Loading...
HomeMy WebLinkAbout22SITE9 DEEP LWRDComments 1108221 Colleen Bezanson From:Quispe, Eimy <Eimy.Quispe@ct.gov> Sent:Tuesday, November 8, 2022 2:33 PM To:Liz Burdick Cc:Colleen Bezanson; Hart, Marybeth Subject:RE: 55 Dock Road, Town of Montville Dock and New Fishing Pier - CT DEEP LWRD Letter CAUTION: This email originated from outside the organization. Do not click links or open attachments unless you recognize the sender and know the content is safe. Liz,    Thank you for providing responses to our comments outlined in our letter of November 4, 2022. At this time, we don’t  have additional comments in regards to the proposal. Thank you again for coordinating with us and please feel free to  reach out should you have any questions or concerns.  Best,    Eimy Quispe    Eimy Quispe Environmental Analyst 1 Regulatory - East Land and Water Resource Division Bureau of Water Protection and Land Reuse Connecticut Department of Energy and Environmental Protection 79 Elm Street, Hartford, CT 06106-5127 P: 860.424.4182F: 860.424.4075E: Eimy.Quispe@ct.gov https://portal.ct.gov/deep  Conserving, improving and protecting our natural resources and environment; Ensuring a clean, affordable, reliable, and sustainable energy supply.   From: Liz Burdick <lburdick@montville‐ct.org>   Sent: Monday, November 7, 2022 10:51 AM  To: Quispe, Eimy <Eimy.Quispe@ct.gov>  Cc: Colleen Bezanson <CBezanson@montville‐ct.org>  Subject: FW: 55 Dock Road, Town of Montville Dock and New Fishing Pier ‐ CT DEEP LWRD Letter    EXTERNAL EMAIL: This email originated from outside of the organization. Do not click any links or open any attachments unless you  trust the sender and know the content is safe.  11/7/22 Good morning, Eimy, Please see below email from Kyle Haubert, P.E., CLA Engineers, Inc. in response to the  comments in your email dated 11/04/22.  Please contact me with any questions.  Thank you.   2   Regards, Liz Burdick Director ~ Dept. of Land Use & Development Town of Montville 310 Norwich-New London Turnpike, Uncasville, CT 06382 Telephone: (860) 848-6725 (Direct), (860) 848-6779 (Planning Dept. Main) Email: lburdick@montville-ct.org   From: K Haubert <khaubert@claengineers.com>   Sent: Monday, November 7, 2022 10:24 AM  To: Liz Burdick <lburdick@montville‐ct.org>  Subject: RE: 55 Dock Road, Town of Montville Dock and New Fishing Pier ‐ CT DEEP LWRD Letter    CAUTION: This email originated from outside the organization. Do not click links or open attachments unless you recognize the sender and know the content is safe. Hi Liz,  I have reviewed the review letter from DEEP and offer the following responses    Public Access  ‐ There is landscape area adjacent to the boat launch that can be used for public access signage.  Additionally,  there is a mulched area called for adjacent  the fishing pier entrance for public access signage and typical DEEP  fishing regulation and guideline postings.    Stormwater & Water Quality:    ‐ The 0.06 acre increase in impervious area does not result in a cumulative adverse impact from stormwater  leaving the site or downstream of the site.  As noted in the drainage report the site is located near the terminus  of a 921,600 acre watershed for the Thames River.  The 0.06 acre increase in impervious area is negligible and  will have no negative impact to the River or downstream.    ‐ The goals of the DEEP Storwmwater Quality Manual and MS4 requirements are met through the use of the  water quality basin.  The basin volume has been sized to meet these guidelines.  The use of biofiltering parking  lot islands would not be practical based on the topography of the site and the need to remove parking spaces if  put into use.  The stormwater from the parking area will receive biofiltration through the vegetation in the  water quality basin, accomplishing the same goal as this type of LID feature.    ‐ Sedimentation and erosion control measures and construction details are included on the project plans and shall  be installed prior to construction and shall be maintained throughout construction.    Flood Management Certification and DEEP Permitting:  ‐ CLA has been working with the Town and DEEP for their permitting requirements.  ‐ DEEP Flood Management and Structure Dredge & Fill applications will be submitted shortly and will be acquired  prior to the start of construction.  ‐ DEEP NDDB, DEEP Fisheries, and DEEP Aquaculture have reviewed and approved the current project plans.    Let me know if you need anything else.  Thanks.    Kyle Haubert, P.E. CLA Engineers, Inc. 317 Main Street Norwich, CT 06360 P: (860) 886-1966 F: (860) 886-9165 khaubert@claengineers.com www.claengineers.com Consulting Civil Engineers Since 1984 3   From: Liz Burdick <lburdick@montville‐ct.org>   Sent: Monday, November 7, 2022 9:32 AM  To: K Haubert <khaubert@claengineers.com>  Subject: FW: 55 Dock Road, Town of Montville Dock and New Fishing Pier ‐ CT DEEP LWRD Letter    11/7/22 Good morning, Kyle, Please see attached email from DEEP LWRD.  Would you give me a call at your convenience  to discuss?  Thanks.     Regards, Liz Burdick Director ~ Dept. of Land Use & Development Town of Montville 310 Norwich-New London Turnpike, Uncasville, CT 06382 Telephone: (860) 848-6725 (Direct), (860) 848-6779 (Planning Dept. Main) Email: lburdick@montville-ct.org   From: Quispe, Eimy <Eimy.Quispe@ct.gov>   Sent: Friday, November 4, 2022 4:36 PM  To: Liz Burdick <lburdick@montville‐ct.org>  Cc: Hart, Marybeth <Marybeth.Hart@ct.gov>; McCloe, Adelaine <Adelaine.McCloe@ct.gov>; Colleen Bezanson  <CBezanson@montville‐ct.org>  Subject: 55 Dock Road, Town of Montville Dock and New Fishing Pier ‐ CT DEEP LWRD Letter    CAUTION: This email originated from outside the organization. Do not click links or open attachments unless you recognize the sender and know the content is safe. Dear Liz,    Please see the attached letter as related to the above noted project. We thank the Commission for the opportunity to  provide comments for the proposed improvements to the town dock and new fishing pier. Please feel free to reach out  should you have any questions or concerns. We are happy to provide further assistance if need be.    Best,    Eimy Quispe    Eimy Quispe Environmental Analyst 1 Regulatory - East Land and Water Resource Division Bureau of Water Protection and Land Reuse Connecticut Department of Energy and Environmental Protection 79 Elm Street, Hartford, CT 06106-5127 P: 860.424.4182F: 860.424.4075E: Eimy.Quispe@ct.gov 4 https://portal.ct.gov/deep  Conserving, improving and protecting our natural resources and environment; Ensuring a clean, affordable, reliable, and sustainable energy supply.