HomeMy WebLinkAboutSite Plan -Butlertown Road Reconstruction211.95 ' 44
0
PAINTED
I !'11 A K A r-%
240
238
236
234
232
230
228
226
224
222
220
218
216
214
212
210
208
2.68
R=88
R=30
213.42
/po
�—APPROXIMATE
/--.RIGHT OF WAY
RjUrl - I " a fra 10kA
PAVEMENT (TYP.)
(SEE DETAIL)
PR4�VID 16" RCP
RIPRAP OUTLET
(1 9,w -'/ 19,11- PROVIDE MODIFIED
RIPRAP OUTLET
THERE ARE NO WETLANDS
WITHIN 110 FT OF THIS
OUTLET AS SHOWN ON
REFERENCE MAP
o+bo
9+00
Misc. Revisions Per &T C. Comment
Route 161-R.O.W. Shown
Misc. Revisions Per Std. Comment
Misc. Revisions
Misc. Revisions Pqr Town Comments
Misc, Revisions
I
Revision
r"s, In o.
CIVIL STRUOTURAL PURVEYING
317 Main.: Street Norwich, Connecticut
(860) 886-1 P66 Fax (860) 486-91 rz5
.Lombardi. l3psiness Park
Project No.
-CLA-3187
Pf0j. Engineer
r%
outleftown Road
E.M.B.
Reconstruction
Sheet No.
Butlertown koad: PI ;n & Profile.
A0%
Iff it
M B