Loading...
HomeMy WebLinkAbout120 gay Hill Rd inspection 8-24-10Town of Montville Planning Department Inspection Report Date: 8-24-10 Location: 120 Gay Hill Rd Purpose of Inspection: Ongoing Project Inspected By Wetlands Officer Town Engineer Inspection was made of Phase 1 of the project. Developer has put in the basin closest to the road and started the basin on Dennis Dr. After heavy rains the site was in good shape. The sediment fence has to be replaced in some areas and there was a small blowout at the left corner of the cul-de-sac. In addition the Developer was told that when he was working on the installation of the stone swale below the basin on Dennis Dr. he should use a temporary bridge over the area to avoid any impact to the wetland area. The Town engineer was questioned regarding the installation of the street light at the end of the cul-de-sac because there is an existing light pole across from the road entrance. In addition he was questioned regarding the removal of under drains on one area and the placement of under drains in another. He indicated that he would talk to the Public Works Director.