Loading...
HomeMy WebLinkAboutInspection ReportsTown of Montville Inspection Report                       H:\IWC\Applications\Past Years\2018\18 Sacatello Industrial DriveM5L27‐10\IWC Restoration Reports\InspRep111219.docx      Date: 11/12/19 Inspection Type: Wetlands Restoration Inspection Location: 18 Sachatello Drive Map/Lot: M5 L27-10 Parties Present Choose  an  item. Choose  an  item. Choose  an  item. Choose  an  item. Choose  an  item.  Other: Bob Russo – CLA & Paul Stone‐  Lombardi Gravel  Click here to enter text.  Click here to enter text.  Click here to enter text.   Yes No CZC Approved ☐ ☐          N/A  Comments/Observations                        Resolution        Date: 11/12/2019      Met Bob Russo from CLA Engineering and Paul Stone with Lombardi out at the site today. The Wetland  Restoration Project has been completed per the approved plan.  Mr. Russo will provide a report for the Commission to review at their November 21, 2019 meeting.  It will be his recommendation and my recommendation that the restoration has been completed, I will  then recommend that the Cease and Restore Order be lifted with conditions.    Monitoring will continue to ensure that maintenance be ongoing and done as needed.  Town of Montville Inspection Report                       H:\IWC\Applications\Past Years\2018\18 Sacatello Industrial DriveM5L27‐10\IWC Restoration Reports\InspRep111219.docx            Northeast sediment basin with  plantings of red maple, high bush  blueberry, winterberry holly and  arrowood viburnum.  Town of Montville Inspection Report                       H:\IWC\Applications\Past Years\2018\18 Sacatello Industrial DriveM5L27‐10\IWC Restoration Reports\InspRep111219.docx                     Northwest sediment basin with  plantings of red maple, high bush  blueberry, winterberry holly and  arrowood viburnum.  Town of Montville Inspection Report                       H:\IWC\Applications\Past Years\2018\18 Sacatello Industrial DriveM5L27‐10\IWC Restoration Reports\InspRep102419.docx      Date: 10/24/19 Inspection Type: Wetlands Restoration Inspection Location: 18 Sachatello Drive Map/Lot: M5 L27-10 Parties Present Choose  an  item. Choose  an  item. Choose  an  item. Choose  an  item. Choose  an  item.  Other: Bob Russo – CLA & Paul Stone‐  Lombardi Gravel  Click here to enter text.  Click here to enter text.  Click here to enter text.   Yes No CZC Approved ☐ ☒          N/A  Comments/Observations                        Resolution        Date: 10/24/2019      Met Bob Russo from CLA Engineering and Paul Stone out at the site today. The Wetland Restoration  work on the property is ongoing, more planting will be done in the northeast basin and repairs to other  areas have almost been done.  An inspection will be planned in a week or so to verify planting of appropriate numbers of red maple,  highbush blueberry, winterberry holly and arrowood viburnum has been done per plan approved.  Mr. Russo plans to have the first annual report to the Inland Wetland Commission, for their November  21, 2019 meeting.    Monitoring will be ongoing, restoration work per plan is nearing completion.  Town of Montville Inspection Report                       H:\IWC\Applications\Past Years\2018\18 Sacatello Industrial DriveM5L27‐10\IWC Restoration Reports\InspRep102419.docx              Sediment was cleaned from in front of  orange fencing and from within the  basin below.  Riprap stone was replaced in the area  that had washed out.  Town of Montville Inspection Report                       H:\IWC\Applications\Past Years\2018\18 Sacatello Industrial DriveM5L27‐10\IWC Restoration Reports\InspRep101819.docx      Date: 10/18/19 Inspection Type: Wetlands Restoration Inspection Location: 18 Sachatello Drive Map/Lot: M5 L27-10 Parties Present Choose  an  item. Choose  an  item. Choose  an  item. Choose  an  item. Choose  an  item.  Other: Bob Russo ‐ CLA  Click here to enter text.  Click here to enter text.  Click here to enter text.   Yes No CZC Approved ☐ ☒          N/A  Comments/Observations                        Resolution        Date: 10/18/2019      Met Bob Russo from CLA Engineering out at the site today. The Wetland Restoration work on the  property is wrapping up as per the approved plan. All areas are seeded and grass mix has taken and is  coming in well in all areas. Check dams sediment basins and wood chip/stone berms are in place.  Highbush blueberry, Red Maple and Holly have been planted as per the plan.  There are areas that will need to be addressed due to a very heavy rain event that occurred on   Wednesday, 10/16/19, over five inches of rain fell in a short period of time. Areas will be re‐enforced  with more stone and repaired as needed. A re‐inspection with Mr. Russo and Paul Stone will be planned  for October 24, 2019.  Mr. Russo plans to have the first annual report to the Inland Wetland Commission, for their November  21, 2019 meeting.    Monitoring will be ongoing, restoration work per plan is nearing completion.  Town of Montville Inspection Report                       H:\IWC\Applications\Past Years\2018\18 Sacatello Industrial DriveM5L27‐10\IWC Restoration Reports\InspRep101819.docx              Check dam and berm have been  installed to the right of the entrance to  the rear stock pile area. Photo below  shows the same area different view.  Heading to the rear stock pile area, the  equipment on the right side of the road  near the wetland area has been  removed.  Town of Montville Inspection Report                       H:\IWC\Applications\Past Years\2018\18 Sacatello Industrial DriveM5L27‐10\IWC Restoration Reports\InspRep101819.docx                Sediment basin held up well  considering the more than average rain  fall that took place on 10‐16‐19.  Areas that were weakened by the rain  event will be repaired and stone will be  added in between the concrete blocks  to reinforce that area to avoid future  breaches.  Town of Montville Inspection Report                       H:\IWC\Applications\Past Years\2018\18 Sacatello Industrial DriveM5L27‐10\IWC Restoration Reports\InspRep101819.docx          Red Maple, Winterberry Holly and High  Bush Blueberry have been planted in  the northwest sediment basin area.  Town of Montville Inspection Report                       H:\IWC\Applications\Past Years\2018\18 Sacatello Industrial DriveM5L27‐10\IWC Restoration Reports\InspRep101819.docx            View of the northwest sediment basin,  check dam and vegetated swale.  Same as above.  Existing heavily vegetated swale along  the eastern portion of the stock pile  area.  Town of Montville Inspection Report                       H:\IWC\Applications\Past Years\2018\18 Sacatello Industrial DriveM5L27‐10\IWC Restoration Reports\InspRep101819.docx          Red Maple has been planted in the  northeast sediment basin area, will  confirm if Winterberry Holly, High Bush  Blueberry and Arrowood Viburnum  have been planted also as per plan.  Same as above facing toward the south.  Areas where excess sediment could  form rills in the vegetated swale in the  northeast sediment basin area. This will  be addressed by adding more rip rap  stone in between the concrete blocks.  Town of Montville Inspection Report                       H:\IWC\Applications\Past Years\2018\18 Sacatello Industrial DriveM5L27‐10\IWC Restoration Reports\InspRep101819.docx          The spreader held up well from  Wednesday’s rain event.  View of the access road facing north, all  the equipment has been removed from  the western edge of the road.   Spreader area that was breached by the  heavy rainfall near the rock crusher,  this area will be repaired and re‐ enforced.  Town of Montville Inspection Report                       H:\IWC\Applications\Past Years\2018\18 Sacatello Industrial DriveM5L27‐10\IWC Restoration Reports\InspRep101819.docx       Same as above, showing the sediment  that entered basin from the breach.  Cat tails in the sediment basin and  vegetated swale in place behind that.  Town of Montville Inspection Report                       H:\IWC\Applications\Past Years\2018\18 Sacatello Industrial DriveM5L27‐10\IWC Restoration Reports\InspRep092719.docx      Date: 9/27/2019 Inspection Type: Wetlands Restoration Inspection Location: 18 Sachatello Drive Map/Lot: M5 L27-10 Parties Present Choose  an  item. Choose  an  item. Choose  an  item. Choose  an  item. Choose  an  item.  Other: Bob Russo ‐ CLA  Click here to enter text.  Click here to enter text.  Click here to enter text.   Yes No CZC Approved ☐ ☒          N/A  Comments/Observations                        Resolution        Date: 9/27/2019      I meet Bob Russo from CLA Engineering out at the site today. The Wetland Restoration work on the  property is going as per the approved plan. All areas are seeded and grass mix has taken and is coming  in well in all areas. Check dams and wood chip berms are in place. Highbush blueberry and other  plantings will possibly go in now while weather permits and will finish up in the Spring of 2020 if they  can’t get them all in.   Will go back out again in October 2019 to view more progress.  Mr. Russo should have the first annual report for the Inland Wetlands Commission, for their November  21, 2019 meeting.    Monitoring will be ongoing, restoration work per plan is nearing completion.  Town of Montville Inspection Report                       H:\IWC\Applications\Past Years\2018\18 Sacatello Industrial DriveM5L27‐10\IWC Restoration Reports\InspRep092719.docx              Permanent Sediment Basin in northeast  corner is now in, seed mix took well,  and blocks are in place at perimeter.  Same as above.  Same area as above showing the rip rap  spreader.  Town of Montville Inspection Report                       H:\IWC\Applications\Past Years\2018\18 Sacatello Industrial DriveM5L27‐10\IWC Restoration Reports\InspRep092719.docx    Same as above.  Wood chip and rip rap berm and the  rip rap spreader is complete in the  northwest corner.  Closer view of wood chip and rip rap  check dam.  Town of Montville Inspection Report                       H:\IWC\Applications\Past Years\2018\18 Sacatello Industrial DriveM5L27‐10\IWC Restoration Reports\InspRep092719.docx                Looking towards sediment basin on the  western portion of the site. Blocks are  in place along the perimeter.  Closer view of rip rap and wood chip  check dam in place towards southwest  portion of site.  Looking south towards sediment basin  on west side, you can see that the  blocks are in place along the perimeter  also.  Town of Montville Inspection Report                       H:\IWC\Applications\Past Years\2018\18 Sacatello Industrial DriveM5L27‐10\IWC Restoration Reports\InspRep092719.docx            The area above has been seeded.  Grass has already started to come in on  the western portion of the site being  restored.  Smaller basin and check dam in.  Town of Montville Inspection Report                       H:\IWC\Applications\Past Years\2018\18 Sacatello Industrial DriveM5L27‐10\IWC Restoration Reports\InspRep092719.docx        Blocks and seeded area extend to  southern portion of the site.  Area near the entrance to the rear  stock pile area which is in the buffer  area will be cleaned out and a check  dam will be installed.  The sediment basin near the crusher in  the distance will be cleaned out and a  stone and wood chip berm will go in.  Town of Montville Inspection Report                       H:\IWC\Applications\Past Years\2018\18 Sacatello Industrial DriveM5L27‐10\IWC Restoration Reports\InspRep091319.docx      Date: 9/13/2019 Inspection Type: Wetlands Restoration Inspection Location: 18 Sachatello Drive Map/Lot: M5 L27-10 Parties Present Choose  an  item. Choose  an  item. Choose  an  item. Choose  an  item. Choose  an  item.  Other: Bob Russo ‐ CLA  Click here to enter text.  Click here to enter text.  Click here to enter text.   Yes No CZC Approved ☐ ☒          N/A  Comments/Observations                          Resolution        Date: 9/13/2019      I meet Bob Russo from CLA Engineering out at the site today. The Wetland Restoration work on the  property is going as per the approved plan. Mr. Russo should have the first annual report for the Inland  Wetlands Commission, for their November 21, 2019 meeting.    Monitoring will be ongoing until the restoration project is completed.  Town of Montville Inspection Report                       H:\IWC\Applications\Past Years\2018\18 Sacatello Industrial DriveM5L27‐10\IWC Restoration Reports\InspRep091319.docx              Permanent Sediment Basin in northeast  corner is now in. The boulders will need  to be put in place along the front  portion that abuts the main stockpile  area. The Red Maple, Highbush  Blueberry and other plantings will need  to go in as weather permits.  Grading has started on the northwest  portion of the site.  Same as above.  Town of Montville Inspection Report                       H:\IWC\Applications\Past Years\2018\18 Sacatello Industrial DriveM5L27‐10\IWC Restoration Reports\InspRep091319.docx                Same as above.  Same as above.  Grading continues toward the  southwest corner.  Town of Montville Inspection Report                       H:\IWC\Applications\Past Years\2018\18 Sacatello Industrial DriveM5L27‐10\IWC Restoration Reports\InspRep091319.docx              Area staked out for the new sediment  clean‐out pool and rip rap check dam at  the southwest corner of the site.    Town of Montville Inspection Report                       H:\IWC\Applications\Past Years\2018\18 Sacatello Industrial DriveM5L27‐10\IWC Restoration Reports\InspRep091319.docx    All the equipment along the wooded  side of the gravel access road has been  removed except for this black pipe.    Town of Montville Inspection Report   H:\IWC\Applications\Past Years\2018\18 Sacatello Industrial DriveM5L27-10\IWC Restoration Reports\InspRep061819.docx Date: 6/18/2019 Inspection Type: Wetland Restoration Inspection Yes No MS4/ Erosion and Sediment Control Inspection ☒ ☐    Location: 18 Sachatello Industrial Drive Map/Lot: M5L27-10 Parties Present Choose  an  item. Choose  an  item. Choose  an  item. Choose  an  item. Choose  an  item.  Other: Click here to enter text.    Click here to enter text.  Click here to enter text.   Yes No CZC Approved ☐ ☒  N/A    Comments/Observations                      Resolution: Ongoing        Date: 6/18/2019    Inspected just the access road today, the equipment and stockpile will eventually be removed.  Monitoring will be ongoing for the Wetland Restoration and E&S while in the process.  Town of Montville Inspection Report   H:\IWC\Applications\Past Years\2018\18 Sacatello Industrial DriveM5L27-10\IWC Restoration Reports\InspRep061819.docx                Equipment and a stock pile on the access  road that have not be removed.  Equipment not yet removed from another  portion of the access road.  Town of Montville Inspection Report                                         H:\IWC\Applications\Past Years\2018\18 Sacatello Industrial DriveM5L27‐10\IWC Restoration  Reports\InspRep062019.docx      Date: 6/20/2019 Inspection Type: Wetlands Restoration Inspection Location: 18 Sachatello Drive Map/Lot: M5 L27-10 Parties Present Choose  an  item. Choose  an  item. Choose  an  item. Choose  an  item. Choose  an  item.  Other: Click here to enter text.  Click here to enter text.  Click here to enter text.  Click here to enter text.   Yes No CZC Approved ☐ ☒          N/A  Comments/Observations                          Resolution        Date: 6/20/2019      Inspection at the start of the wetland restoration project on this property, work will be ongoing as  weather permits until the approved restoration plan is completed.    Monitoring will be ongoing until the restoration project is completed.  Town of Montville Inspection Report                                         H:\IWC\Applications\Past Years\2018\18 Sacatello Industrial DriveM5L27‐10\IWC Restoration  Reports\InspRep062019.docx          Stockpile of material was removed but  the equipment on the left side  remained.  The right side of the access road had  new material placed on it and the  equipment had been removed  Same as above  Town of Montville Inspection Report                                         H:\IWC\Applications\Past Years\2018\18 Sacatello Industrial DriveM5L27‐10\IWC Restoration  Reports\InspRep062019.docx            Same as above, red arrow indicates the area  of new material placement for the wetland  restoration.  Access road heading towards rear of parcel  and the stockpile area.  Silt fencing in place, work will begin on the  permanent sediment basin, a wood chip  check dam, riprap spreader will also be  installed. Once completed the basin will be  bordered by boulders.  Town of Montville Inspection Report                                         H:\IWC\Applications\Past Years\2018\18 Sacatello Industrial DriveM5L27‐10\IWC Restoration  Reports\InspRep062019.docx            Same as above  Same as above  Same as above  Town of Montville Inspection Report                                              H:\IWC\Applications\Past Years\2018\18 Sacatello Industrial DriveM5L27‐10\IWC Restoration  Reports\InspRep060619.docx      Date: 6/6/2019 Inspection Type: Wetland Restoration Inspection Location: 18 Sachatello Drive Map/Lot: M5 L27-10 Parties Present Choose  an  item. Choose  an  item. Choose  an  item. Choose  an  item. Choose  an  item.  Other: Click here to enter text.  Click here to enter text.  Click here to enter text.  Click here to enter text.   Yes No CZC Approved ☐ ☒          N/A  Comments/Observations                          Resolution        Date: 6/6/2019      Inspection at the start of the wetland restoration project on this property, work will be ongoing as  weather permits until the approved restoration plan is completed.    Monitoring will be ongoing until the restoration project is completed.  Town of Montville Inspection Report                                              H:\IWC\Applications\Past Years\2018\18 Sacatello Industrial DriveM5L27‐10\IWC Restoration  Reports\InspRep060619.docx          Stockpile of material on the access  road.    Town of Montville Inspection Report                                              H:\IWC\Applications\Past Years\2018\18 Sacatello Industrial DriveM5L27‐10\IWC Restoration  Reports\InspRep060619.docx                Equipment and stockpile on the access road  will eventually be removed.    Wood chip berm in place near the start of the  wetland restoration.  Town of Montville Inspection Report                                              H:\IWC\Applications\Past Years\2018\18 Sacatello Industrial DriveM5L27‐10\IWC Restoration  Reports\InspRep060619.docx              Excavation and placement of the silt fencing  is being in regards to the wetland  restoration.