HomeMy WebLinkAbout22SITE5 Applicant Repsonse Ltr 07112022
John U. Faulise, Jr., L.S. Demian A. Sorrentino, AICP, C.S.S. David C. McKay, P.E.
Gerald J. Stefon, L.S. (1952-2021) Jacob S. Faulise,
E.I.T.
Boundaries LLC
179 Pachaug River Drive
P.O. Box 184
Griswold, CT 06351
T 860.376.2006 | F 860.376.5899
www.boundariesllc.net
TRANSMITTAL
July 11, 2022
To: Ms. Liz Burdick
Town Planner
310 Norwich-New London Turnpike
Uncasville, CT 06382
RE: Comment Response
Application: 22 SITE 5
Location: 125 Depot Rd (M/B/L 071-007-000) & 133 Depot Rd (M/B/L 071-001-000), Depot Rd
(M/B/L 071-013-000) and 55 Dock Rd (M/B/L 071-008-000), Uncasville, CT
Applicant: Gateway Montville, LLC
Boundaries LLC Job I.D. No. 22-3140
Dear Ms. Burdick;
We have prepared the following responses to CLA Engineers, Inc. plan review letter received July 7,
2022. Please see below for a summary of the comments received and our responses.
The means and methods of fueling the loaders must be shown and/or noted on the plans.
o The construction period fueling practices noted on Sheet 20 of the Site
Development/Operations Plan are intended to also be implemented during the
operations of the facility post construction. Fuel shall be delivered to the site by a third-
party fuel delivery service. Fueling operations shall occur at the material staging/storage
areas and spill cleanup kits shall be maintained on site. Fuel is not intended to be stored
at the site.
The Erosion Control and Site Restoration Bond amount is satisfactory in the amount of $187,500
for the site.
o Comment is acknowledged.
Page 2
If you have any questions regarding this correspondence or the attached documents, please contact me
at your convenience.
Sincerely,
David C. McKay, P.E. John U. Faulise Jr., L.S.
Boundaries LLC Boundaries LLC