Loading...
HomeMy WebLinkAboutTE Comments June 1, 2022 Ms. Liz Burdick Town Planner 310 Norwich-New London Tpke, Uncasville, CT 06382 RE: Monahan Drive Resubdivision CLA-7064M Dear Liz: We have reviewed the plans and supporting documents submitted for the proposed resubdivision of land beyond the existing terminus of Monahan Drive. We have the following comments: 1. The as-builts for Monahan Drive differ from the submittal. The drawings of the existing conditions must be updated. 2. The plans must show the work and materials as conforming to CT DOT Form 818 in lieu of the outdated Form 816 noted on the plans. 3. The data for the test holes and monitor wells must be shown on the plans. 4. The direct stormwater discharge shown on Lot 12 must be redesigned to conform to MS-4 requirements. 5. The proposed detention pond is described to be maintained by a home owners association. The existing detention pond on Gay Hill Road is in need of maintenance. Is there an association? 6. Note 23 on the front sheet describes inspection fees; the Phase 2 fee was determined some 13 years ago and must be updated. 7. Note 25 on the front sheet must be updated to present day costs. 8. Snow storage areas at the turnaround must be shown in accordance with present road standards. 9. The calculations for the size and the installation of the cross culvert on Lot 7 must be provided. CLA Engineers, Inc. Civil Structural Survey 317 MAIN STREET NORWICH, CT 06360 (860) 886-1966 (860) 886-9165 FAX 10. The inlet for the drainage on Lot 7 must be revised to a DG endwall or flared end unit in lieu of the C-L type catch basin. 11. The calculations for the sizing of the level spreaders must be provided. 12. The access gate to Swanty Johnson Road must be supported by steel end poles in lieu of timber poles. 13. The details must be updated in accordance with current standards, especially regarding pavement sections. 14. The proposed connection to the existing pavement on Monahan Dr. must be detailed on the plans. 15. The erosion and sediment plans must be detailed for the roadway construction. 16. The driveway details must be added to the plans. 17. The grades within the turnaround on Beacon Road are too flat. 18. Flared end units shall be added to all outlets. 19. Connection of foundation drains and sump pumps must be updated in conformance with 90I of the roadway standards. 20. Street lights exist on the exiting portion of Monahan Drive and must be shown on the proposed extension of the roadway. 21. The proposed grading for pond #3 does not meet current standards. 22. The storm intensity data must be updated in the drainage study. 23. The E&S Control Bond estimate for the roadway work must be submitted for review. 24. The construction bond for the public improvements must be submitted for review. Very truly yours, Thomas L. Cummings, P.E TLC:bab