HomeMy WebLinkAbout22SITE1 UH CommentsProject Name: Village Apts Phase III
Project Location: 82 Jerome Rd, 15 Jerome Ave & 232 Rt 32
Reviewing Agency: Uncas Health
Review Date: January 18, 2022
Reviewed By: Michael J. Kirby, R.S.
Notes:
1. Prior to demolition of the house at 232 Route 32, an asbestos inspection must be
completed. If asbestos is found an abatement must be conducted.
2. All existing wells must be abandoned by a licensed well driller.
3. The existing septic system at 232 Route 32 must be properly abandoned.
Electronic Signature: Michael J. Kirby