands Restoration
Inspection
Location: 18 Sachatello Drive Map/Lot: M5 L27-10
Parties
Present
Choose
an
item.
Choose
an
item.
Choose
an
item.
Choose
an
item.
Choose
an
item.
Other: Bob Russo ‐ CLA
Click here to enter text.
Click here to enter text.
Click here to enter text.
Yes No
CZC Approved ☐ ☒
N/A
Comments/Observations
Resolution Date: 9/27/2019
I meet Bob Russo from CLA Engineering out at the site today. The Wetland Restoration work on the
property is going as per the approved plan. All areas are seeded and grass mix has taken and is coming
in well in all areas. Check dams and wood chip berms are in place. Highbush blueberry and other
plantings will possibly go in now while weather permits and will finish up in the Spring of 2020 if they
can’t get them all in.
Will go back out again in October 2019 to view more progress.
Mr. Russo should have the first annual report for the Inland Wetlands Commission, for their November
21, 2019 meeting.
Monitoring will be ongoing, restoration work per plan is nearing completion.
Town of Montville Inspection Report
H:\IWC\Applications\Past Years\2018\18 Sacatello Industrial DriveM5L27‐10\IWC Restoration Reports\InspRep092719.docx
Permanent Sediment Basin in northeast
corner is now in, seed mix took well,
and blocks are in place at perimeter.
Same as above.
Same area as above showing the rip rap
spreader.
Town of Montville Inspection Report
H:\IWC\Applications\Past Years\2018\18 Sacatello Industrial DriveM5L27‐10\IWC Restoration Reports\InspRep092719.docx
Same as above.
Wood chip and rip rap berm and the
rip rap spreader is complete in the
northwest corner.
Closer view of wood chip and rip rap
check dam.
Town of Montville Inspection Report
H:\IWC\Applications\Past Years\2018\18 Sacatello Industrial DriveM5L27‐10\IWC Restoration Reports\InspRep092719.docx
Looking towards sediment basin on the
western portion of the site. Blocks are
in place along the perimeter.
Closer view of rip rap and wood chip
check dam in place towards southwest
portion of site.
Looking south towards sediment basin
on west side, you can see that the
blocks are in place along the perimeter
also.
Town of Montville Inspection Report
H:\IWC\Applications\Past Years\2018\18 Sacatello Industrial DriveM5L27‐10\IWC Restoration Reports\InspRep092719.docx
The area above has been seeded.
Grass has already started to come in on
the western portion of the site being
restored.
Smaller basin and check dam in.
Town of Montville Inspection Report
H:\IWC\Applications\Past Years\2018\18 Sacatello Industrial DriveM5L27‐10\IWC Restoration Reports\InspRep092719.docx
Blocks and seeded area extend to
southern portion of the site.
Area near the entrance to the rear
stock pile area which is in the buffer
area will be cleaned out and a check
dam will be installed.
The sediment basin near the crusher in
the distance will be cleaned out and a
stone and wood chip berm will go in.
Town of Montville Inspection Report
H:\IWC\Applications\Past Years\2018\18 Sacatello Industrial DriveM5L27‐10\IWC Restoration Reports\InspRep091319.docx
Date: 9/13/2019 Inspection Type: Wetlands Restoration
Inspection
Location: 18 Sachatello Drive Map/Lot: M5 L27-10
Parties
Present
Choose
an
item.
Choose
an
item.
Choose
an
item.
Choose
an
item.
Choose
an
item.
Other: Bob Russo ‐ CLA
Click here to enter text.
Click here to enter text.
Click here to enter text.
Yes No
CZC Approved ☐ ☒
N/A
Comments/Observations
Resolution Date: 9/13/2019
I meet Bob Russo from CLA Engineering out at the site today. The Wetland Restoration work on the
property is going as per the approved plan. Mr. Russo should have the first annual report for the Inland
Wetlands Commission, for their November 21, 2019 meeting.
Monitoring will be ongoing until the restoration project is completed.
Town of Montville Inspection Report
H:\IWC\Applications\Past Years\2018\18 Sacatello Industrial DriveM5L27‐10\IWC Restoration Reports\InspRep091319.docx
Permanent Sediment Basin in northeast
corner is now in. The boulders will need
to be put in place along the front
portion that abuts the main stockpile
area. The Red Maple, Highbush
Blueberry and other plantings will need
to go in as weather permits.
Grading has started on the northwest
portion of the site.
Same as above.
Town of Montville Inspection Report
H:\IWC\Applications\Past Years\2018\18 Sacatello Industrial DriveM5L27‐10\IWC Restoration Reports\InspRep091319.docx
Same as above.
Same as above.
Grading continues toward the
southwest corner.
Town of Montville Inspection Report
H:\IWC\Applications\Past Years\2018\18 Sacatello Industrial DriveM5L27‐10\IWC Restoration Reports\InspRep091319.docx
Area staked out for the new sediment
clean‐out pool and rip rap check dam at
the southwest corner of the site.
Town of Montville Inspection Report
H:\IWC\Applications\Past Years\2018\18 Sacatello Industrial DriveM5L27‐10\IWC Restoration Reports\InspRep091319.docx
All the equipment along the wooded
side of the gravel access road has been
removed except for this black pipe.
Town of Montville Inspection Report
H:\IWC\Applications\Past Years\2018\18 Sacatello Industrial DriveM5L27-10\IWC Restoration Reports\InspRep061819.docx
Date: 6/18/2019 Inspection Type: Wetland Restoration
Inspection
Yes No
MS4/ Erosion and Sediment Control Inspection ☒ ☐
Location: 18 Sachatello Industrial Drive Map/Lot: M5L27-10
Parties
Present
Choose
an
item.
Choose
an
item.
Choose
an
item.
Choose
an
item.
Choose
an
item.
Other: Click here to enter text.
Click here to enter text.
Click here to enter text.
Yes No
CZC Approved ☐ ☒
N/A
Comments/Observations
Resolution: Ongoing Date: 6/18/2019
Inspected just the access road today, the equipment and stockpile will eventually be removed.
Monitoring will be ongoing for the Wetland Restoration and E&S while in the process.
Town of Montville Inspection Report
H:\IWC\Applications\Past Years\2018\18 Sacatello Industrial DriveM5L27-10\IWC Restoration Reports\InspRep061819.docx
Equipment and a stock pile on the access
road that have not be removed.
Equipment not yet removed from another
portion of the access road.
Town of Montville Inspection Report
H:\IWC\Applications\Past Years\2018\18 Sacatello Industrial DriveM5L27‐10\IWC Restoration
Reports\InspRep062019.docx
Date: 6/20/2019 Inspection Type: Wetlands Restoration
Inspection
Location: 18 Sachatello Drive Map/Lot: M5 L27-10
Parties
Present
Choose
an
item.
Choose
an
item.
Choose
an
item.
Choose
an
item.
Choose
an
item.
Other: Click here to enter text.
Click here to enter text.
Click here to enter text.
Click here to enter text.
Yes No
CZC Approved ☐ ☒
N/A
Comments/Observations
Resolution Date: 6/20/2019
Inspection at the start of the wetland restoration project on this property, work will be ongoing as
weather permits until the approved restoration plan is completed.
Monitoring will be ongoing until the restoration project is completed.
Town of Montville Inspection Report
H:\IWC\Applications\Past Years\2018\18 Sacatello Industrial DriveM5L27‐10\IWC Restoration
Reports\InspRep062019.docx
Stockpile of material was removed but
the equipment on the left side
remained.
The right side of the access road had
new material placed on it and the
equipment had been removed
Same as above
Town of Montville Inspection Report
H:\IWC\Applications\Past Years\2018\18 Sacatello Industrial DriveM5L27‐10\IWC Restoration
Reports\InspRep062019.docx
Same as above, red arrow indicates the area
of new material placement for the wetland
restoration.
Access road heading towards rear of parcel
and the stockpile area.
Silt fencing in place, work will begin on the
permanent sediment basin, a wood chip
check dam, riprap spreader will also be
installed. Once completed the basin will be
bordered by boulders.
Town of Montville Inspection Report
H:\IWC\Applications\Past Years\2018\18 Sacatello Industrial DriveM5L27‐10\IWC Restoration
Reports\InspRep062019.docx
Same as above
Same as above
Same as above
Town of Montville Inspection Report
H:\IWC\Applications\Past Years\2018\18 Sacatello Industrial DriveM5L27‐10\IWC Restoration
Reports\InspRep060619.docx
Date: 6/6/2019 Inspection Type: Wetland Restoration
Inspection
Location: 18 Sachatello Drive Map/Lot: M5 L27-10
Parties
Present
Choose
an
item.
Choose
an
item.
Choose
an
item.
Choose
an
item.
Choose
an
item.
Other: Click here to enter text.
Click here to enter text.
Click here to enter text.
Click here to enter text.
Yes No
CZC Approved ☐ ☒
N/A
Comments/Observations
Resolution Date: 6/6/2019
Inspection at the start of the wetland restoration project on this property, work will be ongoing as
weather permits until the approved restoration plan is completed.
Monitoring will be ongoing until the restoration project is completed.
Town of Montville Inspection Report
H:\IWC\Applications\Past Years\2018\18 Sacatello Industrial DriveM5L27‐10\IWC Restoration
Reports\InspRep060619.docx
Stockpile of material on the access
road.
Town of Montville Inspection Report
H:\IWC\Applications\Past Years\2018\18 Sacatello Industrial DriveM5L27‐10\IWC Restoration
Reports\InspRep060619.docx
Equipment and stockpile on the access road
will eventually be removed.
Wood chip berm in place near the start of the
wetland restoration.
Town of Montville Inspection Report
H:\IWC\Applications\Past Years\2018\18 Sacatello Industrial DriveM5L27‐10\IWC Restoration
Reports\InspRep060619.docx
Excavation and placement of the silt fencing
is being in regards to the wetland
restoration.