Loading...
HomeMy WebLinkAboutProposed Addition°�;, SITE L OCA TION OXOi/OXO LAKE 114;V-LlL:L3 006-130 0 008-007 Ix- (y) r' N � 0 M Ci O 00 r- tY) Z NOTE: LOCATION OF OUTLET PIPE FROM HOUSE TO TANK AND SEPTIC TANK MAY CHANGE SLIGHTLY DUE TO SHALLOW LEDGE IN AREA 155'+1- I \ , 1 RIP -RAP OUTLET"��, I 490 4" FTG AND ROOF LEADER OUTLET 480 \ � ......:..::: 470 \ \ :::::::::::::: NEW 4" SCH. 40 PIPE FROM 01 -001 - �` '�I`�., Q \ \ \ \ \ HOUSE TO TANK - MIN. SLOPE \ \ 01 2 r I _ \ \ \ \ = 1/4 PER LINEAL FT. \ r PROPOSED CLEANOUT -, O \ \ PROPOSED 1250 GALLON SEPTIC TANK AT TOP OF SLOPE - DEPTH '......,....? \ \ \ (USE LOW BOY SEPTIC TANK)\ AND LOCATION MAY VARY L O CA TION MAP , \ \ FLOWLINE INTO TANK = 477.50 \ \ DUE TO DEPTH OF LEDGE I NO SCALE\ \ \ ELEVAFLOWTIONS MAY VERY DUE T0OUT OF TANK = 5 \ i \ \ DEPTH OF LEDGE � pl`l ,�� � ,t 460 \ \ \ \ \ \ \ \ \ 1} & X55 '0 \ \ �t� • A• 2� 1 \ \ \ \ \ 73'+/- 1 Z \ \ \ PROPOSED 45' OF 18" MANTIS \ \ \ \ `\ BOTTOM TRENCH ELEV. = 470.20 \ \ \ \ \ I , ' Sol,\ \ \ FLOWLINE ELEV. = 471.20 P PROJECT BENCHMARK - TRA V. POINT SPIKE IN GROUND - ASSUMED ELEV. = 458.35 - TO BE D \ \ \ TRANSFERRED TO SYSTEM AREA AT TIME OF \ \ \ \ lot STAKEOUT \ \ \ \ TP 4 ' ' ! 25.45' N69057'53"EV_ o ,moo N cr � No j O m 2�G• LEGEND W O P d' co \ \ \ \ \ \ \ 471x2 '� \ \ \ \ \ \ \ \ TP 3 \ 4" SDR 35 PIPE A „ , !� \ DRYWEL SPER SKETCH i STING C3 TCH RECORDI \ \ o \ „ 1 PT , t IN THE UNCAS HEALTH DEPT. - IF TIME OF FOUNDATION EXCAVATIO Lo , Q V DRYWELLS ARE RECOVERED - THI Imo TP 5t ARE TO BE PUMPED AND BROKEN , �mPT2 � , UP IN PLACE 1 1\ \ \ D, 11 1 \ \ ` \ \ k40 471x2 \ 54 1 1 TP 2 \ , \ \ \ 4i W \ \ \ \ 1 1 \ ` 458 1 \ \ \ 484 ` LtnIff_ ttI =tit _ 1 Erf _ rrl�ttni�rrt X ZJITVm fmm t1I3Tmi11fIRE tBAt0.t�7f 7ACOIf IAt1:'T FENCM &_ 70 T1tfi ?iR�m15L TNIIiExCAYATFD . Lane OO _ Ittllft_ _ r M Taf t osT�7N m SYNT EM RLT�t FASM PROPOSED NEWADDITION - SLAB TO K MATCH SLAB OF EXISTING BASEMENT O O M EXISTING 1250 GAL.SEPTIC TANK Z TO BE PUMPED AND REMOVED m FROM PROPOSED ADDITION AREA - 478 \\ ` \ \ \ \ CL&P 12183 N1 \ \ 490 \ \ \ \ \ \ \ \ \ \ 1 474 \ 480 \ \ \ \ \ \ \ \ \ \ \ \ \ 468 \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ 1 \ \ \ \ \ \ \ 464 \ \ \ 448 \ \ \ \470 450 \ \ >460 ,t 444 EXISTING CONTOURS \\ \ \ \ \ \ \ 50o PROPOSED CONTOURS , \ e � 47ox2 EXISTING SPOT GRADES 4 1 SIL TFENCE BARRIER \ O POWER UTILITY POLES Ar PERC TESTS MAP REFERENCES �` O e► TEST PITS • BOUNDARY ANGLE POINTS O IRON PINS RECOVERED T a R E D s T E R P 1, T T H t v E L A Y E R HYDRAULIC FACTOR (HF) HYDRAULIC GRADIENT (% OF SLOPE) 2 • Sizing charts do not reflect MISS requirements • Mutnple trench configurations will utilize 12' center -to -center spacing between Manns rows g MANTIS S36-8 PLAN VIEW 4 1.1• 2.1- 3.1- 4.1- 6.1- 8.1- 111.1- Single Family Multi-FVAly <t 2 3 4 6 B 10 is a15 <17A SEE NOTE S1 Units Length Units' Length Length * Effective Leaching Area ........... 11.0 sf/If 18-22 72 62 54 48 42 34 30 28 26 221 - 2$ ss 56 48 42 34 30 28 26 3a 56 0 42 34 30 28 26 241 20 30.1- 36 48 42 34 30 28 26 24 20 18 36.1 - 42 42 35 30 20 26 24 20 16 16 ' 42.7- 48 33 32 28 26 24 Zfl 18 18 14 48.1- 50 30 28 24 22 ZO 78 16 14 10 > 600 ULSS NEED NOT BE CONSMWD At -CANNOT BE APPROVED UNLESS K"MUG ANALYM DENONSTRATEs surrM&" SUBDIVISION PLAN MADE FOR JOHN D. YWARSKY- OXOBOXO DAM ROAD - MONTVILLE, 00 CONNECTICUT - SCALE 1 " = 50'- JULY 1982 - BY CHANDLER, PALMER & KING V �l REVISION TO SUBDIVISION PLAN MADE FOR JOHN D. YWARSKY- OXOBOXO DAM ROAD - IS MONTVILLE CONNECTICUT - SCALE 1" = 50'- JULY 1982 - REVISED THRU NOV. 1997 NY •( -fie CHANDLER, FALMER & KING N S 51E� NGV NIF E BASIS OF SANITARY DESIGN BEDROOM HOUSE - 10•0 Min/ln PERC RATE SQ. FT. OF LEACHING AREA REQUIRED USE ROW OF 18" MANTIS WIDE @ LENGTHS SHOWN SQ. FT. OF LEACHING AREA PROVIDED USE 1250 GALLON SEPTIC TANK. HF x FF 1-t x PF = MLSS PERC TEST DATA PERC TEST No. 1 DATE 3 /2/19 DEPTH 22" NAIL DOWN 2" PRESOAK @ 8:53 1:01 - 0" 1:11 - 5 1/8" 1:21 - 8 1/4" 1:31 - 9 3/4" 1:41 - 11 1/8" 1:51 - 12 1/4" 2:01 - 13 1/4" 2:11 - 14 1/4" PERC RATE 10, 0 MIN / IN NEW TOPSOIL LAYER 5' CLEAN FILL MIN. TOPSOIL LAYER � PERC TEST No. 2 DATE 3 /2/19 DEPTH 23" NAIL DOWN 2" PRESOAK @ 8:58 1:13 - 0" 1.23 - 5 5/8" 1:33 - 8 3/4" 1:43 - 101/8" 1:53 - 11518" 2:03 - 13" 2:13 - 14 1/8" 2:23 - 151/4" PERC RATE 8.88 MIN / IN C TL3lD T/lOC/'1!I ! AVCO TI.10 /'1! f/•�L TtJlG� RCCA 5' SELECT FILL MIN. I 4' , 5' SELECT FILL MIN. l jenIS F- lusive Mantis Design Provides IncreSurface Treatment Area in Less Space O� �R four installation requires more performance in less space, _,len Mantis Wastewater Leaching System delivers. i he unique design of the Mantis System 151 ,`�CjG provides a two-stage Bio -Matt' pre-treatment process that increases antis YrJJ�_ the soil's ability to accept the effluent, Wastewater systemsTM resulting in a superior leaching system in a smaller footprint. MANTIS 536-8 SIMPLIFIED SIZING CHART Gravity and Pressure Dosed Systems 9, Effective Leaching Area =11.0 Square Feet/Linear Foot Partial units are rounded up to the next hghest number. 2 • Sizing charts do not reflect MISS requirements • Mutnple trench configurations will utilize 12' center -to -center spacing between Manns rows g MANTIS S36-8 PLAN VIEW 4 60. 3' 4.5` Each Bedroom Above Four 80.0-100-0 CLEAN BACKFILL 9'M N Bedrooms Bedrooms Bedrooms Single Family Multi-FVAly 1 e4 >t Percolation Trench #100 Trench < 10.0 Trench Trench Trench < 5.0 Trench Rate Length Units Length Units' Length Length * Effective Leaching Area ........... 11.0 sf/If Len Units` Less Than 34 7 46 9 61 12 10 2 15 3 10.1 „ .1-20-0 45 9 66 13 86 17 15 25 5 20.1 51 11 71 t4 96 19 t5 3 25 5 30.1-45.0 61 13 86 17 ill 22 3 30 6 45.0-%0 14 91 18 121 15 3 30 1 6 Greater Than 600 UITABLE FOR LEACHING SYSTEMS Partial units are rounded up to the next hghest number. 9.5 mm • Sizing charts do not reflect MISS requirements • Mutnple trench configurations will utilize 12' center -to -center spacing between Manns rows MANTIS 536-8 CROSS SECTION MANTIS S36-8 PLAN VIEW VEt TATNECOVM 60. 3' 4.5` roma � 80.0-100-0 CLEAN BACKFILL 9'M N 1.18 mm 50.0-85.0 #30 w' 7 -f 1 e4 >t 300 Nm WITHHOLM #100 150 prn < 10.0 SPMF1®SkW t* t < 5.0 McM/NN ASSOCIATES LAND DEVELOPMENT CONSULTANTS, SURVEYORS, MAP MAKERS. ALL RIGHTS RESERVED, UNAUTHORIZED DUPLICATION OR MODIFICATION ISA VIOLA TION OF APPLICABLE LAWS 11PAUL STOWELL REGISTERED LAND SURVEYOR - L.S. LIC. No. 70216 OWN MARKREY OLDS REGISTERED PROFESSIONAL ENGINEER P.E. LIC. No. 19789 MANTIS 536-8 SPECIFICATIONS * Effective Leaching Area ........... 11.0 sf/If + SizeWXLXH)............. 35'x6Tx18'' CORPORATION e Invert Height .. , . , .. , ........ 12 kmovetere,Elwk umntal Products and soka renis sena► 19701 3 Weight.... , ..3,5 Pounds 125 McKee Street, East Hartford, CT 06108 JOB No- 19-002 800-444-1359 - 860-610-0426 - Fax: 860-610-0427 Email: info@eljen.com , Website: eijen.com Specified Sand Requirements To ensure proper system operation, Eljen Corporation requires all of its Mantis Systems to be installed using an ASTM C33 sand with less than 10% passing a #100 sieve, and less than 5% passing a #200 sieve. Reference the Eljen Mantis Design and Installation Manual for your state for the proper amount of specified sand required for installation. Installers should request a sieve analysis from their material supplier to ensure that the specified sand that they are purchasing for use during installation of the Eljen Mantis system meets the specified sand requirements listed below. 0.375" 9.5 mm 100.0 #4 4.75 mm 95.0-100-00 #8 2.36 mm 80.0-100-0 #16 1.18 mm 50.0-85.0 #30 600 Nm 25.0-60.0 #50 300 Nm 5.0-30-0 #100 150 prn < 10.0 #200 75 prn < 5.0 DEEP TEST PIT DATA TEST PIT No. 1 0-6" TOPSOIL 6-34" LOAMY SUBSOIL 34-64" GRAY SAND WITH SILT MOTTLING @ 34" - WATER @ 48" - NO LEDGE ROOTS @ 36" - RESTRICTIVE 34" TEST PIT No. 2 0-7" TOPSOIL 7-30" LOAMY SUBSOIL 30-53" GRAY SAND WITH SILT MOTTLING @ 30" - WATER @ 40" - REFUSAL @ 53" ROOTS @ 33" - RESTRICTIVE 30" SOILS TESTING TAKEN ON MARCH 1, 2019 AND WITNESSED BY MICHAEL J. KIRBY R. S. 18" MIN. RESTRICT/VE LAYER TRENCH SECTION B -B TRENCHES TO BE INSTALLED NO DEEPER THAN 12" INTO ORIGINAL GRADE TEST PIT No. 3 0-8" TOPSOIL 8-32" LOAMY SUBSOIL 32-74" GRAY SAND WITH SILT WOTTLING @ 32" - WATER @ 52" - NO LEDGE ROOTS @ 36" - RESTRICTIVE 32" TEST PIT No. 4 0-8" TOPSOIL 8-30" LOAMY SUBSOIL 30-60" GRAY SAND WITH SILT 110 MOTTLING - WATER @ 30" - REFUSAL @ 60" ROOTS @ 30" - RESTRICTIVE 30" TEST PIT No. 5 0-6" TOPSOIL 6-50" LOAMY SUBSOIL NO MOTTLING - WATER @ 30" - LEDGE @ 50" ROOTS @ 30" - RESTRICTIVE 30" 'Vj� \ s�. F L 472 Al �60 70 470 �es�ccc'�cc ��35 F 468 /GENERAL NOTES Y AND R ERVE AREAS ARE TO BE PROTECTED FROM COMPACTION MAGE BY MACHINERY AND EQUIPMENT DURING CONSTRUCTION. )NAL TE T PITS MAY BE REQUIRED TO CONFIRM SOIL CONDITIONS IN THE AREA PRIMA Y AND RESERVE LEACHINF FIELDS. PITS ARE TO BE DUG PRIOR TO THE �F CO STRUCTION OF THE SEPTIC SYSTEM AND ARE TO BE STAKED IN THE FIELD INEE TO ENSURE PROPER LOCATION. �UT N BOXES TO BE INSTALLED TO CREATE A HIGH LEVEL OVERFLOW (4" MIN) STEM SHALL CONFORM TO THE CURRENT STATE OF CONNECTICUT PUBLIC CODE. CONDITIONS ( MOTTLING, LEDGE OR GROUNDWATER) ARE ENCOUNTERED -LOWER DEPTH THAN THOSE SHOWN IN THE DEEP TEST HOLE RESULTS, THE ER SHALL BE CONTACTEDIMMEDIATELY AND CONSTRUCTION HALTED UNTIL _-R DIRECTED. TIGHT PIPE FROM TANK TO D. BOX AND BETWEEN D. BOXES. JRS TAKEN FROM ON SITE FIELD TOPOGRAPHY AND ARE TO T-2 STANDARDS. REQUIRED FILL SPECIFICATIONS kCHING PRODUCTS WITH EFFECTIVE LEACHING CREDITS OF 7.4 SF/LF AND HIGHER qOT BE UTILIZED WHERE THE UNDERLYING NATURALLY OCURRING SOILS HAVE IUM PERCOLATION RATE SLOWER THAN THIRTY (30) MINUTES PER INCH. FILL MATERIAL AND SELECT BACKFILL MATERIAL, PLACED WITHIN AND ADJACENT (POSED LEACHING AREAS SHALL BE COMPOSED OF CLEAN SAND AND GRAVEL, ROM ORGANIC MATTER AND FOREIGN SUBSTANCES. THE FILL AND MATERIAL AEET THE FOLLOWING REQUIREMENTS UNLESS OTHERWISE APPROVED BY ESSIONAL ENGINEER FOR USE WITHIN THE LEACHING AREA. FILL SHALL NOT CONTAIN ANY MATERIAL LARGER THAN THREE ) 3) INCHES- -0 45% OF THE DRY WEIGHT OF THE REPRESENTATIVE SAMPLE MAY BE RETAINED #4 SIEVE ( THIS IS THE GRAVEL PORTION OF THE SAMPLE )_ MATERIAL THAT PASSES THE #4 SIEEVE IS THEN REWEIGHED AN THE SIEVE ;IS STARTED. MAINING SAMPLE SHALL MEET THE FOLLOWING GRADATION CRITERIA: _VE SIZE PERCENT PASSING PERCENT PASSING #4 100% 100% #10 70%-100% 70%-100% #40 10%-50% 10%-75% #100 0%-20% 0%-5% #200 0%-5% 0%-2.5% WET SIEVE TEST SPONSIBILITY FOR THE PREPARATION OF A LEACHING AREA UTILIZING SELECT IAL IS THAT OF THE LICENSED INSTALLER. THE INSTALLER SHALL TAKE THE SARY STEPS TO PROTECT THE UNDERLYING NATURALLY OCURRING SOILS FROM OMPA CTION AND SILTATION ONCE EXPOSED. ATER TREATMENT DEVICES NOT TO DISCHARGE INTO SEPTIC SYSTEM. CONSTRUCTION NOTES NO CHANGE IN PLAN LOCATION OR ELEVATION SHALL BE MADE WITHOUT NOTIFYIING THE ENGINEER AND THE PROPER TOWN AUTHORITY. THE ENGINEER SHALL BE NOTIFIED PRIOR TO CONSTRUCTION TO SET LOCATION AND GRADE STAKES FOR THE SUBSURFACE SEWAGE DISPOSAL SYSTEM TO INCLUDE: FILL MATERIAL, SEPTIC TANK, PRIMARY LEACH SYSTEM. SIMILAR STAKING REQUIRED FOR ALL CURTAIN AND FOUNDATION DRAINS AND WELL. NO SOIL STRIPPING OR EXCAVATION SHALL BEGIN WITHIN THE AREA OF THE SUB -SURFACE SEWAGE DISPOSAL SYSTEM WITHOUT A VALID CONSTRUCTION PERMIT. A LICENSED SEWAGE DISPOSAL SYSTEM INSTALLER SHALL OBTAIN A CONSTRUCTION PERMIT AND ARRANGE FOR THE SITE INSPECTION PRIOR TO CONSTRUCTION. THE SYSTEM SHALL BE INSTALLED IN ACCORDANCE WITH THIS PLAN AND ALL APPLICABLE STATE, AND LOCAL RULES, REGULATIONS AND CODES. TOPSOIL TO BE STRIPPED AND STOCKPILED PRIOR TO ANY FILLING. SCARIFY AREA BEFORE FILLING. NO VEHICLE TRAFFIC BY RUBBER TIRE VEHICLES TO MINIMIZE COMPACTION. PLACE FILL AT EDGE OF PREPARED AREA AND SPREAD WITH BULLDOZER IN 6" LIFTS AND COMPACT TO 90% MAXIMUM DENSITY. SANITARIAN TO INSPECT ANY FILL OVER 24" DEEP PRIOR TO CONSTRUCTION. TRENCH BOTTOMS SHALL BE LEVEL AND SET TO FOLLOW CONTOURS OF EXISTING GRADE. NO CONSTRUCTION BELOW ORIGINAL GRADE IN THE LEACHING SYSTEM AREA SHALL TAKE PLACE WITHIN 48 HOURS OF A RAINSTORM OR WITH STANDING PUDDLES. ALL FOOTING DRAINS, CURTAIN DRAINS AND SUBSURFACE SEWAGE DISPOSAL SYSTEM COMPONENTS SHALL BE INSPECTED BY THE TOWN AND LOCATED "AS -BUILT" BY THE ENGINEER/LAND SURVEYOR PRIOR TO COVERING. INSPECTION SHALL BE WITHIN 2 WORKING DAYS FOLLOWING TIMELY NOTIFICATION BY THE CONTRACTOR TO PROTECT OPEN WORK FROM SILTATION AND EROSION. ALL DISTURBED AREAS SHALL BE GRADED, LOAMED , AND SEEDED AS SOON AS POSSIBLE AFTER CONSTRUCTION. IF SEEDING CANNOT TAKE PLACE DURING THE GROWING SEASON, A TEMPORARY MULCH COVER SHALL BE PLACED AND MAINTAINED UNTIL PERMANENTCOVER CAN BE ESTABLISHED. A LICENSED WELL DRILLER SHALL OBTAIN A PERMIT PRIOR TO ANY DRILLING. THE WELL SHALL BE PROVIDED IN ACCORDANCE WITH THIS PLAN AND ALL APPLICABLE STATE AND LOCAL REGULATIONS AND CODES. SATISFACTORY COMPLETION OF ALL THE ABOVE REQUIREMENTS SHALL PRECEED THE FINAL INSPECTION AND APPROVAL OF THE SUBSURFACE SEWAGE DISPOSAL SYSTEM AND WELL. EROSION CONTROL NOTES GENERAL REQUIREMENTS FOR EROSION CONTROL: SEEDING, SODDING, OR REVEGETATION PLANS AND SPECIFICATIONS FOR ALL UNPROTECTED OR UNVEGETATED AREAS SHALL BE IMPLEMENTED AS SOON AS POSSIBLE. EXCAVATIONS , FILLS AND GRADING : NOTE: CONTOURS TAKEN FROM ON SITE FIELD TOPOGRAPHY CUT AND FILL SLOPES SHALL NOT BE STEEPER THAN 3:1 UNLESS STABILIZED BY A RETAINING WALL OR CRIBBING, EXCEPT AS APPROVED BY THE COMMISSION UNDER UNDER SPECIAL CONDITIONS. ADEQUATE PROVISIONS SHALL BE MADE TO PREVENT SURFACE WATER FROM DAMAGING THE CUT FACE OF EXCAVATION OR THE SLOPING SURFACES OF FILLS. CUT AND FILLS SHALL NOT ENDANGER ADJOINING PROPERTY. FILL SHALL BE PLACED AND COMPACTED SO AS TO MINIMIZE SLIDING OR EROSION OF THE SOIL. GRADING SHALL NOT BE DONE IN SUCH A WAY SO AS TO DIVERT WATER ONTO THE PROPERTY OF ANOTHER LANDOWNER WITHOUT THE EXPRESSED CONSENT OF THAT LANDOWNER AND THE COMMISSION. / FILLS SHALL NOT ENCROACH ON THE NATURAL WATERCOURSES OR CONSTRUCTED CHANNELS. DURING GRADING OPERATIONS, NECESSARY MEASURES FOR DUST CONTROL SHALL BE EXERCIZED. GRADING EQUIPMENT WILL NOT BE ALLOWED TO CROSS LIVE STREAM EXCEPT BY MEANS OF BRIDGES AND CULVERTS OR OTHER METHODS AS APPROVED BY THE COMMISSION. / IMPLEMENTATION PROCEDURES: WHEREVER FEASIBLE, NATURAL VEGETATION SHOULD BE RETAINED AND PROTECTED. / ONLY THE SMALLEST PRACTICAL AREA OF LAND SHOULD BE EXPOSED AT ANY ONE TIME DURING DEVELOPMENT. / WHEN LAND IS EXPOSED DURING DEVELOPMENT, THE EXPOSURE SHOULD BE KEPT TO THE SHORTEST PRACTICAL PERIOD OF TIME/ WHERE NECESSARY, TEMPORARY VEGETATION AND/OR MULCHING SHOULD BE USED TO PROTECT AREAS EXPOSED DURING DEVELOPMENT. THE PERMANENT FINAL VEGETATION AND STRUCTURES SHOULD BE INSTALLED AS SOON AS PRACTICAL IN THE DEVELOPMENT. NO DECLARATION IS EXPRESSED OR IMPLIED UNLESS THIS PLAN BEARS THE IMPRESSION (EMBOSSED) SEAL OF THE PROFESSIONAL WHERE SIGNATURE APPEARS HEREON. COPYRIGHT 2019 TO MY KNOWLEDGE AND BELIEF, THIS MAP IS SUBSTANTIALLY CORRECT AS NOTED HEREON. McMINN ASSOCIATES LAND USE CONSULTANTS PAUL STOWELL REG. LAND SURVEYOR 171 WILCOX ROAD Z0 w PROPOSED HOUSE ADDITION & PROPOSED RELOCATED SEPTIC SYSTEM PROPERTY OF & PREPARED FOR SHEET 1 OF 1 McM/NN ASSOCIATES LAND DEVELOPMENT CONSULTANTS, SURVEYORS, MAP MAKERS. ALL RIGHTS RESERVED, UNAUTHORIZED DUPLICATION OR MODIFICATION ISA VIOLA TION OF APPLICABLE LAWS 11PAUL STOWELL REGISTERED LAND SURVEYOR - L.S. LIC. No. 70216 MARKREY OLDS REGISTERED PROFESSIONAL ENGINEER P.E. LIC. No. 19789 MILFORD, CONNECTICUT ( 860 ) 682-0163 - ( 860) 537-0046 DAVID WARZECHA 339 OXOBOXO DAM ROAD - MONTVILLE CONNECTICUT DATE MARCH 10, 2019 - SCALE 1" - 20' No. DATE DESCRIPTION JOB No- 19-002 Traverse PC