HomeMy WebLinkAboutResponse to TE Comment 082922From:Bruton, Matthew, PE To:T Cummings Cc:Liz Burdick; meucalitto.garretthomes@gmail.com Subject:Montville DG - RTC Date:Monday, August 29, 2022 2:03:14 PM Attachments:image001.png1981Rte32 TEComments 081622.pdfSwale Stability - North Am Green ECMDS 7.0.pdf CAUTION: This email originated from outside the organization. Do not click links or open attachments unless you recognize the sender and know the content is safe. Tom, Please see responses below to your letter. #1 – Fire Marshall has inspected and has not requested any additional items related to rear access. #2 – Inspection ports were paved over. Site contractor dug them out and raised to final grade so they are now available for maintenance/inspection. #3 – Southerly home driveway entrance is abandoned. Curb and topsoil has been installed. #4 – Clean outs and manholes have been adjusted to final pavement grade. #5 – Timber railing is installed for onsite safety of vehicles. Exact size wasn’t available but still provides level of safety for a private parking lot. #6 – Contractor installed North American Green C-125. See channel analysis for why this one was selected as opposed to riprap. #7 – Site has either been sodded or has seed and erosion control blanket on the steep slopes to stabilize the site. #8 – Site contractor has raised and exposed per plan. #9 – See #7. Topography isn’t normally included in as-built but if you need it we can add it. Thank you, Matthew J. Bruton, P.E. Regional Manager Principal BL Companies | Employee owned. Client driven. 100 Constitution Plaza, 10th Floor, Hartford, CT 06103 tel: 860.249.2200 | direct: 860.760.1933 cell: 860.659.7286 www.blcompanies.com We’re growing! Build your career at BL. Learn about opportunities here