Loading...
HomeMy WebLinkAboutSite Plan -Butlertown Road Reconstruction211.95 ' 44 0 PAINTED I !'11 A K A r-% 240 238 236 234 232 230 228 226 224 222 220 218 216 214 212 210 208 2.68 R=88 R=30 213.42 /po �—APPROXIMATE /--.RIGHT OF WAY RjUrl - I " a fra 10kA PAVEMENT (TYP.) (SEE DETAIL) PR4�VID 16" RCP RIPRAP OUTLET (1 9,w -'/ 19,11- PROVIDE MODIFIED RIPRAP OUTLET THERE ARE NO WETLANDS WITHIN 110 FT OF THIS OUTLET AS SHOWN ON REFERENCE MAP o+bo 9+00 Misc. Revisions Per &T C. Comment Route 161-R.O.W. Shown Misc. Revisions Per Std. Comment Misc. Revisions Misc. Revisions Pqr Town Comments Misc, Revisions I Revision r"s, In o. CIVIL STRUOTURAL PURVEYING 317 Main.: Street Norwich, Connecticut (860) 886-1 P66 Fax (860) 486-91 rz5 .Lombardi. l3psiness Park Project No. -CLA-3187 Pf0j. Engineer r% outleftown Road E.M.B. Reconstruction Sheet No. Butlertown koad: PI ;n & Profile. A0% Iff it M B