HomeMy WebLinkAbout22SITE8 Plan Changes Narrative 102522From:David McKay
To:Liz Burdick
Cc:Harry Heller; Mark Augur; John Reece; "T Cummings"; John Faulise
Subject:RE: Phase III Gateway Terminal
Date:Monday, October 24, 2022 5:18:17 PM
Attachments:Depot Road Phase 3 Presentation Figure.pdfDepot Road Site Plan Phase 3 Changes Red.pdf
CAUTION: This email originated from outside the organization. Do not click links or open
attachments unless you recognize the sender and know the content is safe.
Good afternoon Liz,
Please see attached for sheets 2 through 4 of the Phase III plan with the modifications shown in red.
Also attached is a color presentation drawing with the modifications shown in red.
The changes made to the Phase 2 area include the following:
Modify the proposed limits of the material/cargo stockpile areas. The originally proposed
limits are shown on the color presentation figure in yellow and the new proposed limits are
shown in red.
Add a 24-foot wide compacted millings circulation driveway that loops through the site for
truck access to the proposed material storage area. The outline of the proposed driveway is
shown in red. The turning movements shown on sheets 5 and 6 of the site plans are for a
WB-67 tractor trailer.
Added five employee parking spaces on the existing concrete pad to the east of the railroad
tracks. The line striping is shown in red.
Please let me know if you need any additional information.
Thank you!
Dave
David C. McKay, P.E.
Boundaries L.L.C.
179 Pachaug River Drive
P.O. Box 184
Griswold, CT 06351
Phone: 860-376-2006
Fax: 860-376-5899