HomeMy WebLinkAbout221SITE2 PlannerComments 12132022H:\PZC\Applications\2022\22 SITE 2 - 245 Route 32 - 22 Unit Condominium
Development\Staff\PLANNER\221SITE2 245Rte32 PlannerComments PostApprvl 12132022.doc
TOWN OF MONTVILLE
OFFICE OF THE PLANNING DIRECTOR
310 Norwich-New London Turnpike, Uncasville, CT 06382
Telephone: (860) 848-6779
Email: lburdick@montville-ct.org
MEMORANDUM FOR THE RECORD
POST APPROVAL
Prepared by Liz Burdick, Planning Director
on December 13, 2022
Property Address: 245 Norwich-New London Turnpike (CT Rte. 32), Uncasville, CT
Application: PZ #22SITE 2
Applicant(s): Western Group, LLC, John Eoanou, Member
Property Owner(s): Western Group, LLC, John Eoanou, Member
Attorney: N/A.
Engineer: Douglas Reich, RLA, Fuller Engineering & Land Surveying
Land Surveyor: Kevin M. Crowley, R.L.S.
LEGAL: Approved with conditions on March 22, 2022.
PROPOSAL: Applicant is requesting approval of a Phasing Plan. There are no changes
to the final plan, but for constructing 4 buildings in phases 1-4 and utilizing the existing
driveway for construction purposes. The Town Engineer and I have reviewed and
approved the proposed revisions.
Staff recommends the Commission approve the request with conditions as follows: the
following:
I make a MOTION to APPROVE Application PZ #22SITE2 for a 22-unit multi-family
development and associated site improvements in accordance with the Montville Zoning
Regulations and the application, supporting documentation and a plan set entitled
“Zoning Improvement Location & Topography Plan, 245 Norwich-New London Turnpike
(Rt. 32), Montville, CT, Prepared for Western Group, LLC, Prepared by Fuller Engineering
and Land Surveying, dated 7 January 2022, Rev. 10/21/22”, including the Phasing Plan,
with the following conditions:
1. Trash enclosures locations are shown for each phase.
2. All incomplete notes shall be revised to show notes.
3. Advise the reason Unit #10 on sheet C3-1 is shaded apart from other units.
4. Show construction fencing or other barriers between phases.
5. Update Soil Erosion and Sediment Control Plan as needed.