Loading...
HomeMy WebLinkAboutCert NOD Applicant 072622 \\planning\planningoffice$\PZC\Applications\2022\22 SITE 6 - 14 Enterprise Ln- Site Improvements\Legal\22SITE6 CertNODApplicant 072622.doc Page 1 of 2 Town of Montville PLANNING & ZONING COMMISSION 310 Norwich New London Turnpike, Uncasville, CT 06382 Telephone: (860) 848-6679 – Email: lburdick@montville-ct.org CERTIFICATE OF NOTICE OF DECISION APPLICATION: PZ# 22 SITE 6 – Site Plan Review LOCATION: 14 Enterprise Ln. (M/B/L 002-005-00D), Oakdale, CT REPRESENTATIVE(S): David C. McKay, P.E., Boundaries LLC APPLICANT: Craig Potter, MXI, Inc. OWNER: Potter Realty V, LLC PROJECT: Proposed site improvements to Light Industrial zoned property. COMMISSION ACTION: APPROVE WITH CONDITIONS as follows: Application PZ #22 SITE 6 – 14 Enterprise Drive (MBL 002/005/00D) - Applicant, Craig Potter, MXI, Inc. - Owner, Potter Realty V, LLC for proposed light industrial lot site improvements in accordance with the application, supporting documentation and sheets 1-3 of a plan entitled “Improvement Location & Topographic Survey Existing Conditions, Proposed Improvements for Existing Site, and Notes and Details, 14 Enterprise Lane, Montville (Oakdale), CT, Prepared for Potter Realty V, LLC by Boundaries, LLC, Dated July 2022, Revised to 7/22/2022” with the following conditions: 1. Subject to approval with conditions, if any, by the City of New London Public Utilities prior to issuance of a zoning permit to start work. 2. All drainage structures proposed for the project shall be constructed and maintained post construction in accordance with the approved Plan. 3. An approved zoning permit is required prior to the start of any work. 4. Prior to issuance of a zoning permit to start work, a soil erosion & sediment control bond shall be posted in the amount $6,450 in a form acceptable to the Finance Director. 5. A digital copy of the final plan shall be submitted to the Planning Dept. 6. A separate application shall be submitted for any future site signage not shown on plan. 7. The ZEO must be contacted, a pre-construction meeting shall be held, and soil erosion & sediment controls shall be installed & inspected by the ZEO at least 24- hours prior to start of work. 8. After work has started, any substantive changes to the approved site plan require review and approval by the Planning Director and/or the Planning & Zoning Commission. \\planning\planningoffice$\PZC\Applications\2022\22 SITE 6 - 14 Enterprise Ln- Site Improvements\Legal\22SITE6 CertNODApplicant 072622.doc Page 2 of 2 Each and every condition is an integral part of the Commission decision. Should any of the conditions, on appeal from this decision, be found to be void or of no legal effect then this conditional approval is likewise void. Should any of the conditions not be implemented by the applicant or his successors within the specified permit time period, then this conditional approval is void. The applicant may re-file another application review. ____________________________________ Planning Director Date of Approval: July 26, 2022 Expiration Date: July 26, 2027