Loading...
HomeMy WebLinkAbout22SUB3 DPH Notification1 Demian Sorrentino From:Demian Sorrentino Sent:Thursday, June 9, 2022 11:03 AM To:dph.swpmail@ct.gov Subject:Watershed Area Project Notification Form - Proposed 8-Lot Residential Subdivision Attachments:DPH WATERSHED NOTIFICATION FORM _PRINT.pdf Good Morning‐    Submitted herewith is a completed Watershed Area Project Notification Form for a proposed 8‐Lot subdivision located  at East Lake Road and Fire Street in the Oakdale section of Montville, CT.     Sunmar/RAF Builders, LLC is proposing 8 new residential development lots to be served by individual on‐site wells and  subsurface sewage disposal systems.     A small portion of the subject property is within the designated Public Water Supply Watershed for Lake Konomoc (PWS  ID# CT0950011), operated by the City of New London Department of Public Utilities.     Subsequent to this email, we will forward a letter and hard copy set of Subdivision Plans to Mr. Joseph Lanzafame,  Director of Public Utilities for the City of New London, for his review.     If you have any questions or concerns, please contact the undersigned at your convenience.     Thanks & Regards,     Demian    Demian A. Sorrentino, AICP, C.S.S.  Certified Planner & Soil Scientist  Project Manager  Boundaries, LLC  PO Box 184  Griswold, CT  06351  T: (860) 376‐2006  E: dsorrentino@boundariesllc.net  W: www.boundariesllc.net    Watershed or Aquifer Area Project Notification Form REQUIREMENT: Within seven days of filing, all applicants before a municipal Zoning Commission, Planning and Zoning Commission, Zoning Board of Appeals or Inland Wetlands Commission for any project located within a public water supply aquifer or watershed area are reguired by Public Act No. 06-53 of the CT General Statutes to notify The Commissioner of Public Health and the project area Water Company of the proposed project by providing the following information. To determine if your project falls within a public water supply aquifer or watershed area visit the appropriate town hall and look at their Public Drinking Water Source Protection Areas map. If your project falls completely within or contain any part of a public water supply aquifer or watershed you are required to complete the following information. Note: You will need information obtained from the Public Drinking Water Source Protection Areas map located in the appropriate town hall to complete this form. Step 1: Have you already notified the CT Department of Public Health (CTDPH) of this project? No, Go to Step 2 Yes, I have notified DPH under a different project name - Complete steps 4-6 Yes, same name different year - Notification Year Complete steps 4-6 Step 2: 1. Name of public water supply aquifer your project lies within: 2. Name of the public water supply watershed your project lies within: 3. Public Water Supply Identification number (PWSID) for the water utility: CT Step 3: For 1-5 Check all that apply 1. My project is proposing: Industrial use; Commercial use; Agricultural use; Residential use; Recreational use; Transportation improvements; Institutional (school, hospital, nursing home, etc.); Quarry/Mining; Zone Change, Please Describe: Other, Please describe: 2. The total acreage of my project is: Less than or equal to 5 acres Greater than 5 acres 3. My project site contains, abuts or is within 50 feet of a: Wetland; Stream; River; Pond or Lake 4 New London Dept. of Public Utilities 0950011 4 4 4 4. Existing use of my project site is: Grassland/meadow; Forested; Agricultural; Transportation; Institutional (school, hospital, nursing home, etc.);Residential; Commercial; Industrial; Recreational;Quarry/Mining Other Please Describe: 5. My project will utilize: septic system; existing public sewer; new public sewer; agricultural waste facility; existing private well; new private well; existing public water supply; new public water supply, if new have you applied for a certificate of public convenience and necessity from DPH? Yes No 6. My project will contain this percentage of built up area (buildings, parking, road/driveway, pool): Less than or equal to 20% Greater than 20% to 50%Greater than 50% Step: 4 Applicants Contact Information: Name: E-mail address: Telephone: Fax number: Step 5: Please provide the following if available: Project name: Project site address: Town: Project site nearest intersection: Project site latitude and longitude: 4 4 4 4 Sunmar/RAF Builders, LLC sundae.franklin@gmail.com (860) 608-0995 Subdivision Prepared for Sunmar/RAF Builders East Lake Road & Fire Street Montville East Lake Road & Fire Street 41.25.40N : 70.10.23W E-mail completed form to dph.swpmail@ct.gov