Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
22SITE8 CAM SitePlan ChangesRed Rec10252022
GRAPHIC SCALERevisionsSHEET NO.Site Operations Plan Prepared forGateway Montville, LLC 125 Depot Rd (M/B/L 071-007-000) - Uncasville, ConnecticutOctober 2022JOB I.D. NO.\\192.168.2.3\PROJECTS\CIVIL 3D PROJECTS\2022\22-3140 GATEWAY TERMINAL\DWG\DESIGN\DEPOT ROAD SITE PLAN PHASE 2 USES.DWG 22-3140DATE:SCALE:7©2022 BOUNDARIES LLCTHIS DRAWING IS THE PROPERTY OF BOUNDARIES LLC AND HAS BEEN SPECIFICALLYPREPARED FOR THE OWNER OF THIS PROJECT, AT THIS SITE, AND IS NOT TO BEDUPLICATED OR USED IN PART OR WHOLE FOR ANY OTHER PURPOSE, PROJECT, LOCATIONOR OWNER WITHOUT THE EXPRESSED WRITTEN CONSENT OF BOUNDARIES LLC."Overall Key Map"21" = 80'DEPOT ROADDOCK ROADTHA M E S R I V E R RAILROAD 133 DEPOT ROAD125 DEPOT ROADPHASE 2 - UNDER CONSTRUCTIONPHASE 3 - CURRENT PROPOSALSHEET 3SHEET 5SHEET 4SHEET 655 DOCK ROADPHASE 1 - UNDERCONSTRUCTIONNORTHSOUTHPROJECT DESCRIPTION:PHASE 1 - UNDER CONSTRUCTIONCONSTRUCT NEW ACCESS DRIVEWAY AND SALT STORAGE PAD ON 131/133DEPOT ROAD. IMPROVE ACCESS TO PIER AND INSTALL CONVEYORS FOROFF-LOADING BARGE. STORMWATER MANAGEMENT IMPROVEMENTSALONG SEA WALL. INSTALL RETAINING WALL AT 55 DOCK ROAD.PHASE 2 - UNDER CONSTRUCTIONGRADING AND STORMWATER MANAGEMENT IMPROVEMENTS TO COLLECTAND TREAT RUNOFF PRIOR TO DISCHARGE TO SUPPORT FUTURE RAILSIDINGS AND INDUSTRIAL USES.PHASE 3 - CURRENT PROPOSALCONSTRUCT CIRCULATION DRIVEWAY ON 125 DEPOT ROAD FOR DELIVERY OFMATERIALS FOR TEMPORARY STORAGE ON-SITE PRIOR TO SHIPPING BYTRUCK, RAIL OR BARGE. ACCEPT DELIVERY AND STORAGE OF MATERIALS INDESIGNATED AREAS.131 DEPOT ROADLEGEND & ABBREVIATIONSBLREFERENCE MAPSSURVEY NOTESNote: See Reference Map 7 for Improvement Location & TopographicSurveys, Phase 1 Site Development Plans, Phase 2 Site Development Plansand Phase 1/2 Construction Notes and Details. (Application #22 SITE 5) Depot RoadTha m e s R i v e rN/FComstock CemeteryN/FComstockCemeteryN/FCentral Vermont(Genesee & WyomingRail Road Services)Tha m e s R i v e rGRAPHIC SCALEMatch Line "A" (See Sheet 4) Match Line "B" (See This Sheet) Match Line "B" (See This Sheet)RevisionsSHEET NO.Site Operations Plan Prepared forGateway Montville, LLC 125 Depot Rd (M/B/L 071-007-000) - Uncasville, ConnecticutOctober 2022JOB I.D. NO.\\192.168.2.3\PROJECTS\CIVIL 3D PROJECTS\2022\22-3140 GATEWAY TERMINAL\DWG\DESIGN\DEPOT ROAD SITE PLAN PHASE 2 USES.DWG 22-3140DATE:SCALE:7©2022 BOUNDARIES LLCTHIS DRAWING IS THE PROPERTY OF BOUNDARIES LLC AND HAS BEEN SPECIFICALLYPREPARED FOR THE OWNER OF THIS PROJECT, AT THIS SITE, AND IS NOT TO BEDUPLICATED OR USED IN PART OR WHOLE FOR ANY OTHER PURPOSE, PROJECT, LOCATIONOR OWNER WITHOUT THE EXPRESSED WRITTEN CONSENT OF BOUNDARIES LLC.1" = 40'"Phase 2A/2B Grading and Stormwater Plan - North"3 Dock RoadTha m e s R i v e rN/FUncasville, LLCVolume 657, Page 1163N/FFrederick H. Perkins& Elenor M. PerkinsVolume 337, Page 241N/FComstock CemeteryN/FCentral Vermont(Genesee & WyomingRail Road Services)Central Vermont(Genesee & WyomingRail Road Services)N/FKurt E. Eichelberg &Sandra J. EichelbergVolume 560, Page 999GRAPHIC SCALEMatch Line "A" (See Sheet 3)RevisionsSHEET NO.Site Operations Plan Prepared forGateway Montville, LLC 125 Depot Rd (M/B/L 071-007-000) - Uncasville, ConnecticutOctober 2022JOB I.D. NO.\\192.168.2.3\PROJECTS\CIVIL 3D PROJECTS\2022\22-3140 GATEWAY TERMINAL\DWG\DESIGN\DEPOT ROAD SITE PLAN PHASE 2 USES.DWG 22-3140DATE:SCALE:7©2022 BOUNDARIES LLCTHIS DRAWING IS THE PROPERTY OF BOUNDARIES LLC AND HAS BEEN SPECIFICALLYPREPARED FOR THE OWNER OF THIS PROJECT, AT THIS SITE, AND IS NOT TO BEDUPLICATED OR USED IN PART OR WHOLE FOR ANY OTHER PURPOSE, PROJECT, LOCATIONOR OWNER WITHOUT THE EXPRESSED WRITTEN CONSENT OF BOUNDARIES LLC.1" = 40'"Phase 2B/2C Grading and Stormwater Plan - South"4Match Line "A" (See Sheet 3)