May 24, 2022 PZC Meeting
Prepared by Liz Burdick, Planning Director
on 5/24/22
Property Address: 82 Jerome Rd, 15 Jerome Ave, and 232 Norwich-New London
Turnpike (State Route 32)
Application: PZ #22SITE1 for site plan review/approval.
Applicant(s): Village Apartments, LLC
Property Owner(s): Village Apartments, LLC (82 Jerome Rd & 232 Rte. 32) and
Connecticut Multifamily Equities II, LLC (15 Jerome Ave).
Attorney: Harry B. Heller, Esq., Heller, Heller & McCoy
Engineer: Seamus Moran, P.E., Loureiro Engineering Associates
Legal: Submitted to Planning Dept. on 01/12/22. Date of Receipt by PZC: 1/25/22.
Decision Required Date: 03/30/22. Application tabled from the 3/22/22 meeting
(extension granted). Tabled to the application to the May 24, 2022 meeting (extension
granted).
IN REVIEW:
- A narrative dated November 15, 2021 addresses compliance with ZR Section 15.2
(Special Flood Hazard Area Requirements).
- The Utilities Report dated November 15, 2021 addresses the adequacy of existing
water & sewer service providers to serve the project.
- ZR Sec. 17.6 (Site Plan Review Criteria) has been addressed in response comments
of Attorney Heller dated 4/25/22.
NEW PLANNER STAFF COMMENTS:
Please be advised of the following comments with regard to my review of the revised
plan set entitled “Site Development Plan, Village Apartments – Phase III, New Multi-family
Apartment Buildings, 15 Jerome Avenue, 82 Jerome Road and 232 Route 32, Dated
March 11, 2021, Revised 05/24/22” and Parking Narrative, Dated 05/24/22:
- A four (4’) foot high decorative fence has been proposed adjacent to existing
residential properties at the east & west side of the new entrance as shown on Plan set
revised 5/24/22.
- Copy of OSTA application was submitted on 5/24/22.
IN REVIEW:
INLAND WETLANDS COMMISSION: On 2/18/22, the IWC approved with conditions the regulated
activities associated with the project. The site plan revised to 3/15/22 has been revised to address.
UNCAS HEALTH DISTRICT: Comments dated 1/18/22 have been addressed per email dated
03/16/22.
STATE OF CT DEPT. OF HEALTH: N/A.
TOWN ENGINEER: Past comments satisfactorily addressed per email dated, May 24, 2022.
FIRE MARSHAL: Comments dated 1/25/22 have been addressed per email dated 1/27/22.
BUILDING DEPT.: No comments received to date.
WPCA: Approval comments dated 01/19/22.
\\planning\planningoffice$\PZC\Applications\2022\22 SITE 1 - 82 Jerome Rd 3 Multi-Family Dwelling
Units\Staff\PLANNER\22SITE1 VillageApts PlannerComments5 052422.doc
STCT DOT: N/A.
OFFICE OF THE STATE TRAFFIC ADMINISTRATION (OSTA): Yes. The plan requires review by OSTA due
to proposed 268 new parking spaces. Copy of OSTA application pending.
STCT DEEP: A General Stormwater Quality Permit is required subsequent to local approval.
BOND: $106,230 approved by the Town Engineer on 5/16/22.
PLANNER STAFF RECOMMENDATION: APPROVE WITH CONDITIONS.
The following MOTION is suggested for any favorable approval:
I make a MOTION to APPROVE PZ #22 SITE 1- 82 Jerome Rd, 15 Jerome Ave, 232 Norwich-
New London Turnpike, (M/B/L 069-042-000, 069-051-000, 069-061-000), Uncasville, CT,
Applicant/Owner: Village Apartments, LLC and Connecticut Multifamily Equities II, LLC -
Agent: Attorney Harry Heller for three (3) proposed new Multi-Family Buildings for 160
new dwelling units for a total of 214 dwelling units, and associated site improvements in
accordance with the application, supporting documentations and a plan entitled: “Site
Development Plan, Village Apartments – Phase III, New Multi-family Apartment Buildings,
15 Jerome Avenue, 82 Jerome Road and 232 Route 32, Prepared by Loureiro Engineering
Associates, Dated March 11, 2021, Revised to 05/24/22” with the following conditions:
1. The lot line adjustment (merger) plan shall be filed on the Land Records in the
office of the Town Clerk prior to issuance of a zoning permit to start work and the address
of the properties when merged shall be coordinated with the Montville Tax Assessor.
2. The Parking Plan/Narrative dated November 15, 2021 and the May 24, 2022
revised Parking Narrative, reviewed & approved by the Town Engineer on 5/24/22, shall
be part of this approval.
3. The final revised plan sets, along with a digital copy of the final plan, shall be
submitted to the Planning Dept. & shall be signed and sealed by P.E., LS and CSS prior to
the issuance of zoning permit to start work.
4. Before construction of the project commences, the project will further require (i)
OSTA (Office of the State Traffic Authority) permit for a major traffic generator; and (ii)
DEEP (Dept. Energy Environmental Protection) registration under the Connecticut
General Permit for the Discharge of Stormwater and Dewatering Wastewaters from
Construction Activities.
5. Applicant shall comply with all requirements of Uncas Health District and the
Montville WPCA, Fire Marshal and Building Official during project construction.
6. On-site rock/materials processing requires a zoning permit reviewed & approved
by the Zoning Official per ZR Section 4.11.11/4.11.11 5 (Excavations/Processing –
Requirement for Res. Zones) prior to start.
7. Prior to issuance of a zoning permit to start work, a soil erosion & sediment control
bond shall be posted in the amount of $106, 230 in a form acceptable to the Finance
Director.
8. An approved zoning permit is required prior to the start of any work.
\\planning\planningoffice$\PZC\Applications\2022\22 SITE 1 - 82 Jerome Rd 3 Multi-Family Dwelling
Units\Staff\PLANNER\22SITE1 VillageApts PlannerComments5 052422.doc
9. After work has commenced, any substantive changes to the approved site plan
require review & approval by the Planning Director and/or the Planning & Zoning
Commission.
10. The ZEO must be contacted and a pre-construction meeting shall be held at least
24- hours prior to start of any work.
11. Soil Erosion and Sediment Controls shall be installed and inspected by the ZEO
prior to the start of any work.
12. Post-Construction Requirements as follows:
After construction is completed and accepted by the Owner, it shall be the
responsibility of the Owner to maintain all drainage structures as shown on Plan
Details Sheet DN-6. In addition, the following inspection and maintenance
guidelines shall be the responsibility of the Owner, beginning the first year period
following construction completion and acceptance, and shall be followed each
year thereafter:
1. Inspect every six (6) months during the first year of operation and adjust
the Inspection Interval based on previous observations of sediment accumulation
and high water elevations.
2. Conduct jetting and vactoring annually or when inspection shows that
maintenance is necessary.
3. Drainage and other Paved Areas: Inspect on a regular basis not to exceed
weekly for litter and debris. Sweep at least twice a year, with the first
occurring as soon as possible after first snowmelt and the second not less than
90 days following the first.
4. Catch Basin Sumps: Inspect semi-annually and cleaned when the sump is one
half full of silt and/or debris.
5. Landscaped Areas: Inspect semi-annually for erosion or dying vegetation.
Repair and stabilize any bare or eroded areas and replace vegetation as
soon as possible.
H:\PZC\Applications\2022\22 SITE 1 - 82 Jerome Rd 3 Multi-Family Dwelling Units\Staff\PLANNER\22SITE1
VillageApts PlannerComments 4 042522.doc
TOWN OF MONTVILLE
OFFICE OF THE PLANNING DIRECTOR
310 Norwich-New London Turnpike, Uncasville, CT 06382
Telephone: (860) 848-6779
Email: lburdick@montville-ct.org
MEMORANDUM FOR THE RECORD
April 26, 2022 PZC Meeting
Prepared by Liz Burdick, Planning Director
on 4/26/22
Property Address: 82 Jerome Rd, 15 Jerome Ave, and 232 Norwich-New London
Turnpike (State Route 32)
Application: PZ #22SITE1 for site plan review/approval.
Applicant(s): Village Apartments, LLC
Property Owner(s): Village Apartments, LLC (82 Jerome Rd & 232 Rte. 32) and
Connecticut Multifamily Equities II, LLC (15 Jerome Ave).
Attorney: Harry B. Heller, Esq., Heller, Heller & McCoy
Engineer: Seamus Moran, P.E., Loureiro Engineering Associates
Legal: Submitted to Planning Dept. on 01/12/22. Date of Receipt by PZC: 1/25/22.
Decision Required Date: 03/30/22. Application tabled from the 3/22/22 meeting
(extension granted). Attorney Heller for Applicant request dated 4/26/22 to table to the
application to the May 24, 2022 regular meeting of the PZC and grants a (27-day)
extension of time to do so.
NEW PLANNER STAFF COMMENTS:
Please be advised of the following comments with regard to my review of the revised
plan set entitled “Site Development Plan, Village Apartments – Phase III, New Multi-family
Apartment Buildings, 15 Jerome Avenue, 82 Jerome Road and 232 Route 32, Dated
March 11, 2021, Revised 3/15/22” and response comments from Attorney Heller, dated
04/25/22:
- In review, a narrative dated November 15, 2021 addresses compliance with ZR
Section 15.2 (Special Flood Hazard Area Requirements).
- In review, the Utilities Report dated November 15, 2021 addresses the adequacy
of existing water & sewer service providers to serve the project.
- Outstanding - The Commission shall consider the general objectives in ZR Section
17.6. Applicant should address in writing and submit as part of the application.
- Outstanding - ZR 17.6.10 – Submit SESC bond estimate for review/approval by
Town Engineer. Town Engineer, in his memo dated 4/13/22 has requested detailed
backup for this estimate.
- Outstanding - ZR 18.16.2 – Consider fencing screening on 15 Jerome Ave.
adjacent to existing residential single-family dwelling. Staff recommends adding a solid
decorative fence in addition to proposed landscaped buffer as approved by the Town
Planner or Zoning Official. Possible condition of any approval.
- ZR Sec. 17.6 (Site Plan Review Criteria) has been addressed in response
comments of Attorney Heller dated 4/25/22.
- ZR Sec.17.4.10 – OSTA application. Before construction of the project
commences, the project will further require (i) and OSTA permit for a major traffic
generator and (ii) registration under the Connecticut General Permit for the Discharge of
H:\PZC\Applications\2022\22 SITE 1 - 82 Jerome Rd 3 Multi-Family Dwelling Units\Staff\PLANNER\22SITE1
VillageApts PlannerComments 4 042522.doc
Stormwater and Dewatering Wastewaters from Construction Activities. Condition of any
approval.
- ZR Sec. 18.3 - The Commission shall approve the Parking Plan dated November
15, 2021. See response comments of Attorney Heller dated 4/25/22. Condition of any
approval.
- Survey Note 6 has been revised to state that the address of the properties when
merged will be coordinated with the Montville Tax Assessor. Condition of any approval.
- ZR Sec. 17.3.1(GIS). The Applicant shall provide digital data per this section for the
final approved site plans prior to issuance of a zoning permit to start work. Condition of
any approval.
- A lot line adjustment (merger) plan shall be filed on the Land Records in the office
of the Town Clerk prior to issuance of a zoning permit to start work. Condition of any
approval.
IN REVIEW:
INLAND WETLANDS COMMISSION: On 2/18/22, the IWC approved with conditions the regulated
activities associated with the project. The site plan revised to 3/15/22 has been revised to address.
UNCAS HEALTH DISTRICT: Comments dated 1/18/22 shall be addressed as a condition of any
approval.
STATE OF CT DEPT. OF HEALTH: N/A.
TOWN ENGINEER: Revised comments dated 4/13/22 shall be addressed by the Applicant.
FIRE MARSHAL: Comments dated 1/25/22 have been addressed per email dated 1/27/22.
BUILDING DEPT.: No comments received to date.
WPCA: Approval comments dated 01/19/22. STCT DOT: N/A.
OFFICE OF THE STATE TRAFFIC ADMINISTRATION (OSTA): Yes. The plan requires review by OSTA due
to proposed 268 new parking spaces. Copy of OSTA application pending.
STCT DEEP: A General Stormwater Quality Permit is required subsequent to local approval.
Condition of approval.
BOND: Soil Erosion & Sediment Control bond estimate requires revisions per Town Engineer
comments date 4/13/22. A bond estimate in the amount of $106,230 for review and approval by
the Town Engineer.
PLANNER STAFF RECOMMENDATION: Make a MOTION to accept the Applicant’s granting
of an extension of time and table Application #PZ 22SITE1 to the May 24, 2022 regular
meeting of the Commission.
\\planning\planningoffice$\PZC\Applications\2022\22 SITE 1 - 82 Jerome Rd 3 Multi-Family Dwelling
Units\Staff\PLANNER\22SITE1 VillageApts PlannerComments 3 041822.doc
TOWN OF MONTVILLE
OFFICE OF THE PLANNING DIRECTOR
310 Norwich-New London Turnpike, Uncasville, CT 06382
Telephone: (860) 848-6779
Email: lburdick@montville-ct.org
MEMORANDUM FOR THE RECORD
April 26, 2022 PZC Meeting
Prepared by Liz Burdick, Planning Director
on 4/18/22
Property Address: 82 Jerome Rd, 15 Jerome Ave, and 232 Norwich-New London
Turnpike (State Route 32)
Application: PZ #22SITE1 for site plan review/approval.
Applicant(s): Village Apartments, LLC
Property Owner(s): Village Apartments, LLC (82 Jerome Rd & 232 Rte. 32) and
Connecticut Multifamily Equities II, LLC (15 Jerome Ave).
Attorney: Harry B. Heller, Esq., Heller, Heller & McCoy
Engineer: Seamus Moran, P.E., Loureiro Engineering Associates
Legal: Submitted to Planning Dept. on 01/12/22. Date of Receipt by PZC: 1/25/22.
Decision Required Date: 03/30/22. Application tabled from the 3/22/22 meeting
(extension granted).
NEW PLANNER STAFF COMMENTS:
Please be advised of the following comments with regard to my review of the revised
plan set entitled “Site Development Plan, Village Apartments – Phase III, New Multi-family
Apartment Buildings, 15 Jerome Avenue, 82 Jerome Road and 232 Route 32, Dated
March 11, 2021, Revised 3/15/22”:
- In review, a narrative dated November 15, 2021 addresses compliance with ZR
Section 15.2 (Special Flood Hazard Area Requirements).
- In review, the Utilities Report dated November 15, 2021 addresses the adequacy
of existing water & sewer service providers to serve the project.
- Outstanding - ZR Sec.17.4.10 – submit copy of OSTA application for the record.
- Outstanding - The Commission shall consider the general objectives in ZR Section
17.6. Applicant should address in writing and submit as part of the application.
- Outstanding - ZR 17.6.10 – Submit SESC bond estimate for review/approval by
Town Engineer. Town Engineer, in his memo dated 4/13/22 has requested detailed
backup for this estimate.
- ZR Sec. 18.3 - The Commission shall approve the Parking Plan dated November
15, 2021. Condition of Approval.
- Survey Note 6 has been revised to state that the address of the properties when
merged will be coordinated with the Montville Tax Assessor. Condition of approval.
- ZR Sec. 17.3.1(GIS). The Applicant shall provide digital data per this section for the
final approved site plans prior to issuance of a zoning permit to start work. Condition of
approval.
- ZR 18.16.2 – Consider fencing screening on 15 Jerome Ave. adjacent to existing
residential single-family dwelling. Staff recommends adding a solid decorative fence in
addition to proposed landscaped buffer as approved by the Town Planner or Zoning
Official. Condition of approval.
\\planning\planningoffice$\PZC\Applications\2022\22 SITE 1 - 82 Jerome Rd 3 Multi-Family Dwelling
Units\Staff\PLANNER\22SITE1 VillageApts PlannerComments 3 041822.doc
- A lot line adjustment (merger) plan shall be filed on the Land Records in the office
of the Town Clerk prior to issuance of a zoning permit to start work. Condition of
approval.
IN REVIEW:
INLAND WETLANDS COMMISSION: On 2/18/22, the IWC approved with conditions the regulated
activities associated with the project. The site plan revised to 3/15/22 has been revised to address.
UNCAS HEALTH DISTRICT: Comments dated 1/18/22 shall be addressed as a condition of approval.
STATE OF CT DEPT. OF HEALTH: N/A.
TOWN ENGINEER: Revised comments dated 4/13/22 shall be addressed by the Applicant.
FIRE MARSHAL: Comments dated 1/25/22 have been addressed per email dated 1/27/22.
BUILDING DEPT.: No comments received to date.
WPCA: Approval comments dated 01/19/22.
STCT DOT: N/A.
OFFICE OF THE STATE TRAFFIC ADMINISTRATION (OSTA): Yes. The plan requires review by OSTA due
to proposed 268 new parking spaces. Copy of OSTA application pending.
STCT DEEP: A General Stormwater Quality Permit is required subsequent to local approval.
Condition of approval.
BOND: Soil Erosion & Sediment Control bond estimate requires revisions per Town Engineer
comments date 4/13/22.
PLANNER STAFF RECOMMENDATION:
Pending.
H:\PZC\Applications\2022\22 SITE 1 - 82 Jerome Rd 3 Multi-Family Dwelling Units\Staff\PLANNER\22SITE1
VillageApts PlannerComments 2 032122.doc
TOWN OF MONTVILLE
OFFICE OF THE PLANNING DIRECTOR
310 Norwich-New London Turnpike, Uncasville, CT 06382
Telephone: (860) 848-6779
Email: lburdick@montville-ct.org
MEMORANDUM FOR THE RECORD
March 22, 2022 PZC Meeting
Prepared by Liz Burdick, Planning Director
on 3/21/22
Property Address: 82 Jerome Rd, 15 Jerome Ave, and 232 Norwich-New London
Turnpike (State Route 32)
Application: PZ #22SITE1 for site plan review/approval.
Applicant(s): Village Apartments, LLC
Property Owner(s): Village Apartments, LLC (82 Jerome Rd & 232 Rte. 32) and
Connecticut Multifamily Equities II, LLC (15 Jerome Ave).
Attorney: Harry B. Heller, Esq., Heller, Heller & McCoy
Engineer: Seamus Moran, P.E., Loureiro Engineering Associates
Legal: Submitted to Planning Dept. on 01/12/22. Date of Receipt by PZC: 1/25/22.
Decision Required Date: 03/30/22. Tabled from the 2/22/22 meeting.
NEW PLANNER STAFF COMMENTS:
The Applicant, through its Attorney, Harry Heller, Esq., requests that Application PZ
#22SITE1 be tabled to the 04/26/22 regular meeting of the PZC and grants the
Commission a (30-day) extension of time to do so.
I have reviewed the plan set revised to 3/15/22 with the Town Engineer on 3/18/22.
Planner & TE written comments regarding revised plan outstanding issues pending.
IN REVIEW:
INLAND WETLANDS COMMISSION: On 2/18/22, the IWC approved the regulated activities
associated with the project.
UNCAS HEALTH DISTRICT: See comments dated 1/18/22. Add as conditions of any approval.
STATE OF CT DEPT. OF HEALTH: N/A.
TOWN ENGINEER: See comments dated 02/04/22. Revised comments pending.
FIRE MARSHAL: See comments dated 1/25/22.
BUILDING DEPT.: No comments received to date.
WPCA: See comments dated 01/19/22.
STCT DOT: N/A.
OFFICE OF THE STATE TRAFFIC ADMINISTRATION (OSTA): Yes. The plan requires review by OSTA due
to proposed 268 new parking spaces. Copy of OSTA application pending.
STCT DEEP: A General Stormwater Quality Permit is required subsequent to local approval. Add
note as condition of any approval.
BOND: Soil Erosion & Sediment Control plan shall be submitted for review & approval by Town
Engineer.
PLANNER STAFF RECOMMENDATION:
Make a MOTION to accept the granting of an extension of time to make a decision and
table Application PZ #22SITE1 to the 4/26/22 Regular Meeting of the Commission.
H:\PZC\Applications\2022\22 SITE 1 - 82 Jerome Rd 3 Multi-Family Dwelling Units\Staff\PLANNER\22SITE1
VillageApts PlannerComments1 021722.doc
TOWN OF MONTVILLE
OFFICE OF THE PLANNING DIRECTOR
310 Norwich-New London Turnpike, Uncasville, CT 06382
Telephone: (860) 848-6779
Email: lburdick@montville-ct.org
MEMORANDUM FOR THE RECORD
February 22, 2022 PZC Meeting
Prepared by Liz Burdick, Planning Director
on 2/17/22
Property Address: 82 Jerome Rd, 15 Jerome Ave, and 232 Norwich-New London
Turnpike (State Route 32)
Application: PZ #22SITE1 for site plan review/approval.
Applicant(s): Village Apartments, LLC
Property Owner(s): Village Apartments, LLC (82 Jerome Rd & 232 Rte. 32) and
Connecticut Multifamily Equities II, LLC (15 Jerome Ave).
Attorney: Harry B. Heller, Esq., Heller, Heller & McCoy
Engineer: Seamus Moran, P.E., Loureiro Engineering Associates
Lot Size: 12.02-acres (523,707SF)
Lot Frontage: 224.9-feet (3 Prop
Zoning District: R-20-M, C-1 and OZ (Rte. 32 Overlay Zone), when all properties
merged.
Public Water/Sewer: Yes.
Wetlands/Watercourses: Yes.
Flood Hazard Zone: Yes. The site is located in FEMA Flood Hazard Zone
AE and “X” per the Flood Insurance Rate Map (FIRM), New London County. Panel 361 of
554, Community Panel Number 09011C0361J, revised to 8/5/2013.
CAM Zone: No.
Public Water Supply Watershed: No.
Proposed Public Improvements: Yes. Including, but not limited to, curb cuts, utility
service extensions and roadway pavement patching.
Legal: Submitted to Planning Dept. on 01/12/22. Date of Receipt by PZC: 1/25/22.
Decision Required Date: 03/30/22.
EXISTING CONDITIONS:
- 82 Jerome Road is currently developed with two multi-family buildings containing
a total of 54 dwelling units - (30) Building 1 & (24) Building 2 and associated outbuildings
(to be demolished) and site improvements.
- 15 Jerome Avenue is an undeveloped lot.
- 232 Route 32 is developed with an existing single-family dwelling & outbuildings
(to be demolished) with an access easement over 220 & 228 Route 32 for pedestrian and
emergency vehicles use only.
PROPOSAL: Expansion of Village Apartments site by construction of three (3) new 3-story
multi-family apartment buildings adding 160 dwelling units. The project includes
demolition of the existing single-family residence, a pump house and various outbuildings
and construction of new retaining walls, parking areas, storm drainage systems with
H:\PZC\Applications\2022\22 SITE 1 - 82 Jerome Rd 3 Multi-Family Dwelling Units\Staff\PLANNER\22SITE1
VillageApts PlannerComments1 021722.doc
underground detention/infiltration structures, a bioretention basin, and the extension of
new electric, cable tv, telephone and water & sewer utilities to the buildings.
INLAND WETLANDS COMMISSION: On 2/18/22, the IWC approved the regulated activities
associated with the project.
UNCAS HEALTH DISTRICT: See comments dated 1/18/22. Add as conditions of any
approval.
STATE OF CT DEPT. OF HEALTH: N/A.
TOWN ENGINEER: See comments dated 02/04/22.
BUILDING DEPT.: Application, plans & supporting documents referred 1/14/22. Comments
pending.
WPCA: See comments dated 01/19/22
STCT DOT: N/A.
OFFICE OF THE STATE TRAFFIC ADMINISTRATION (OSTA): Yes. The plan requires review by
OSTA due to proposed 268 new parking spaces.
STCT DEEP: A General Stormwater Quality Permit is required subsequent to local approval.
Add note as condition of any approval.
BOND: Soil Erosion & Sediment Control plan shall be submitted for review & approval bt
Town Engineer.
STAFF COMMENTS: Please be advised of the following comments with regard to my
review of the application, supporting documents and a plan entitled “Site Development
Plan, Village Apartments – Phase III, New Multi-family Apartment Buildings, 15 Jerome
Avenue, 82 Jerome Road and 232 Route 32, Dated March 11, 2021, Revised November
15, 2021” and supporting documents dated November 15, 2022:
- ZR Sec. 18.3 - The Commission shall approve the Parking Plan dated November
15, 2021.
- ZR 15.2 (Special Flood Hazard Area Requirements). See narrative dated
November 15, 2021 that addresses compliance with this Section.
- Utilities Report dated November 15, 2021 addresses the adequacy of existing
water & sewer service providers to serve the project.
- Sheet 2 survey notes. Revise Note 4 to add “When merged, the subject
properties are located in the Route 32 Overlay Zone (OZ). Revise Note 6 to show address
of properties when merged per the Montville Tax Assessor (i.e. 82 Jerome Road or 15
Jerome Ave or 232 Route 32).
- Sheet 2 site notes. Revise to add note to plan that prior to the start of any work,
the Applicant and its contractors will conduct a pre-construction meeting with relevant
Town of Montville staff.
- Sheet 4 – Show pump house to be removed (concrete pad & fence?).
- ZR Sec. 17.3.1(GIS). The Applicant shall provide digital data for site plans after all
required signatures have been obtained and prior to issuance of a zoning permit to start
work. Condition of any approval.
- Sheet 5 – Revise to show the existing bituminous dumpster area with enclosure.
- ZR Sec.17.4.10 – submit copy of OSTA application for the record.
- ZR Sec. 17.4.14 & 18.14 – Revise plan to show location of all outdoor lighting,
freestanding and building & sign mounted and show details of same.
- ZR 17.4.19 – If the developer proposes to develop in stages, a staging plan is
required.
- ZR 17.4.21 – Revise plan to show signature approval blocks (PZC/IWC), approval
of soil erosion control plan approval date and expiration date n lower right corner of
plan set.
- ZR 17.6 – The Commission shall consider the general objectives in this Section.
- ZR 17.6.10 – Submit SESC bond estimate for review/approval by Town Engineer.
H:\PZC\Applications\2022\22 SITE 1 - 82 Jerome Rd 3 Multi-Family Dwelling Units\Staff\PLANNER\22SITE1
VillageApts PlannerComments1 021722.doc
- ZR 18.10 – Add note to plan regarding property maintenance per this Section.
- Sheet 5 – Revise plan to show any proposed improvements to right of way to Rte.
32 for pedestrian or emergency vehicles.
- ZR 18.16.2 – Consider fencing screening on 15 Jerome Ave. adjacent to existing
residential single-family dwelling.
- Sheet 7 – Construction areas. Consider relocating construction trailers, staging
areas closer to work zone 1.
- As a condition of any approval, a lot line adjustment (merger) plan shall be filed
on the Land Records in the office of the Town Clerk prior to issuance of a zoning permit to
start work.
STAFF RECOMMENDATION: Pending. Please contact me with questions or comments.