Loading...
HomeMy WebLinkAboutStaff Report (2) \\planning\planningoffice$\IWC\Applications\2022\22 IWC 1 - (82 Jerome Rd 15 Jerome Ave 232 Rte 32) Village Apartments\Staff\82 Jerome Rd (Staff Report) 2-17-2022.docx Staff Report Application # 22 IWC 1 Regular Meeting – Thursday, February 17, 2022 Prepared by Tiffany E Williams, Zoning & Wetlands Enforcement Officer Applicant: Village Apartments, LLC Owner: Village Apartments, LLC/Connecticut Multifamily Equities II, LLC Engineering Info: Seamus Moran, P.E., Loureiro Engineering Associates Soil Scientist: James R. Cowen, Cowen EcoDesign, LLC Attorney Info: Harry B. Heller, Esquire, Heller, Heller & McCoy Address: 82 Jerome Rd, 15 Jerome Rd & 232 Route 32 (MLB 069-042-000, 069-051-000, 069-061-000) Submitted: January 7, 2022 Date Received by IWC: January 20, 2022 (Decision Required Date – 3/26/2022) Applicant Request: Regulated activities (grading) within upland review area associated with construction of Phase III of a multi-family housing development. Activity Description: Wetland Disturbance Area 0 sqft Watercourse/Waterbody Disturbance Area 0 LF Upland Review Disturbance Area 4,857 +/- sqft New Staff Comments: Staff received Soil Scientist comments on 2/15/22 (see attached). Comments #’s 6, 7, and 8 request minor plan revisions. Staff recommends revision be conditions of approval. (see below) Staff Recommendation: The approval of application 22 IWC 1 with conditions \\planning\planningoffice$\IWC\Applications\2022\22 IWC 1 - (82 Jerome Rd 15 Jerome Ave 232 Rte 32) Village Apartments\Staff\82 Jerome Rd (Staff Report) 2-17-2022.docx Draft Motion After giving due consideration to all relevant factors of the Montville Inland Wetland Regulations, including those in Section 6 (Regulated Activities to be Licensed), Section 10.2 (Criteria for Decision) & Section 22a-41 of the Connecticut General Statutes, I move to approve the following application: 22 IWC 1 – Owner: Village Apartments, LLC/Connecticut Multifamily Equities II, LLC Applicant: Village Apartments, LLC. Application for regulated activities (grading) within upland review area associated with construction of Phase III of a multi-family housing development at 82 Jerome Rd (069-042-000), 15 Jerome Ave (069-051-000), 232 Norwich New London Tpke (069-061-000) Uncasville, CT per the application and associated documents dated 1/7/2022 & as shown on a plan entitled “Site Development Plan, Village Apartments – Phase III, New Multi- family Apartment Buildings, 15 Jerome Avenue, 82 Jerome Road and 232 Route 32, Uncasville – Montville, Connecticut. Prepared by Loureiro Engineering Associates, Inc., Dated March 11, 2011 revised November 15, 2021” with the following condition: 1. To revise plan to show locations of topsoil and rock stockpiles on the E&S plan with proper erosion. 2. Revise Sheet 2 in the E&S narrative call for use of water for dust control throughout construction. 3. Revise Sheet 2 in the E&S narrative call for additional E&S supplies (100 ft. of silt fence and 20 hay bales) to be kept on site for unforeseen circumstances.