8-24 Cost Est Rev 08192022
Rev: 8/19/2022 CLA-6314I/7187 Item Qty.Unit Unit Price Estimate 1 Maintenance & Protection of Traffic 1 L.S. $7,500.00 $7,500.00 2 Erosion & Sedimentation Control 1 L.S. $15,000.00 $15,000.00 3 Tree Clearing & Grubbing 1 L.S. $5,000.00 $5,000.00 4 Dewatering, Control & Diversion of Water 1 L.S. $50,000.00 $50,000.00 5 General Excavation 200 C.Y. $10.00 $2,000.00 6 Gravel Fill 20 C.Y. $50.00 $1,000.00 7 Processed Gravel Base 100 C.Y. $55.00 $5,500.00 8 Two Course Bituminous Concrete Pavement 100 Ton $110.00 $11,000.00 9 Concrete Block Retaining Wall 500 S.F. $50.00 $25,000.00 10 Remove & Dispose of Wood Piles 18 Ea. $750.00 $13,500.00 11 Precast Concrete Boat Ramp 2,000 S.F. $40.00 $80,000.00 12 Fixed Concrete Abutment/Pier Reconstruction 75 C.Y. $1,200.00 $90,000.00 13 Wood Floating Docks 325 S.F. $60.00 $19,500.00 14 Wood Piles 4 Ea. $2,500.00 $10,000.00 15 ADA Accessible Gangway/Ramp 1 L.S. $15,000.00 $15,000.00 16 Topsoil, Seed, Fertilizer, and Mulch 350 S.Y. $10.00 $3,500.00 $353,500.00 15% $53,025.00 406,525.00$ 7.0% $28,456.75 6.0% $24,391.50 15.0% $60,978.75 $520,352.00 $525,000.00 Item Qty.Unit Unit Price Estimate 1 Maintenance & Protection of Traffic 1 L.S. $3,500.00 $3,500.00 2 Erosion & Sedimentation Control 1 L.S. $5,000.00 $5,000.00 3 Construction Staging / Water Access / Barge 2 Month $25,000.00 $50,000.00 4 Wood Piles 38 Ea. $2,500.00 $95,000.00 5 Timber Access Walkway 125 L.F. $400.00 $50,000.00 6 Timber Fishing Platform 3,200 S.F. $65.00 $208,000.00 7 Timber Benches & Signage 1 L.S. $12,500.00 $12,500.00 8 General Excavation 400 C.Y. $10.00 $4,000.00 9 Gravel Fill 20 C.Y. $50.00 $1,000.00 10 Processed Gravel Base 300 C.Y. $55.00 $16,500.00 11 Rolled Gravel Driveway 10 C.Y. $55.00 $550.00 12 Two Course Bituminous Concrete Pavement 350 Ton $110.00 $38,500.00 13 Concrete Curb 100 L.F. $25.00 $2,500.00 14 Concrete Sidewalk & Pads 1,700 S.F. $15.00 $25,500.00 15 Solar Site Lighting 5 Ea. $9,000.00 $45,000.00 16 Water Quality Basin 1,250 S.F. $10.00 $12,500.00 17 Topsoil, Seed, Fertilizer, and Mulch 350 S.Y. $10.00 $3,500.00 18 Site Features (Benches, Trash Cans, Etc.) 1 L.S. $5,000.00 $5,000.00 $578,550.00 15% $86,782.50 665,332.50$ 4.0% $26,613.30 8.0% $53,226.60 6.0% $39,919.95 15.0% $99,799.88 $884,892.23 $885,000.00 Total Estimate : Say : Construction Subtotal : Engineering / Permitting / Bid Services : Construction Administration / Inspection : Contingency : Phase 2: Fishing Pier Subtotal : Contractor Mobilization & General Conditions : Assumes construction will be wood piles, timber frame, wood decking, and rails Geotechnical Investigation (Borings) : Fishing Pier Site Work Total Estimate : Say : Engineering / Permitting / Bid Services : Construction Subtotal : Construction Administration / Inspection : Contingency : Subtotal : Contractor Mobilization & General Conditions : Engineer's Opinion of Probable Construction Costs TOWN OF MONTVILLE TOWN BOAT LAUNCH IMPROVEMENTS Phase 1: Boat Launch Improvements