Loading...
HomeMy WebLinkAboutArch and CivilGeoffrey C. Williams Verified by pdfFiller 01/24/2022 Geoffrey C. Williams Verified by pdfFiller 01/24/2022 Geoffrey C. Williams Verified by pdfFiller 01/24/2022 Geoffrey C. Williams Verified by pdfFiller 01/24/2022 Geoffrey C. Williams Verified by pdfFiller 01/24/2022 Geoffrey C. Williams Verified by pdfFiller 01/24/2022 Geoffrey C. Williams Verified by pdfFiller 01/24/2022 245 NORWICH-NEW LONDON ROAD (RT 32 MONTVILLE, CONNECTICUT PREPARED FOR:WESTERN GROUP, LLC FE22-1700 KEVIN M. CROWLEY R.L.S. # 70261 TO MY KNOWLEDGE AND BELIEF, THIS MAP IS SUBSTANTIALLY CORRECT TO THE STANDARDS OF CLASS "A2" AS NOTED HEREON. THIS MAP IS NOT VALID UNLESS IT HAS A LIVE SIGNATURE AND EMBOSSED SEAL OF KEVIN M. CROWLEY.Imp Loc Plan -245 Rt 32 - FE22-1700.dwgO:\Fuller CAD Files\CT\Montville\Rte 32\#245 Route 32 - FE22-1700 - Eanou\DWG\Site\1/25/2022 11:08 AMZONING IMPROVEMENT LOCATION & TOPOGRAPHIC PLAN SCALE 1" = 10' 7 JANUARY 2022 VICINITY MAP 525 JOHN STREET BRIDGEPORT, CT. PH.203-333-9465 EMAIL:INFO@FULLERSURVEYORS.COM SITE 1.THIS SURVEY AND MAP HAS BEEN PREPARED IN ACCORDANCE WITH SECTIONS 20-300B-1 THRU 20-300B-20 OF THE REGULATIONS OF CONNECTICUT STATE AGENCIES - "STANDARDS FOR SURVEYS AND MAPS IN THE STATE OF CONNECTICUT" AS ENDORSED BY THE CONNECTICUT ASSOCIATION OF LAND SURVEYORS, INC. AND ADOPTED ON SEPT. 26, 1996. 2.THE TYPE OF SURVEY PERFORMED WITH RESPECT TO THE BOUNDARY PERIMETER IS IMPROVEMENT LOCATION MAP. 3.THE BOUNDARY DETERMINATION CATEGORY IS DEPENDENT RESURVEY. 4.WITH RESPECT TO HORIZONTAL ACCURACY, THIS MAP CONFORMS TO AN ACCURACY CLASS A-2. 5.WITH RESPECT TO VERTICAL ACCURACY, THIS MAP CONFORMS TO AN ACCURACY CLASS T-D. 6.UTILITY, STRUCTURES, AND FACILITY LOCATIONS DEPICTED AND NOTED HEREON HAVE BEEN COMPILED, IN-PART, BY FIELD LOCATIONS OF OBSERVABLE STRUCTURES AND PAINTED MARKINGS. THE ACTUAL LOCATION AND SIZE OF UNDERGROUND UTILITIES SHOWN HEREON MAY NOT BE INDICATED. ADDITIONAL UNDERGROUND UTILITIES MAY EXIST. PRIOR TO EXCAVATION OR CONSTRUCTION, CONTACT "CALL BEFORE YOU DIG", (800) 922-4455. 7.OWNER OF RECORD: WESTERN GROUP LLC, RECORDED IN VOLUME 672, PAGE 82 IN THE TOWN OF MONTVILLE TOWN CLERK'S OFFICE. 8.PARCEL IS LOCATED IN THE C-1 ZONE ON MAP 070, BLOCK 010, LOT 000. 9.TOTAL SITE AREA 1.87 ACRES. 10.THIS SITE IS NOT WITHIN A FEMA FLOOD HAZARD ZONE. 11.ALL DECLARATIONS ARE VALID FOR THE MAP AND COPIES THERE OF ONLY IF THEY BEAR THE EMBOSSED SEAL OF THE SURVEYOR WHOSE SIGNATURE APPEARS HEREON. UNAUTHORIZED ALTERATIONS OR ADDITIONS TO THIS SURVEY RENDER ANY DECLARATION SHOWN HEREON NULL AND VOID. NOTES:MAP REFERENCES: A."LOCATION MAP, NOTES, & A2 SURVEY, COMMERCIAL / RESIDENTIAL COMPLEX NORWICH-NEW LONDON ROAD (CT ROUTE 32) MONTVILLE, CONNECTICUT, PREPARED FOR TOMASHE, LLC, 19 TUSA COURT MONMOUTH JUNCTION, NJ 08852", DATED SEPTEMBER 19, 2014, REVISED THROUGH 3/17/15, SCALE: 1" = 20', BY DENNIS A. JEROME J. DEMPSEY, L.S. ON FILE AS MAP 2519 IN THE TOWN OF MONTVILLE LAND RECORDS. 4 5 45 5 0 5 0 5 5 55 606065657 0 707575 4 2 4 2 4 2 4 3 4 3 4 4 44 4 6 46 4 7 47 4 8 4 8 4 9 4 9 5 1 515 2 52 5 3 5 3 54 5 4 5656 5 757585859596161626263636464666667676868696971717272737374747676 4 55055 6 0657075 4 4 4 6 474849515253545 6 5 7 5 8 5 9 6 1 6 2 6 3 6 466676869717273747 677 S69° 36' 08"E 372.03' S 2 2 ° 3 5 ' 2 2 " E 2 1 4 . 5 0 ' N74° 06' 41"W 332.13'N74° 06' 41"W 179.29'N17° 56' 34"E197.30'I.P. FND RWC FND MON FND MON FND I.P. FND70.08'I.P. FND MON FND EXTG. HOUSENORWICH-NEW LONDONROAD (CT ROUTE 32)EXTG. HOUSE EXTG. GARAGE EXTG. HOUSE Extg. 12" Water Main (92 PSI Static) Extg. 6" San Sewer 9.2' Deep (El. 67.8±) Extg. 6" San Sewer 9.0' Deep (El. 68.0) Extg. 1" Water to House Extg. Hydrant Approximate Wetlands Limit per DEP Wetlands 2011 50' Upland Review Area SNET 2749 BIT.CONC. APRON 255 ROUTE 32 N/F ST FELIX SERGINO VOL. 662, PG. 1118 29 MAPLE AVE EXT N/F STEPHEN KENN VOL. 633, PG. 387 25 LATHROP ROAD N/F NORMAN EDWARD BUTTON & GRACE ANN BUTTON VOL. 114, PG. 18 231 ROUTE 32 N/F CHARLES & BENNY HOLZSCHLAG VOL. 590, PG. 123 PARCEL AREA 79,607 S.F. 1.83 AC WOODED AREA 48" TREE EXISTING TREEL INE R2 0 Z ON E R20 ZONE C-1 ZONE C - 1 ZON E R 2 0 Z O N E C - 1 Z O N E 15' Side Yard Setback 15' Side Yard Setback30' Front Yard Setback3 0 ' R e a r Y a r d S e t b a c k VIR G I N I A COU R T BONVILLE DR.MAP L E JEROMEAVENUE ROADROAD JEROME AVE. STARR 163 Uncasville ROA D NEW LONDON TPK (RT 32)PINK CR E S CENTST.BLUMENTHAL DR. DEPOT RD. DEPOT R OW MA P L E AV E . EXT .ROADDOCK GAIRCOURTEDWARD RD. HARRISON BREWER ST. ST. POWER HOUSE ROAD 1.THIS PLAN IS FOR THE PROPOSED CONDOMINIUM BUILDINGS WITH PARKING CONSTRUCTION, AND MISCELLANEOUS LANDSCAPING ALONG 125-131 MAIN STREET, NORWALK, CT. THIS PLAN IS NOT TO BE USED AS A SITE OR CONSTRUCTION PLAN. ADDITIONAL DESIGN AND DETAILS REQUIRED FOR BIDDING AND CONSTRUCTION. 2.LOCATION OF EXISTING OUT STRUCTURES, AND TOPOGRAPHY WERE OBTAINED FROM A SURVEY TITLED "ZONING MAP OF PROPERTY PREPARED FOR WEST MAIN GROUP, LLC, 125 - 131 MAIN STREET, NORWALK, CT.", DATED JANUARY 23, 2019, SCALE: 1" = 20', BY DENNIS A. DEILUS - LAND SURVEYOR." 3.THE CONTRACTOR IS SOLELY RESPONSIBLE FOR THE MEANS, METHODS AND SEQUENCES OF CONSTRUCTION AND FOR THE SAFETY OF WORKERS AND OTHERS ON THE CONSTRUCTION SITE. 4.THE CONTRACTOR SHALL LOCATE AND VERIFY THE SIZE, LOCATION, DEPTH AND INVERTS OF ANY AND ALL EXISTING UTILITIES PRIOR TO COMMENCING OPERATIONS. THE CONTRACTOR SHALL ALSO BE REQUIRED TO CONTACT THE TOLL FREE "CALL-BEFORE-YOU-DIG" PHONE NUMBER AT 1-800-922-4455. 5.THE PROPOSED DEVELOPMENT SHOWN HEREON WILL REQUIRE REVIEW AND APPROVAL BY THE NORWALK BUILDING DEPARTMENT. 6.RESTORE ALL DISTURBED AREAS WITH A MINIMUM OF FOUR (4") INCHES OF TOPSOIL, SEED, AND HAY MULCH UPON COMPLETION OF CONSTRUCTION. 7.LOT SERVED BY TOWN SEWER SYSTEM AND PUBLIC WATER SUPPLY. 8.SUBJECT PROPERTY IS NOT WITHIN THE FEMA FLOOD HAZARD. SEE FEMA FLOOD INSURANCE RATE MAP #09001C0393G REVISED DATE OF OCTOBER 16, 2013. 9.EXISTING UNDERGROUND UTILITY LOCATION TAKEN FROM REFERENCE MAP A. NOTES: MAP REFERENCES: A."ZONING IMPROVEMENT LOCATION AND TOPOGRAPHIC SURVEY", DATED 7 JANUARY 2022, SCALE 1"=20', BY FULLER ENGINEERING AND LAND SURVEYING, LLC. B."LOCATION MAP, NOTES, & A2 SURVEY, COMMERCIAL / RESIDENTIAL COMPLEX NORWICH-NEW LONDON ROAD (CT ROUTE 32) MONTVILLE, CONNECTICUT", DATED SEPTEMBER 19, 2014, REVISED THROUGH 3/17/15, SCALE: 1" = 20', BY DENNIS A. JEROME J. DEMPSEY, L.S. C-2.1 Job Number: Job Start Date: Checked By: Sheet Title: Drawn By: Sheet Number: Scale: 1/4/22 FE22-1700 THIS DRAWING IS THE PROPERTY OF THE ENGINEER. IT HAS BEEN SPECIFICALLY PREPARED FOR THE OWNER FOR THIS PROJECT AT THIS SITE AND IS NOT TO BE USED FOR ANY OTHER PURPOSE, LOCATION OR OWNER WITHOUT WRITTEN CONSENT OF THE ENGINEER.PREPARED FOR245 NORWICH-NEW LONDON ROAD (RT 32)22 UNIT CONDOMINIUM DEVELOPMENTD.R.R.J.E.Q.WESTERN GROUP, LLCSubmission 01/25/22 525 JOHN STREET BRIDGEPORT, CT. 06604 Office (203) 333-9465 fax (203) 336-1769 e-mail Info@FullerSurveyors MONTVILLE, CONNECTICUTAPPROVED BY THE MONTVILLE PLANNING AND ZONING COMMISSION CHAIRMAN DATE WILTON'S WAY1/25/2022 11:13 AMA CONN DOT # SIZES (IN)SUPPORTS 30"131-0552 CONN DOT # SIZES (IN)SUPPORTS SIGN LEGEND B CONN DOT # SIZES (IN)SUPPORTS 1 CONN DOT # SIZES (IN)SUPPORTS 18"x12''NORWICH-NEW LONDONROAD (CT ROUTE 32)EXTG. HOUSE >>>>>>>>>>>>3 0 ' R E AR B U I L D I NG SE TB A CK CONC. BLOC, WALL w/STOCKADE FENCE 94.4'9' (Typ)10.5' (Typ)12.5' (Typ) 10.5' (Typ)13.5' (Typ) LIMIT OF CLEARING 23.0' STOCKADE FENCE CONC. BLOC, WALL w/STOCKADE FENCE 15' SIDE BUILDING SETBACK 8'x12' CONC. PATIO (TYP) 8'x12' CONC. PATIO (TYP)16.4'15.4'15.5'15.3'15.3'24.0'24.0'24.0'24.0'24.0'24.0'24.0'24.0'24.0'24.0'24.0'24.0'24.2'42.0'22.9'23.0'23.0'23.1'23.0'23.0'23.0'18' (Typ)18' (Typ)24' (Typ)40.1'42.9'42.9'30.5' 66.9' 75.2' 18' (Typ)24' (Typ)30' FRONT BUILDING SETBACK15' SIDE BUILDING SETBAC K 11 MODULAR PAVER APRON (TYP) APRON TO BE REMOVED - INSTALL DEPRESSED CURB ALONG GUTTERLINE EXTG GARAGE TO BE REMOVED BIT. CONC. CURB (TYP) MODULAR CONC. BLOC, WALL w/STOCKADE FENCE 1213141516171819202122 10 98765432 10'x15' REFUSE AREA ON CONC. PAD WITH STOCKADE FENCE AND GATES GUARD RAIL 4' HT DECORATIVE STONE MASONRY WALL PROPOSED STOPSIGN AND 12" WHITE PAINTED STOP BAR RELOCATE JCT 168 SIGN PER DOT DISTRICT 2 SAW-CUT PVMT AND REMOVE CURBING PER D.O.T. PERMIT PLANTING AREA (TYP) PLANTING AREA (TYP) LOW WALL (TYP AT STEPPED UNIT INTERFACES) 5' W CONC. ENTRANCE PAD (TYP) (2) GUEST SPOTS TO REMAIN SUBSURFACE INFILTRATION SYSTEM BIT. CONC. PAVEMENT (TYP)SUBSURFACE INFILTRATION SYSTEM 4' HT DECORATIVE STONE MASONRY WALL EXTG. TREE TO BE REMOVED (6) GUEST SPACES18' (Typ) 2 CAR GARAGE 2 CAR GARAGE 2 CAR GARAGE 2 CAR GARAGE 2 CAR GARAGE 2 CAR GARAGE 2 CAR GARAGE 2 CAR GARAGE 2 CAR GARAGE 2 CAR GARAGE 2 CAR GARAGE 2 CAR GARAGE 2 CAR GARAGE 2 CAR GARAGE 2 CAR GARAGE 2 CAR GARAGE 2 CAR GARAGE 2 CAR GARAGE 2 CAR GARAGE 2 CAR GARAGE 2 CAR GARAGE PROPOSED 1 CAR GARAGE 240 S.F. NO PARKING PROPOSED CONDOMINIUM UNITS 7,809 S.F. TOTAL PROPOSED CONDOMINIUM UNITS 13,388 S.F. TOTAL MAIL BOXES 1,290 S.F. S69° 36' 08"E372.03' S22° 35' 2 2 " E 214.50' N74° 06' 41"W332.13'N74° 06' 41"W179.29'N17° 56' 34"E 197.30 ' I.P. FND RWC FND MON FND MON FND 70.08'I.P. FND MON FND(510 ' REQ'D SEMI'S)ISD SIGHT LINE 870' (30 MPH)(510 ' REQ'D SEMI'S)ISD SIGHT LINE 1,150' (30 MPH) Job Number: Job Start Date: Checked By: Sheet Title: Drawn By: Sheet Number: Scale: 1/4/22 FE22-1700 THIS DRAWING IS THE PROPERTY OF THE ENGINEER. IT HAS BEEN SPECIFICALLY PREPARED FOR THE OWNER FOR THIS PROJECT AT THIS SITE AND IS NOT TO BE USED FOR ANY OTHER PURPOSE, LOCATION OR OWNER WITHOUT WRITTEN CONSENT OF THE ENGINEER.PREPARED FOR245 NORWICH-NEW LONDON ROAD (RT 32)22 UNIT CONDOMINIUM DEVELOPMENTD.R.R.J.E.Q.WESTERN GROUP, LLCSubmission 01/25/22 525 JOHN STREET BRIDGEPORT, CT. 06604 Office (203) 333-9465 fax (203) 336-1769 e-mail Info@FullerSurveyors MONTVILLE, CONNECTICUTAPPROVED BY THE MONTVILLE PLANNING AND ZONING COMMISSION CHAIRMAN DATE WILTON'S WAYO:\Fuller CAD Files\CT\Bridgeport\Benson Terrace\#26 - FE13-1101 - Fox\Survey Data\2013 09 10 FE 13-1100 FOX 26BENSON TERR\LOCATION.crd1/25/2022 11:22 AMNOTES: 1.THIS PLAN IS FOR THE PROPOSED GRADING AND DRAINAGE FOR THE CONSTRUCTION OF A RESIDENTIAL DEVELOPMENT WITH PARKING, AND MISCELLANEOUS LANDSCAPING ALONG THE CT ROUTE 32. THIS PLAN IS NOT TO BE USED AS A SITE OR CONSTRUCTION PLAN. ADDITIONAL DESIGN AND DETAILS REQUIRED FOR BIDDING AND CONSTRUCTION. 2.THE CONTRACTOR IS SOLELY RESPONSIBLE FOR THE MEANS, METHODS AND SEQUENCES OF CONSTRUCTION AND FOR THE SAFETY OF WORKERS AND OTHERS ON THE CONSTRUCTION SITE. 3.THE CONTRACTOR SHALL LOCATE AND VERIFY THE SIZE, LOCATION, DEPTH AND INVERTS OF ANY AND ALL EXISTING UTILITIES PRIOR TO COMMENCING OPERATIONS. THE CONTRACTOR SHALL ALSO BE REQUIRED TO CONTACT THE TOLL FREE "CALL-BEFORE-YOU-DIG" PHONE NUMBER AT 1-800-922-4455. 4.THE PROPOSED DEVELOPMENT SHOWN HEREON WILL REQUIRE REVIEW AND APPROVAL BY THE MONTVILLE BUILDING DEPARTMENT. 5.ALL WORK PERFORMED BY THE OWNER / DEVELOPER MUST INCLUDE IMPLEMENTATION OF AN APPROVED SOIL EROSION AND SEDIMENTATION PLAN IN ACCORDANCE WITH PUBLIC ACT No. 83-388 [PASSED BY THE CONNECTICUT GENERAL ASSEMBLY]. THE OWNER / DEVELOPER SHALL BE THOROUGHLY FAMILIAR WITH THE CONNECTICUT GUIDELINES FOR EROSION AND SEDIMENT CONTROL PUBLISHED BY THE CONNECTICUT COUNCIL OF SOIL AND WATER CONSERVATION, JANUARY 1985. 6.RESTORE ALL DISTURBED AREAS WITH A MINIMUM OF FOUR (4") INCHES OF TOPSOIL, SEED, AND HAY MULCH UPON COMPLETION OF CONSTRUCTION. 7.LOT SERVED BY TOWN SEWER SYSTEM AND PUBLIC WATER SUPPLY. 8.ALL EXISTING UTILITY LINES THAT WILL BE DISCONNECTED MUST BE CAPPED OR TERMINATED ACCORDING TO THE TOWN OF MONTVILLE AND UTILITY COMPANY STANDARDS. TEST PIT AND PERCOLATION DATA MAP REFERENCES: A."ZONING IMPROVEMENT LOCATION AND TOPOGRAPHIC SURVEY", DATED 7 JANUARY 2022, SCALE 1"=20', BY FULLER ENGINEERING AND LAND SURVEYING, LLC. B."LOCATION MAP, NOTES, & A2 SURVEY, COMMERCIAL / RESIDENTIAL COMPLEX NORWICH-NEW LONDON ROAD (CT ROUTE 32) MONTVILLE, CONNECTICUT", DATED SEPTEMBER 19, 2014, REVISED THROUGH 3/17/15, SCALE: 1" = 20', BY DENNIS A. JEROME J. DEMPSEY, L.S. EARTHWORK A.TOTAL AREA OF DISTURBANCE: 66,340 S.F. (1.5 A.C.±) 4 5 45 5 0 5 0 5 5 55 606065657 0 707575 4 2 4 2 4 2 4 3 4 3 4 4 44 4 6 46 4 7 47 4 8 4 8 4 9 4 9 5 1 515 2 52 5 3 5 3 54 5 4 5 6 5 6 57575 85859596161626263636464666667676868696971717272737374747676 4 5505 5 6 0657075 4 4 4647 4 849515253545 6 5 7 5 8 5 9 6 1 6 2 6 3 6 466676869717273747 677I.P. FND RWC FND MON FND MON FND 70.08'I.P. FND MON FND EXTG. HOUSENORWICH-NEW LONDONROAD (CT ROUTE 32)EXTG. HOUSE EXTG. GARAGE EXTG. HOUSE Extg. 12" Water Main (92 PSI Static) Extg. 6" San Sewer 9.2' Deep (El. 67.8±) Extg. 6" San Sewer 9.0' Deep (El. 68.0) Extg. 1" Water to House Extg. Hydrant Approximate Wetlands Limit per DEP Wetlands 2011 50' Upland Review Area SNET 2749 BIT.CONC. APRON PARCEL AREA 79,607 S.F. 1.83 AC WOODED AREA 48" TREE EXIST ING TREEL INE R 2 0 ZO N E R20 ZONE C-1 ZONE C- 1 ZON E C - 1 Z O N E 15' Side Yard Setback 15' Side Yard Setback30' Front Yard Setback3 0 ' R e a r Y a r d S e t b a c k 111213141516171819202122 10 98765432 TO REMAIN GAR. F.F. El. = 72.6 GAR. F.F. El. = 72.6 GAR. F.F. El. = 70.6 GAR. F.F. El. = 70.6 GAR. F.F. El. = 68.6 GAR. F.F. El. = 68.6 GAR. F.F. El. = 66.6 GAR. F.F. El. = 66.6 Bsmt. El. = 70.2FF. El. = 73.6 Bsmt. El. = 65.4 FF. El. = 73.6 Bsmt. El. = 62.6FF. El. = 71.6 Bsmt. El. = 66.0FF. El. = 71.6 Bsmt. El. = 60.6FF. El. = 69.6 Bsmt. El. = 63.9FF. El. = 69.6 Bsmt. El. = 58.6 FF. El. = 67.6 Bsmt. El. = 58.8FF. El. = 67.6 GAR. F.F. El. = 73.1 Bsmt. El. = 65.1 FF. El. = 74.1 GAR. F.F. El. = 71.1 Bsmt. El. = 63.1 FF. El. = 72.1 GAR. F.F. El. = 71.1 Bsmt. El. = 63.1FF. El. = 72.1 GAR. F.F. El. = 69.1 Bsmt. El. = 61.1FF. El. = 70.1 GAR. F.F. El. = 69.1 Bsmt. El. = 61.1FF. El. = 70.1 GAR. F.F. El. = 67.1 Bsmt. El. = 59.1FF. El. = 68.1 GAR. F.F. El. = 67.1 Bsmt. El. = 59.1FF. El. = 68.1 GAR. F.F. El. = 65.1 Bsmt. El. = 57.1FF. El. = 66.1 GAR. F.F. El. = 65.1 Bsmt. El. = 57.1FF. El. = 66.1 GAR. F.F. El. = 73.1 Bsmt. El. = 65.1 FF. El. = 74.1 GAR. F.F. El. = 75.1 Bsmt. El. = 67.1 FF. El. = 76.1 GAR. F.F. El. = 75.1 Bsmt. El. = 67.1FF. El. = 76.1 GAR. F.F. El. = 76.1 Bsmt. El. = 68.1FF. El. = 77.1 CB3 T.F.=70.6 CB4 T.F.=66.9 CB5 T.F.=63.6 CB2 T.F.=74.6 97 LF 8" Ø SCH 80 PVC @0.01 MIN 90 LF 10" Ø SCH 80 PVC @0.01 ft./ft. MIN 84 LF 10" Ø SCH 80 PVC @0.03 ft/ft CB1 T.F.=74.4 47 LF 8" Ø SCH 80 PVC @ 0.01 M IN INV. = 51.75'± 32 - 4 x 8 x 4' PRE-CAST CONCRETE GALLEY'S 4 ROWS x 8 GALLEYS PER ROW BOT. ELEV. = 58.83' 12" INV. ELEV. = 63.67' EMBEDDED IN 1" BROKEN / CLEAN STONE 66.0' x 18.60' x 5.17' DEEP BOT. STONE ELEV. = 58.33' 28 - 4 x 8 x 4' PRE-CAST CONCRETE GALLEY'S 4 ROWS x 7 GALLEYS PER ROW BOT. ELEV. = 63.67' 10" INV. (IN) = 68.65' 12" INV. OUT = 68.50' EMBEDDED IN 1" BROKEN / CLEAN STONE 58.0' x 18.60' x 5.17' DEEP BOT. STONE ELEV. = 63.17' 96 LF 12" Ø RCP @ 0.08 slope BOT. ELEV. (GALLEYS) = 63.67' CB3 TF = 70.60' 10" RCP INV. = 68.60' (7 LF @ 0.005 ft/ft) CB2 TF = 74.60' 8" PVC INV. = 69.60' (97 LF @ 0.01 ft/ft) CB1 TF = 74.40' 8" PVC INV. = 70.07' (47 LF @ 0.01 ft/ft) CB4 TF = 66.90' 10" RCP INV. = 63.83' (16 LF @ 0.01 ft/ft to GALLEYS) 16 LF 10" R C P CB5 TF = 63.60' 10" PVC INV. = 61.15' 10" RCP (OUT) = 60.91' (12 LF @ 0.02 ft/ft to GALLEYS) 12 LF 10" RCP STORM MH (DROP MH) TF = 64.50' 12" RCP INV. (IN) = 61.16' 12" RCP INV. (OUT) = 52.00' 12"Ø RCP FLARED END INV. = 51.75' W W W W W W WWETC ETC ETC W W W W W W W W W W W W W W W W W W W W W W W W W FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM Cut/Fill Summary Name Earthwork Totals Cut Factor 1.000 Fill Factor 1.000 2d Area 66340.66 Sq. Ft. 66340.66 Sq. Ft. Cut 3325.99 Cu. Yd. 3325.99 Cu. Yd. Fill 3645.68 Cu. Yd. 3645.68 Cu. Yd. Net 319.69 Cu. Yd.<Fill> 319.69 Cu. Yd.<Fill>O:\Fuller CAD Files\CT\Montville\Rte 32\#245 Route 32 - FE22-1700 - Eanou\DWG\Site\C 3.1 - DRAINAGE.dwg, 1/25/2022 11:22:19 AM, DWG To PDF.pc3 Job Number: Job Start Date: Checked By: Sheet Title: Drawn By: Sheet Number: Scale: 1/4/22 FE22-1700 THIS DRAWING IS THE PROPERTY OF THE ENGINEER. IT HAS BEEN SPECIFICALLY PREPARED FOR THE OWNER FOR THIS PROJECT AT THIS SITE AND IS NOT TO BE USED FOR ANY OTHER PURPOSE, LOCATION OR OWNER WITHOUT WRITTEN CONSENT OF THE ENGINEER.PREPARED FOR245 NORWICH-NEW LONDON ROAD (RT 32)22 UNIT CONDOMINIUM DEVELOPMENTD.R.R.J.E.Q.WESTERN GROUP, LLCSubmission 01/25/22 525 JOHN STREET BRIDGEPORT, CT. 06604 Office (203) 333-9465 fax (203) 336-1769 e-mail Info@FullerSurveyors MONTVILLE, CONNECTICUTAPPROVED BY THE MONTVILLE PLANNING AND ZONING COMMISSION CHAIRMAN DATE WILTON'S WAYO:\Fuller CAD Files\CT\Bridgeport\Benson Terrace\#26 - FE13-1101 - Fox\Survey Data\2013 09 10 FE 13-1100 FOX 26BENSON TERR\LOCATION.crd1/25/2022 11:13 AMNOTES: 1.THIS PLAN IS FOR THE PROPOSED UTILITIES OF THE PROPOSED RESIDENTIAL DEVELOPMENT WITH PARKING CONSTRUCTION, AND MISCELLANEOUS LANDSCAPING. THIS PLAN IS NOT TO BE USED AS A SITE OR CONSTRUCTION PLAN. ADDITIONAL DESIGN AND DETAILS REQUIRED FOR BIDDING AND CONSTRUCTION. 2.THE CONTRACTOR IS SOLELY RESPONSIBLE FOR THE MEANS, METHODS AND SEQUENCES OF CONSTRUCTION AND FOR THE SAFETY OF WORKERS AND OTHERS ON THE CONSTRUCTION SITE. 3.THE CONTRACTOR SHALL LOCATE AND VERIFY THE SIZE, LOCATION, DEPTH AND INVERTS OF ANY AND ALL EXISTING UTILITIES PRIOR TO COMMENCING OPERATIONS. THE CONTRACTOR SHALL ALSO BE REQUIRED TO CONTACT THE TOLL FREE "CALL-BEFORE-YOU-DIG" PHONE NUMBER AT 1-800-922-4455. 4.THE PROPOSED DEVELOPMENT SHOWN HEREON WILL REQUIRE REVIEW AND APPROVAL BY THE LOCAL BUILDING DEPARTMENT. 5.ALL WORK PERFORMED BY THE OWNER / DEVELOPER MUST INCLUDE IMPLEMENTATION OF AN APPROVED SOIL EROSION AND SEDIMENTATION PLAN IN ACCORDANCE WITH PUBLIC ACT No. 83-388 [PASSED BY THE CONNECTICUT GENERAL ASSEMBLY]. THE OWNER / DEVELOPER SHALL BE THOROUGHLY FAMILIAR WITH THE CONNECTICUT GUIDELINES FOR EROSION AND SEDIMENT CONTROL PUBLISHED BY THE CONNECTICUT COUNCIL OF SOIL AND WATER CONSERVATION, JANUARY 1985. 6.RESTORE ALL DISTURBED AREAS WITH A MINIMUM OF FOUR (4") INCHES OF TOPSOIL, SEED, AND HAY MULCH UPON COMPLETION OF CONSTRUCTION. 7.LOT SERVED BY TOWN SEWER SYSTEM AND PUBLIC WATER SUPPLY. APPLICATION WILL BE MADE TO THE WATER POLLUTION CONTROL AUTHORITY FOR A PERMIT TO CONSTRUCT AND CONNECT WATER AND SEWER LINES TO THE MONTVILLE SEWER SYSTEM. 8.EXISTING UNDERGROUND UTILITY LOCATION TAKEN FROM MAPS PROVIDED BY UTILITY COMPANY AND SEWER DEPARTMENT, PRIOR SURVEYS, AND FIELD MARKINGS. 9.ALL EXISTING UTILITY LINES THAT WILL BE DISCONNECTED MUST BE CAPPED OR TERMINATED ACCORDING TO THE CITY OF NORWALK AND UTILITY COMPANY STANDARDS. 10.IF REQUIRED, ALL EXISTING SANITARY SEWER LINES SHALL BE CAPPED WITHIN 2 FEET OF THE EXISTING SEWER MAIN. 11.ALL ROOF LEADERS SHALL BE PIPED AND CONNECTED TO THE SUBSURFACE DRAINAGE SYSTEM. PIPE ROUTING AND GUTTER CONNECTIONS SHALL BE DETERMINED BY CONTRACTOR. 12.ALL UNITS ARE DESIGNED TO HAVE SANITARY CONNECTIONS IN EACH BASEMENT AND WILL PUMP UP TO THE MAIN LATERAL AT THE FRONT OF THE BUILDINGS. SANITARY LIFT SYSTEMS ARE REQUIRED TO FACILITATE ALL SEWAGE DISCHARGE TO THE TOWN SEWER SYSTEM IN THE STREET. 13.ALL WORK SHALL COMPLY WITH THE FOLLOWING TOWN STANDARDS: 13.1.TOWN OF MONTVILLE SEWER USE REULES AND REGULATIONS. 13.2.TOWN OF MONTVILLE SANITARY SEWER MATERIALS AND CONSTRUCTION STANDARDS. 13.3.TOWN OF MONTVILLE SPECIFICATIONS OF WATER MAINS AND APPURTENANCES. 14.SEWER PIPE TO BE PLASTIC PVC-SDR35. 15.WATER LINES TO BE TYPE K COPPER TUBING. MAP REFERENCES: A."ZONING IMPROVEMENT LOCATION AND TOPOGRAPHIC SURVEY", DATED 7 JANUARY 2022, SCALE 1"=20', BY FULLER ENGINEERING AND LAND SURVEYING, LLC. B."LOCATION MAP, NOTES, & A2 SURVEY, COMMERCIAL / RESIDENTIAL COMPLEX NORWICH-NEW LONDON ROAD (CT ROUTE 32) MONTVILLE, CONNECTICUT", DATED SEPTEMBER 19, 2014, REVISED THROUGH 3/17/15, SCALE: 1" = 20', BY DENNIS A. JEROME J. DEMPSEY, L.S. EXTG. HOUSENORWICH-NEW LONDONROAD (CT ROUTE 32)EXTG. HOUSE Extg. 12" Water Main (92 PSI Static) Extg. 6" San Sewer 9.2' Deep (El. 67.8±) Extg. 6" San Sewer 9.0' Deep (El. 68.0) Extg. 1" Water to House Extg. Hydrant Approximate Wetlands Limit per DEP Wetlands 2011 50' Upland Review Area SNET 2749 BIT.CONC. APRON R 2 0 ZO N E R20 ZONE C-1 ZONE C- 1 ZON E C - 1 Z O N E 111213141516171819202122 10 98765432 TO REMAIN W W W W W W PROPOSED WATER UTILITY GATE VALVE AND SERVICE LINE FINAL LOCATION BY UTILITY COMPANY WWNEW 12"x2" TAP w/2" VALVE New 2" Wate r L i n e N e w 2 " W a t e r L i n e NEW SAN MH INV IN / OUT = 68.3 Rim=72.63 Inv=69.63 SAN MH / LIFT STATION 2" FO R C E M A I N Inv In= 59.9 Sewer Inv=65.9 Sewer Inv=65.4 Sewer Inv=65.0 Sewer Inv=64.6 Sewer Inv=64.9 Sewer Inv=63.6 Sewer Inv=63.2Sewer Inv=66.3Sewer Inv=66.7Sewer Inv=67.2 Sewer Inv=62.8 Sewer Inv=62.3 Sewer Inv=61.9 8' D.I. SAN @0.05 MIN. RIM=65.3 SAN MH / LIFT STATION AS MFG. BY eONE GRINDER PUMP SYSTEMS - MODEL WH483 or WR483 - SEE DETAIL ON SHEET C-6.3 Inv In= 62.8 Sewer Inv=67.2 Sewer Inv=66.6 Sewer Inv=66.0 Sewer Inv=65.4 Sewer Inv=64.8 Sewer Inv=64.2 Sewer Inv=63.6 Sewer Inv=64.4 6' PVC SDR35 @0.01 MIN ETC ETC ETC PROPOSED ETC SERVICE DROP ELECTRIC METER BANK ELECTRIC METER BANK PROPOSED E,T,C SERVICE DROP W W W W W W W W W W W W W W W W W W W W W W W W W FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM6' PVC SDR35 @0.01 MIN RIM=64.9 Inv In= 61.9 Inv = 67.1 Inv = 67.1 Inv = 62.9 RIM=76.4 6" PVC SDR35 SANITARY 6" PVC SDR35 SANITARY INV = 68.2 EXTG. SANITARY LINE TO REMAIN EXTG. SAN LINE TO REMAIN 34" K SERVICE AND VALVE (TYP) 2" FORCE MAIN FROM EACH UNIT (TYP) 2" FORCE MAIN FROM EACH UNIT (TYP) 34" K SERVICE AND VALVE (TYP) 2" FORCE MAIN SAN MH / LIFT STATION AS MFG. BY eONE GRINDER PUMP SYSTEMS - MODEL WH483 or WR483 - SEE DETAIL ON SHEET C-6.3 O:\Fuller CAD Files\CT\Montville\Rte 32\#245 Route 32 - FE22-1700 - Eanou\DWG\Site\C 3.2 - UTILITY.dwg, 1/25/2022 11:13:23 AM, DWG To PDF.pc3 NOTES: MAP REFERENCES: Job Number: Job Start Date: Checked By: Sheet Title: Drawn By: Sheet Number: Scale: 1/4/22 FE22-1700 THIS DRAWING IS THE PROPERTY OF THE ENGINEER. IT HAS BEEN SPECIFICALLY PREPARED FOR THE OWNER FOR THIS PROJECT AT THIS SITE AND IS NOT TO BE USED FOR ANY OTHER PURPOSE, LOCATION OR OWNER WITHOUT WRITTEN CONSENT OF THE ENGINEER.PREPARED FOR245 NORWICH-NEW LONDON ROAD (RT 32)22 UNIT CONDOMINIUM DEVELOPMENTD.R.R.J.E.Q.WESTERN GROUP, LLCSubmission 01/25/22 525 JOHN STREET BRIDGEPORT, CT. 06604 Office (203) 333-9465 fax (203) 336-1769 e-mail Info@FullerSurveyors MONTVILLE, CONNECTICUTAPPROVED BY THE MONTVILLE PLANNING AND ZONING COMMISSION CHAIRMAN DATE WILTON'S WAYO:\Fuller CAD Files\CT\Bridgeport\Benson Terrace\#26 - FE13-1101 - Fox\Survey Data\2013 09 10 FE 13-1100 FOX 26BENSON TERR\LOCATION.crd1/25/2022 10:58 AMEROSION & SEDIMENT CONTROL PLAN 1.THIS PLAN IS FOR THE PROPOSED SOIL EROSION AND SEDIMENT CONTROL FOR THE CONSTRUCTION OF A RESIDENTIAL DEVELOPMENT WITH PARKING, AND MISCELLANEOUS LANDSCAPING ALONG THE CT ROUTE 32. THIS PLAN IS NOT TO BE USED AS A SITE OR CONSTRUCTION PLAN. ADDITIONAL DESIGN AND DETAILS REQUIRED FOR BIDDING AND CONSTRUCTION. 2.THE CONTRACTOR IS SOLELY RESPONSIBLE FOR THE MEANS, METHODS AND SEQUENCES OF CONSTRUCTION AND FOR THE SAFETY OF WORKERS AND OTHERS ON THE CONSTRUCTION SITE. 3.THE PROPOSED DEVELOPMENT SHOWN HEREON HAS BEEN DESIGNED IN ACCORDANCE WITH SECTION 15.1 OF THE ZONING REGULATIONS AND WILL REQUIRE REVIEW AND APPROVAL BY THE TOWN OF MONTVILLE BUILDING DEPARTMENT. 4.ALL WORK PERFORMED BY THE OWNER / DEVELOPER MUST INCLUDE IMPLEMENTATION OF AN APPROVED SOIL EROSION AND SEDIMENTATION PLAN IN ACCORDANCE WITH PUBLIC ACT No. 83-388 [PASSED BY THE CONNECTICUT GENERAL ASSEMBLY]. THE OWNER / DEVELOPER SHALL BE THOROUGHLY FAMILIAR WITH THE CONNECTICUT GUIDELINES FOR EROSION AND SEDIMENT CONTROL PUBLISHED BY THE CONNECTICUT COUNCIL OF SOIL AND WATER CONSERVATION, JANUARY 1985. 5.RESTORE ALL DISTURBED AREAS WITH A MINIMUM OF FOUR (4") INCHES OF TOPSOIL, SEED, AND HAY MULCH UPON COMPLETION OF CONSTRUCTION. 6.SEE SHEET C-4.2 FOR EROSION CONTROL NOTES AND DETAILS. A." LOCATION MAP, NOTES & A2 SURVEY, COMMERCIAL / RESIDENTIAL COMPLEX, NORWICH-NEW LONDON ROAD (CT ROUTE 32) MONTVILLE, CONNECTICUT", DATED SEPTEMBER 19, 2014, REVISED THROUGH 3/17/15, SCALE 1"=20', SHEET 1 OF 5, BY JEROME J. DEMPSEY, L.S. 111213141516171819202122 10 98765432 TO REMAIN NORWICH-NEW LONDONROAD (CT ROUTE 32)EXTG. GARAGE EXTG. HOUSE >>>>>>>>>>>>PARCEL AREA 79,607 S.F. 1.83 AC WOODED AREA 48" TREE EXIST ING TREEL INE 15' Side Yard Setback 15' Side Yard Setback30' Front Yard Setback3 0 ' R e a r Y a r d S e t b a c k PROPOSED SILT FENCE SFSFSFSFSFSFSFSFSFSFSFSFSF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SFSFSF SF SFSFSFSFSF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF PROPOSED ANTI TRACKING APRON 45 50 50 55 55 60 60 65 6570 70 75 75 4242 42 43 43 44 44 46 47 47 48 48 49 49 51 51 52 5253 53 54 54 56 56 57 57 58 58 59 59 61 61 6262 63 63 64 6466 66 67 67 68 68 69 6971 71 72 72 7373 747476 76 45 50 55 60 6570 75 444647484951525354565758596162636466676869717273 74 7677 S69° 36' 08"E372.03' S22° 35' 2 2 " E 214.50' N74° 06' 41"W332.13'N74° 06' 41"W179.29' N17° 56 ' 34"E197.30' A.ALL GRADED OR DISTURBED AREAS INCLUDING SLOPES SHALL BE PROTECTED DURING CLEARING AND CONSTRUCTION IN ACCORDANCE WITH APPROVED SEDIMENT CONTROL PLAN UNTIL THEY ARE PERMANENTLY STABILIZED. B.ALL SEDIMENT CONTROL PRACTICES AND MEASURES SHALL BE CONSTRUCTED, APPLIED AND MAINTAINED IN ACCORDANCE WITH THE APPROVED SEDIMENT CONTROL PLAN. C.TOPSOIL REQUIRED FOR THE ESTABLISHMENT OF VEGETATION SHALL BE STOCKPILED IN AN AMOUNT NECESSARY TO COMPLETE FINISHED GRADING OF ALL EXPOSED AREAS. D.AREAS TO BE FILLED SHALL BE CLEANED, GRUBBED AND STRIPPED OF TOPSOIL TO REMOVE TREES, VEGETATION, ROOTS, OR OTHER OBJECTIONABLE MATERIAL. E.AREAS ARE TO BE TOPSOILED IN ACCORDANCE WITH TOPSOILING REQUIREMENTS. F.ALL FILLS SHALL BE COMPACTED AS REQUIRED TO REDUCE EROSION, SLIPPAGE, SETTLEMENT, SUBSIDENCE OR OTHER RELATED PROBLEMS. G.ALL FILL SHALL BE PLACED AND COMPACTED IN LAYERS NOT TO EXCEED EIGHT INCHES IN THICKNESS. H.FILL MATERIAL SHALL BE FREE OF BRUSH, RUBBISH, ROCKS, LOGS, STUMPS, BUILDING DEBRIS AND OTHER OBJECTIONABLE MATERIALS THAT WOULD INTERFERE WITH OR PREVENT CONSTRUCTION OF SATISFACTORY FILLS. I.FROZEN MATERIAL OR SOFT, MUCKY OR HIGHLY COMPRESSIBLE MATERIALS SHALL NOT BE INCORPORATED INTO FILLS. J.FILL SHALL NOT BE PLACED ON A FROZEN FOUNDATION. K.ALL GRADED AREAS SHALL BE PERMANENTLY STABILIZED IMMEDIATELY FOLLOWING FINISHED GRADING. a.BALES SHALL BE PLACED IN A SINGLE ROW, LENGTHWISE ON THE CONTOUR, WITH ENDS OF ADJACENT BALES TIGHTLY ABUTTING ONE ANOTHER. b.ALL BALES SHALL BE EITHER WIRE-BOUND OR STRING-TIED. BALES SHALL BE INSTALLED SO THAT BINDINGS ARE ORIENTED AROUND THE SIDES RATHER THAN ALONG THE TOPS AND BOTTOMS OF THE BALES TO PREVENT DETERIORATION OF THE BINDINGS. c.THE BARRIER SHALL BE ENTRENCHED AND BACKFILLED. A TRENCH SHALL BE EXCAVATED THE WIDTH OF A BALE AND THE LENGTH OF THE PROPOSED BARRIER TO A MINIMUM DEPTH OF 4 INCHES. AFTER THE BALES ARE STAKED AND CHINKED, THE EXCAVATED SOIL SHALL BE BACKFILLED AGAINST THE BARRIER. BACKFILL SOIL SHALL CONFORM TO THE GROUND LEVEL ON THE DOWNHILL SIDE AND SHALL BE BUILT UP TO 4 INCHES AGAINST THE UPHILL SIDE OF THE BARRIER. BALES SHOULD BE PLACED 10 FEET AWAY FROM TOE OF SLOPE OR AS SHOWN ON THE PLANS. d.EACH BALE SHALL BE SECURELY ANCHORED BY AT LEAST TWO STAKES OR REBARS DRIVEN THROUGH THE BALE. THE FIRST STAKE IN EACH BALE SHALL BE DRIVEN TOWARD THE PREVIOUSLY LAID BALE TO FORCE THE BALES TOGETHER. STAKES OR REBARS SHALL BE DRIVEN DEEP ENOUGH INTO THE GROUND TO SECURELY ANCHOR THE BALES. e.THE GAPS BETWEEN BALES SHALL BE CHINKED (FILLED BY WEDGING) WITH STRAW TO PREVENT WATER FROM ESCAPING BETWEEN THE BALES. (LOOSE STRAW SCATTERED OVER THE AREA IMMEDIATELY UPHILL FROM A STRAW BALE BARRIER TENDS TO INCREASE BARRIER EFFICIENCY.) IN SLOPING AREAS WHERE SURFACE FLOW FOLLOWS THE BALE LINE, PERPENDICULAR BALE CHECKS SHALL BE INSTALLED AT APPROPRIATE INTERVALS (100 FEET MAXIMUM). f.INSPECTION SHALL BE FREQUENT AND REPAIR OR REPLACEMENT SHALL BE MADE PROMPTLY AS NEEDED. g.BALE BARRIERS SHALL BE REMOVED WHEN THEY HAVE SERVED THEIR USEFULNESS, BUT NOT BEFORE THE UPSLOPE AREAS HAVE BEEN PERMANENTLY STABILIZED. TOPSOILING SYNTHETIC FIBER FILTER FABRIC SYNTHETIC FILTER FABRIC SHALL BE A PERVIOUS SHEET OF PROPYLENE, NYLON, POLYESTER, OR POLYETHYLENE FILAMENTS AND SHALL BE CERTIFIED BY MANUFACTURER OR SUPPLIER AS CONFORMING TO THE FOLLOWING REQUIREMENTS: NATURAL FIBER FILTER FABRIC BURLAP SHALL BE 10 OUNCE PER SQUARE YARD FABRIC. POSTS FOR FILTER FENCES SHALL BE EITHER 2X3 OR 2X4 INCH STUDS OR 0.5 POUNDS (MINIMUM) PER LINEAR FOOT STEEL WITH A MINIMUM LENGTH OF 5 FEET. STEEL POSTS SHALL HAVE PROJECTIONS FOR FASTENING WIRE TO THEM. STAKES FOR FILTER FENCE SHALL BE 1"X2" WOOD OR EQUIVALENT METAL WITH MINIMUM LENGTH OF 3 FEET. WIRE FENCE REINFORCEMENT FOR SILT FENCES USING STANDARD STRENGTH FILTER CLOTH SHALL BE A MINIMUM OF 42 INCHES IN HEIGHT, A MINIMUM OF 14 GAUGE AND SHALL HAVE A MAXIMUM MESH SPACING OF 6 INCHES. SOME SILT FENCES DO NOT REQUIRE A WIRE BACKING. CONSULT MANUFACTURER'S INSTRUCTIONS FOR PROPER INSTALLATION REQUIREMENTS. REQUIREMENTS 75% (MIN.) EXTRA STRENGTH-50 LBS./LIN. IN. (MIN.) STANDARD STRENGTH- 30 LBS./LIN. IN. (MIN.) 0.3 GAL./SQ. FT./MIN. (MIN.) b. PHYSICAL PROPERTY FILTERING EFFICIENCY TENSILE STRENGTH AT 20% (MAX.) ELONGATION FLOW RATE a.INSPECTION SHALL BE MADE AFTER EACH STORM EVENT AND REPAIR OR REPLACEMENT SHALL BE MADE PROMPTLY AS NEEDED. b.CLEAN OUT OF ACCUMULATED SEDIMENT BEHIND THE BALES IS NECESSARY IF 1/2 OF THE ORIGINAL HEIGHT OF THE BALES BECOMES FILLED IN WITH SEDIMENT. FILTER FENCESB. 1. a. MATERIALS MAINTENANCE2. F. TO PROVIDE A SUITABLE GROWTH MEDIUM FOR FINAL SITE STABILIZATION WITH VEGETATION. ALL STRUCTURAL, NONSTRUCTURAL AND VEGETATIVE SEDIMENT AND EROSION CONTROL PRACTICES IMPLEMENTED DURING LAND GRADING OPERATIONS SHALL BE MAINTAINED ACCORDING TO REQUIREMENTS OUTLINED ON THIS PLAN. INSTALLATION REQUIREMENTS2. PURPOSE1. MAINTENANCE3. 1.OTHER THAN CONSTRUCTION SPECIFICALLY SHOWN ON THESE APPROVED PLANS, NO ACTIVITIES SHALL BE CONDUCTED WITHIN DESIGNATED WETLAND AREAS, WATERCOURSES, FLOOD PLAINS OR WITHIN CHANNEL ENCROACHMENT LINES WITHOUT THE PRIOR APPROVAL OF THE PLANNING AND ZONING COMMISSION AND INLAND WETLANDS COMMISSION. 2.WHEREVER FEASIBLE, NATURAL VEGETATION SHALL BE RETAINED AND PROTECTED. 3.ONLY THE SMALLEST PRACTICAL AREA OF LAND SHALL BE EXPOSED AT ANY ONE TIME DURING CONSTRUCTION. 4.PRIOR TO THE START OF CONSTRUCTION, TEMPORARY BALED HAY EROSION CHECKS, SEDIMENTATION FENCES AND OTHER APPROVED SEDIMENT CONTROL MEASURES SHALL BE IN PLACE WHERE SHOWN ON THESE PLANS AND AT OTHER LOCATIONS WHERE DEEMED NECESSARY. 5.WHEN LAND IS EXPOSED DURING DEVELOPMENT, THE PERIOD OF EXPOSURE SHALL BE KEPT TO A MINIMUM, INSTALLING PERMANENT AND FINAL VEGETAT- ION, STRUCTURES, ETC. AT THE EARLIEST POSSIBLE OPPORTUNITY. 6.CONSTRUCTION EQUIPMENT SHALL NOT UNNECESSARILY CROSS LIVE STREAMS EXCEPT BY MEANS OF BRIDGES, CULVERTS OR OTHER APPROVED MEANS. 7.ALL TEMPORARY EROSION AND SEDIMENT CONTROLS SHALL REMAIN IN PLACE AND BE MAINTAINED REGULARLY IN PROPER FUNCTIONING CONDITION, UNTIL ALL AREAS EXPOSED DURING SITE CONSTRUCTION HAVE BEEN SUITABLY STABILIZED WITH FINAL VEGETATIVE COVER. 8.CUT AND FILL SLOPES SHALL NOT BE STEEPER THAN 2:1 UNLESS STABILIZED BY A GEOTEXTILE MAT. 9.ADEQUATE PROVISIONS SHALL BE MADE TO PREVENT SURFACE WATER FROM DAMAGING THE CUT FACE OF EXCAVATIONS OR THE SLOPING SURFACES OF FILLS. 10.FILL SHALL BE PLACED AND COMPACTED SO AS TO MINIMIZE SLIDING OR EROSION OF THE SOIL. D. SEDIMENT BARRIERS TO INTERCEPT AND RETAIN SMALL AMOUNTS OF SEDIMENT FROM DISTURBED OR UNPROTECTED AREAS OF LIMITED EXTENT. SEDIMENT BARRIERS MAY CONSIST OF FILTER FENCE OR STRAW OR STRAWBALES, STONE BERMS, OR OTHER FILTER MATERIALS. PLANNED LIFESPAN OF SEDIMENT BARRIERS VARIES. STRAWBALES SHOULD ONLY BE USED AS A TEMPORARY BARRIER FOR NO LONGER THAN 60 DAYS. SYNTHETIC FILTER FENCES CAN BE USED FOR 60 DAYS OR LONGER DEPENDING ON ULTRAVIOLET STABILITY AND MANUFACTURER'S RECOMMENDATIONS. STONE BARRIERS CAN BE USED FOR LONGER PERIODS OF TIME. STRAWBALES SHEET FLOW APPLICATIONS MATERIALS AND INSTALLATION A. 1. E.PURPOSE A. PURPOSE-EROSION CONTROL C. GENERAL GUIDELINES-EROSION CONTROL B. CONTINGENCY PLAN ALL CONSTRUCTION ACTIVITIES INVOLVING THE REMOVAL OR DISTURBANCE OF SOILS ARE TO BE PROVIDED WITH APPROPRIATE PROTECTIVE MEASURES TO MINIMIZE EROSION AND CONTAIN SEDIMENT DISPOSITION WITHIN THE AREA UNDER DEVELOPMENT. THE MINIMUM STANDARD FOR INDIVIDUAL MEASURES SHALL BE THOSE OUTLINED IN THE "CONNECTICUT GUIDELINES FOR SOIL EROSION AND SEDIMENTATION CONTROL" 2002 EDITION AS AMENDED TO DATE. THOSE METHODS DEEMED MOST EFFECTIVE FOR THIS PROJECT ARE DESCRIBED HEREIN. AS A PRECAUTIONARY MEASURE THE CONTRACTOR SHALL AT ALL TIMES KEEP AT LEAST TWO ONE HUNDRED FOOT ROLLS OF SEDIMENTATION FENCE & 20 STRAWBALES STOCKPILED ON SITE WHICH SHALL BE AVAILABLE FOR UNFORESEEN EROSION OR SEDIMENT PROBLEMS SHOULD ANY ARISE. THE CONTRACTOR SHALL IMMEDIATELY INSTALL THE SEDIMENT FENCE DOWN SLOPE SO AS TO CONTAIN ANY SEDIMENT. THE CONTRACTOR SHALL THEN PROMPTLY CONTACT THE DESIGN ENGINEER TO DETERMINE IF FURTHER CORRECTIVE ACTION IS REQUIRED. THE DESIGN ENGINEER, AFTER CONSULTATION WITH THE ZONING/WETLANDS ENFORCEMENT OFFICER SHALL THEN INSTRUCT THE CONTRACTOR AS TO WHAT ADDITIONAL MEASURES ARE DEEMED NECESSARY. a.THIS SEDIMENT BARRIER UTILIZES BURLAP OR STANDARD STRENGTH OR EXTRA STRENGTH SYNTHETIC FILTER FABRICS. IT IS DESIGNED FOR SITUATIONS IN WHICH ONLY SHEET OR OVERLAND FLOWS IS EXPECTED. IN SPECIAL CASES BURLAP MAY BE USED IN DRAINWAYS. b.THE HEIGHT OF THE BARRIER SHALL NOT EXCEED 36 INCHES (HIGHER BARRIERS MAY IMPOUND VOLUMES OF WATER SUFFICIENT TO CAUSE FAILURE OF THE STRUCTURE). THE FILTER FENCE SHALL BE PLACED 10 FEET AWAY FROM THE TOE OF THE SLOPE, OR AS SHOWN ON THE PLANS. c.WHEN JOINTS ARE NECESSARY, FILTER CLOTH SHALL BE SPLICED TOGETHER ONLY AT A SUPPORT POST, WITH A MINIMUM 6 INCH OVERLAP, AND SECURELY SEALED. SEE MANUFACTURER'S RECOMMENDATIONS. d.POSTS SHALL BE SPACED A MAXIMUM OF 10 FEET APART AT THE BARRIER LOCATION AND DRIVEN SECURELY INTO THE GROUND (MINIMUM OF 12 INCHES). WHEN EXTRA STRENGTH FABRIC IS USED WITHOUT THE WIRE SUPPORT FENCE, POST SPACING SHALL BE AS MANUFACTURER RECOMMENDS. e.A TRENCH SHALL BE EXCAVATED APPROXIMATELY 6 INCHES WIDE AND 6 INCHES DEEP ALONG THE LINE OF POSTS AND UPSLOPE FROM THE BARRIER IN ACCORDANCE WITH MANUFACTURER'S RECOMMENDATIONS f.WHEN STANDARD STRENGTH FILTER FABRIC IS USED, A WIRE MESH SUPPORT FENCE SHALL BE FASTENED SECURELY TO THE UPSLOPE SIDE OF THE POSTS USING HEAVY DUTY WIRE STAPLES AT LEAST 1 INCH LONG, TIE WIRES OR HOG RINGS. THE WIRE SHALL EXTEND INTO THE TRENCH A MINIMUM OF 2 INCHES BELOW THE ORIGINAL GROUND SURFACE. g.THE STANDARD STRENGTH FILTER FABRIC SHALL BE STAPLED, WIRED OR TIED TO THE WIRE FENCE, AND 8 INCHES OF FABRIC SHALL BE EXTENDED INTO THE TRENCH. THE FABRIC SHALL NOT EXTEND MORE THAN 36 INCHES ABOVE THE ORIGINAL GROUND SURFACE. FILTER FABRIC SHALL NOT BE STAPLED TO EXISTING TREES. h.WHEN EXTRA STRENGTH FILTER FABRIC OR BURLAP AND CLOSER POST SPACING ARE USED, THE WIRE MESH SUPPORT FENCE MAY BE ELIMINATED. IN SUCH A CASE, THE FILTER FABRIC IS STAPLED, WIRED, OR TIED DIRECTLY TO THE POSTS WITH ALL OTHER PROVISIONS OF ITEM NO. f APPLYING. i.THE TRENCH SHALL BE BACKFILLED AND THE SOIL COMPACTED OVER THE FILTER FABRIC. j.FILTER BARRIERS SHALL BE REMOVED WHEN THEY HAVE SERVED THEIR USEFUL PURPOSE, BUT NOT BEFORE THE UPSLOPE AREA HAS BEEN PERMANENTLY STABILIZED. a.FILTER BARRIERS SHALL BE INSPECTED IMMEDIATELY AFTER EACH RAINFALL AND AT LEAST DAILY DURING PROLONGED RAINFALL. ANY REQUIRED REPAIRS SHALL BE MADE IMMEDIATELY. b.SHOULD THE FABRIC DECOMPOSE OR BECOME DEFECTIVE PRIOR TO THE END OF THE EXPECTED USABLE LIFE AND THE BARRIER STILL BE NECESSARY, THE FABRIC SHALL BE REPLACED PROMPTLY. c.SEDIMENT DEPOSITS SHOULD BE REMOVED WHEN THEY REACH APPROXIMATELY ONE-HALF THE HEIGHT OF THE BARRIER. d.ANY SEDIMENT DEPOSITS REMAINING IN PLACE AFTER THE SILT FENCE OR FILTER BARRIER IS NO LONGER REQUIRED SHALL BE DRESSED TO CONFORM TO THE EXISTING GRADE, PREPARED AND SEEDED. TO RESTORE AREA UPON COMPLETION OF CONSTRUCTION, AND INSTALLATION REQUIREMENTS PURPOSE 2. 1. LAND GRADING MAINTENANCE3. INSTALLATION REQUIREMENTS2. DURING AND UPON COMPLETION OF LAND GRADING OPERATIONS. SOIL EROSION & SEDIMENTATION CONTROL NOTES: .... ...... .... .... PUBLIC R O A D GRADATION TABLE TYP ANTI TRACKING APRON DETAIL SCALE: N.T.S. Job Number: Job Start Date: Checked By: Sheet Title: Drawn By: Sheet Number: Scale: 1/4/22 FE22-1700 THIS DRAWING IS THE PROPERTY OF THE ENGINEER. IT HAS BEEN SPECIFICALLY PREPARED FOR THE OWNER FOR THIS PROJECT AT THIS SITE AND IS NOT TO BE USED FOR ANY OTHER PURPOSE, LOCATION OR OWNER WITHOUT WRITTEN CONSENT OF THE ENGINEER.PREPARED FOR245 NORWICH-NEW LONDON ROAD (RT 32)22 UNIT CONDOMINIUM DEVELOPMENTD.R.R.J.E.Q.WESTERN GROUP, LLCSubmission 01/25/22 525 JOHN STREET BRIDGEPORT, CT. 06604 Office (203) 333-9465 fax (203) 336-1769 e-mail Info@FullerSurveyors MONTVILLE, CONNECTICUTAPPROVED BY THE MONTVILLE PLANNING AND ZONING COMMISSION CHAIRMAN DATE WILTON'S WAYO:\Fuller CAD Files\CT\Bridgeport\Benson Terrace\#26 - FE13-1101 - Fox\Survey Data\2013 09 10 FE 13-1100 FOX 26BENSON TERR\LOCATION.crd1/25/2022 11:01 AMEROSION & SEDIMENT CONTROL NOTES & DETAILS A.SITE INVESTIGATIONS SHALL BE MADE TO DETERMINE IF THERE IS SUFFICIENT TOPSOIL OF GOOD QUALITY TO USE FOR SITE RESTORATION. HIGH QUALITY TOPSOIL SHALL BE FRIABLE AND LOAMY (LOAM, SANDY LOAM, SILT LOAM, SANDY CLAY LOAM, CLAY LOAM). OTHER SOIL TYPES WITH HIGH ORGANIC CONTENT MAY BE FOUND SUITABLE AFTER TESTING. IT SHALL BE FREE OF DEBRIS, TRASH, STUMPS, ROCKS, ROOTS, AND NOXIOUS WEEDS. IT SHALL GIVE EVIDENCE OF BEING ABLE TO SUPPORT HEALTHY VEGETATION. IT SHALL CONTAIN NO SUBSTANCE THAT IS POTENTIALLY TOXIC TO PLANT GROWTH. ALL TOPSOIL SHALL BE TESTED BY A RECOGNIZED LABORATORY TO DETERMINE THE PROPER APPLICATION RATES FOR LIME AND FERTILIZER. B.STRIPPING STRIPPING SHALL BE CONFINED TO THE IMMEDIATE CONSTRUCTION AREA. A 4 TO 6 INCH STRIPPING DEPTH IS COMMON, BUT DEPTH MAY VARY DEPENDING ON THE PARTICULAR SOIL. ALL PERIMETER DIKES, BASINS, AND ANY OTHER SEDIMENT CONTROLS SHALL BE IN PLACE PRIOR TO STRIPPING. C.STOCKPILING TOPSOIL SHALL BE STOCKPILED IN SUCH A MANNER THAT NATURAL DRAINAGE IS NOT OBSTRUCTED AND NO OFF-SITE SEDIMENT DAMAGE SHALL RESULT D.SIDE SLOPES SIDE SLOPES OF THE STOCKPILE SHALL NOT EXCEED 2 TO 1 (2 HORIZONTALLY TO 1 VERTICALLY). E.SEDIMENT BARRIER A SEDIMENT BARRIER SHALL SURROUND ALL TOPSOIL STOCKPILES. F.TEMPORARY SEEDING TEMPORARY SEEDING OF STOCKPILES SHALL BE COMPLETED WITHIN 15 DAYS OF THE FORMATION OF THE STOCKPILE, IN ACCORDANCE WITH THE TEMPORARY VEGETATIVE COVER REQUIREMENTS. G.SITE PREPARATION BEFORE TOPSOILING, ESTABLISH NEEDED EROSION AND SEDIMENT CONTROL MEASURES SUCH AS DIVERSIONS, GRADE STABILIZATION STRUCTURES, WATERWAYS, SEDIMENT BASINS, ETC. THESE MEASURES MUST BE MAINTAINED DURING TOPSOILING. H.GRADING PREVIOUSLY ESTABLISHED GRADES ON THE AREAS TO BE TOPSOILED SHALL BE MAINTAINED ACCORDING TO THE APPROVED PLANS. WHEREVER SILT FENCE RUNS ACROSS OR PERPENDICULAR TO SURFACE CONTOURS, 10-FOOT LONG WINGS OF SILT FENCE PLACED PERPENDICULAR TO THE MAIN RUN OF SILT FENCE SHOULD BE PROVIDED AT APPROXIMATE INTERVALS OF 50-FEET. SILT FENCE PROTECTION DETAIL SCALE: NTS 3. BACKFILL THE TRENCH AND COMPACT THE EXCAVATED SOIL. 2. ATTACH FILTER FABRIC TO THE POSTS AND EXTEND IT TO THE TRENCH. SILT FENCE1. SET POSTS AND EXCAVATE A 6"x6" TRENCH, SET POST DOWNSLOPE. WOOD POSTS ANGLE 10° UPSLOPE FOR STABILITY AND SELF CLEANING COMPACTED BACKFILL BOTTOM OF DRAINAGE WAY ELEVATION POINTS "A" SHOULD BE HIGHER THAN POINT "B"PLAN VIEW 90° 12" MIN.DEPTH A B A B FLOW1" REBAR FOR BAG REMOVAL FROM INLET EXPANSION RESTRAINT 1/4" NYLON ROPE 2"x2"x3/4" RUBBER BLOCK SILT SACK NOTE: REGULAR FLOW = 40 GAL./MIN./SF HIGH FLOW = 200 GAL./MIN./SF SILT SACK INLET PROTECTION DETAIL SCALE: NTS 3' 2'4' C-5.1 LANDSCAPE PLAN 1"=20' SHRUB / GROUNDCOVER PLANTING SCALE: NTS MULCH NOTE 1.IN AREAS OF MASS PLANTING, CONTINUOUSLY EXCAVATE AND MULCH ENTIRE BED. 3" SOIL SAUCER (TYP.) TOPSOIL SUBSOIL SCARIFY SIDES OF ROOT BALL COMPACTED PLANTING MIX BELOW BALL SET TOP OF ROOT BALL AT OR SLIGHTLY ABOVE FIN. GRADE CUT BURLAP FROM TOP OF 1/3 OF ROOT BALL PLANTING MIX SCARIFY GLAZED SIDES OR HARDENED SURFACE IF PITS ARE DUG WITH AUGERING DEVICES CONTAINER GROWN EQUALS TWICE BALL DIAMETER EQUALS TWICE BALL DIAMETER MIN. 6" 6" MIN.6"MIN.6" MIN. BALLED AND BURLAPPED TREE PLANTING SCALE: NTS PRUNING SHALL BE IN ACCORDANCE WITH APPROVED HORTICULTURAL STANDARDS IN ORDER TO PRESERVE THE NATURAL FORM OF THE SPECIFIC PLANTS. IF APPLICABLE & APPROVED BY THE LANDSCAPE ARCHITECT, ONE-FOURTH TO ONE-THIRD OF THE WOOD SHALL BE REMOVED BY THINNING OUT TO BALANCE ROOT LOSS DUE TO TRANSPLANTING. NOTE 5' x 5' TREE PLANTING AREA - 24 SF (MIN.) CUT BURLAP AND WIRE BASKETS, REMOVE FROM TOP 1/3 OF ROOT BALL 3" BARK MULCH 3" SOIL SAUCER TYP. FINISHED GRADE TOPSOIL SUBSOIL PLANTING SOIL MIXTURE, SEE LANDSCAPE NOTES. EACH TREE TO BE PROVIDED A MINIMUM OF 12 C.F. OF LOAM INCORPORATED INTO SOIL PLANTING MIXTURE SET TOP OF ROOT BALL AT OR SLIGHTLY ABOVE FINISHED GRADE 24" (MIN.) 5' SCARIFY GLAZED SIDES OR HARDENED SURFACE IF PITS ARE DUG WITH AUGERING DEVICE REMOVE ROCK 18'' MIN BELOW PLANT PIT DEPTH. 18" (MIN.) TOP OF LEDGE GENERAL NOTES 1. ALL PLANTING MIXES SHALL BE PREPARED PRIOR TO DELIVERY TO SITE 2. PLANTING MIX FOR TREES AND SHRUBS SHALL BE AS FOLLOWS 3 PARTS SCREED TOPSOIL 1 PART CLEAN WASHED COARSE SAND 1 PART PEAT HUMUS 5 LBS. COMPOST PER CUBIC YARD OF MIX 3. MYCORRHIZAL INNCOULANT TO BE MYCOR TREE SAVER TRANSPLANT BY PLANT HEALTH CARE, INC. (1-800-421-9051) OR APPROVED EQUAL. 4. TERRASORB AVAILABLE FROM PLANT HEALTH CARE, INC. OR APPROVED EQUAL 5. SUBMIT CERTIFICATION OF PLANTING MIX FOR TREES AND SHRUBS FROM SOIL DISTRIBUTOR. 6. TOPSOIL MIX SHALL INCLUDE: 3 PARTS SCREENED TOPSOIL 1 PART SAND 1 PART HUMUS 5 LBS. COMPOST PER CU. YD. OF MIX 7. TOPSOIL: A. PROVIDE A NATURAL, FERTILE, FRIABLE, NATURAL LOAM SURFACE SOIL CAPABLE OF SUSTAINING VIGOROUS PLANT GROWTH. OF UNIFORM COMPOSITION THROUGHOUT AND WITHOUT ADMIXTURES OF SUBSOIL, AND FREE OF STONES, LUMPS, PLANTS, ROOTS, STICKS OR OTHER EXTRANEOUS MATTER. B. TOPSOIL SHALL CONTAIN NOT LESS THAN 4% NOR MORE THAN 20% ORGANIC MATTER AS DETERMINED BY THE WET COMBUSTION METHOD. C. MECHANICAL ANALYSIS SCREEN SIZE % BY WEIGHT PASSING 1"100 V4"97 - 100 NO. 200 20 - 65 D. CONTRACTORS SHALL BE RESPONSIBLE FOR ALL TESTING AND ANALYSIS OF EXISTING AND IMPORTED SOILS. FURNISH A SOIL ANALYSIS MADE BY A QUALIFIED INDEPENDENT SOIL - TESTING AGENCY STATING PERCENTAGES OF ORGANIC MATTER, INORGANIC MATTER (SILT, CLAY, AND SAND), DELETERIOUS MATERIAL, PH, AND MINERAL AND PLANT - NUTRIENT CONTENT OF TOPSOIL. E. REPORT SUITABILITY OF TOPSOIL FOR LAWN AND SHRUB PLANTING GROWTH. RECOMMEND QUANTITIES OF NITROGEN, PHOSPHORUS. AND POTASH NUTRIENT AND ANY LIMESTONE, ALUMINUM SULFATE, OR OTHER SOIL AMENDMENTS TO BE ADDED TO PRODUCE A SATISFACTORY TOPSOIL. PLANTING SOIL NOTES 1. BE AWARE OF ALL UNDERGROUND UTILITIES PRIOR TO ANY EXCAVATION OR PLANTING OPERATIONS. USE CARE TO PROTECT EXISTING UTILITIES FROM DAMAGE, CONTACT "CALL BEFORE YOU DIG" PRIOR TO EXCAVATION. 2.ALL PLANTINGS ARE TO BE INSTALLED BY A QUALIFIED LANDSCAPE CONTRACTOR. 3.THE CONTRACTOR SHALL BE REQUIRED TO CARRY WORKMEN'S COMPENSATION INSURANCE AND COMPREHENSIVE GENERAL LIABILITY INSURANCE. CERTIFICATES WILL BE REQUIRED PRIOR TO SIGNING CONTRACTS. 4.CONTRACTOR IS RESPONSIBLE FOR JOBSITE SAFETY. CONTRACTOR SHALL MAINTAIN A SAFE JOBSITE AT ALL TIMES. 5.CONTRACTOR SHALL BE FAMILIAR WITH THE SITE VERIFY ALL DIMENSIONS, GRADES AND EXISTING CONDITIONS. REPORT ANY DISCREPANCIES TO LANDSCAPE DESIGNER. 6.CONTRACTOR IS RESPONSIBLE FOR OBTAINING ALL PERMITS AND LICENSES REQUIRED FOR COMPLETING WORK. 7.CONTRACTOR SHALL BE RESPONSIBLE FOR DISPOSAL OF ALL EXCAVATED SOIL, BRUSH AND DEBRIS OFF-SITE IN A SAFE AND LEGAL MANNER. 8.NOTIFY OWNER OR LANDSCAPE DESIGNER 72 HOURS MINIMUM IN ADVANCE OF STARTING PLANTING OPERATIONS. RECEIVE APPROVAL FOR LAYOUT OF ALL BED LINES AND MATERIAL LOCATIONS PRIOR TO INSTALLATION. 9.PROTECT EXISTING VEGETATION TO REMAIN FROM DAMAGE DURING CONSTRUCTION. IT IS THE INTENT OF THIS CONTRACT TO AVOID ANY DISTURBANCE TO EXISTING VEGETATION ON THE SITE OTHER THAN THOSE SPECIFICALLY DESIGNATED FOR REMOVAL. ADJUSTMENTS SHALL BE MADE IN THE FIELD AT THE DIRECTION OF THE LANDSCAPE DESIGNER. 10.CONTRACTOR IS RESPONSIBLE FOR COORDINATING ALL PLANTING, SEEDING AND TREE WORK WITH OTHER TRADES. RESPECT OTHER TRADES WORK AT ALL TIMES. 11.CONTRACTOR IS TO EXERCISE EXTREME CARE DURING THE COURSE OF DEMOLITION AND REMOVALS ANY DAMAGE TO EXISTING FACILITIES, UTILITIES OR TREES TO REMAIN SHALL BE THE SOLE RESPONSIBILITY OF THE CONTRACTOR TO REPLACE IN KIND. 12.CONTRACTOR IS RESPONSIBLE FOR RESTORING ALL AREAS DAMAGED TO PRE-EXISTING CONDITIONS AS A RESULT OF PLANTING OPERATIONS TO OWNERS AND/OR LANDSCAPE DESIGNERS APPROVAL. 13.VEGETATION TO BE REMOVED, NOT INDICATED ON PLAN, SHALL BE TAGGED IN FIELD BY LANDSCAPE DESIGNER. 14.THE LANDSCAPE DESIGNER RESERVES THE RIGHT TO REJECT INFERIOR PLANT MATERIALS AND SUBSTITUTIONS. THE LANDSCAPE DESIGNER IS WILLING TO MAKE TWO TRIPS TO SUPPLIERS TO TAG, REVIEW AND APPROVE MATERIALS. PREVIOUSLY UNAPPROVED MATERIALS MAY BE REJECTED AT THE SITE. MINIMALLY, ALL MATERIALS WILL CONFORM TO THE "AMERICAN STANDARD FOR NURSERY STOCK" (ANSI Z60.1 - 2004) OF THE AMERICAN ASSOCIATION OF NURSERYMEN. 15.ALL PLANT MATERIAL SHALL BE GUARANTEED BY THE CONTRACTOR TO BE IN GOOD, HEALTHY AND FLOURISHING CONDITION FOR A PERIOD OF ONE YEAR FROM THE DATE OF ACCEPTANCE. THE CONTRACTOR SHALL REPLACE, AS SOON AS WEATHER AND SEASONAL CONDITIONS PERMIT, ALL DEAD PLANTS AND ALL PLANTS NOT IN A VIGOROUS, THRIVING CONDITION, AS DETERMINED BY THE LANDSCAPE DESIGNER DURING, AND AT THE END OF THE GUARANTEE PERIOD. WARRANTY REPLACEMENT WILL BE PROVIDED AT NO COST TO THE OWNER AND INCLUDE MATERIALS AND LABOR. CONTRACTOR IS RESPONSIBLE FOR REPAIR OF ANY DAMAGE INCURRED DURING REPLACEMENT OF WARRANTY MATERIALS. 16.WHEN THERE IS A DISCREPANCY BETWEEN PLANT QUANTITIES SHOWN ON THE PLANT LIST & THE PLAN, USE THE QUANTITIES FROM THE PLAN. 17.PERENNIALS, GROUNDCOVERS & GRASSES TO BE FIELD LOCATED BY LANDSCAPE DESIGNER. COORDINATE TO NOTIFY LANDSCAPE DESIGNER AT LEAST 72 HOURS IN ADVANCE OF EXPECTED INSTALLATION DATE. ON THAT DATE ALL BEDS SHALL BE PREPARED & ALL PLANT MATERIAL SHALL BE ON SITE. 18.PROVIDE A MINIMUM 6" TOPSOIL FOR ALL DISTURBED AREAS. SUBMIT SAMPLE OF TOPSOIL AND SOIL TEST RESULTS FOR LANDSCAPE DESIGNER APPROVAL PRIOR TO DELIVERING TO SITE. 19.MULCH ALL BEDS SHOWN AS CONTINUOUS WITH A 3" MINIMUM OF DOUBLE SHREDDED CEDAR BARK MULCH. SAMPLE TO BE SUBMITTED TO LANDSCAPE DESIGNER FOR APPROVAL. 20.ALL PLANT MATERIALS TO BE SOURCED FROM LOCALLY GROWN GROWERS. 21.TRANSPLANTED MATERIALS TO BE WATERED, HEELED IN AND TENDED BY CONTRACTOR UNTIL FINAL PLACEMENT. PLANTING NOTES PROPOSED PLANT SCHEDULE Job Number: Job Start Date: Checked By: Sheet Title: Drawn By: Sheet Number: Scale: 1/4/22 FE22-1700 THIS DRAWING IS THE PROPERTY OF THE ENGINEER. IT HAS BEEN SPECIFICALLY PREPARED FOR THE OWNER FOR THIS PROJECT AT THIS SITE AND IS NOT TO BE USED FOR ANY OTHER PURPOSE, LOCATION OR OWNER WITHOUT WRITTEN CONSENT OF THE ENGINEER.PREPARED FOR245 NORWICH-NEW LONDON ROAD (RT 32)22 UNIT CONDOMINIUM DEVELOPMENTD.R.R.J.E.Q.WESTERN GROUP, LLCSubmission 01/25/22 525 JOHN STREET BRIDGEPORT, CT. 06604 Office (203) 333-9465 fax (203) 336-1769 e-mail Info@FullerSurveyors MONTVILLE, CONNECTICUTAPPROVED BY THE MONTVILLE PLANNING AND ZONING COMMISSION CHAIRMAN DATE WILTON'S WAYO:\Fuller CAD Files\CT\Bridgeport\Benson Terrace\#26 - FE13-1101 - Fox\Survey Data\2013 09 10 FE 13-1100 FOX 26BENSON TERR\LOCATION.crd1/25/2022 11:07 AM1.THESE PLANS ARE FOR PERMITTING PURPOSES ONLY AND ARE NOT FOR CONSTRUCTION. 2.THE OWNER IS RESPONSIBLE FOR OBTAINING ALL NECESSARY ZONING PERMITS REQUIRED BY THE LOCAL MUNICIPALITY PRIOR TO CONSTRUCTION. THE CONTRACTOR SHALL POST ALL BONDS, PAY ALL FEES, PROVIDE PROOF OF INSURANCE AND PROVIDE TRAFFIC CONTROL NECESSARY FOR THIS WORK. 3.THE CONTRACTOR SHALL VERIFY ALL SITE CONDITIONS IN THE FIELD AND CONTACT THE CIVIL ENGINEER IF THERE ARE ANY QUESTIONS OR CONFLICTS REGARDING THE CONSTRUCTION DOCUMENTS AND/OR FIELD CONDITIONS. 4.THE CONTRACTOR SHALL REFERENCE ARCHITECTURAL PLANS FOR EXACT DIMENSIONS AND CONSTRUCTION DETAILS OF BUILDING. 5.SHOULD ANY UNCHARTED OR INCORRECTLY CHARTED, EXISTING PIPING OR OTHER UTILITY BE UNCOVERED DURING EXCAVATION, CONSULT THE CIVIL ENGINEER IMMEDIATELY FOR DIRECTIONS BEFORE PROCEEDING FURTHER WITH WORK. 6.SEE SHEET C-4.1 FOR SOIL EROSION AND SEDIMENT CONTROL MEASURES MAP REFERENCES: A."ZONING IMPROVEMENT LOCATION AND TOPOGRAPHIC SURVEY", DATED 7 JANUARY 2022, SCALE 1"=20', BY FULLER ENGINEERING AND LAND SURVEYING, LLC. B."LOCATION MAP, NOTES, & A2 SURVEY, COMMERCIAL / RESIDENTIAL COMPLEX NORWICH-NEW LONDON ROAD (CT ROUTE 32) MONTVILLE, CONNECTICUT", DATED SEPTEMBER 19, 2014, REVISED THROUGH 3/17/15, SCALE: 1" = 20', BY DENNIS A. JEROME J. DEMPSEY, L.S. 111213141516171819202122 10 98765432 TO REMAIN (3) AR (1) AR (1) AS (1) AS (1) CC (1) CC (1) CC (1) CF (1) CF (1) CF (1) CF (1) CF (6) CF (24) ICC EXTG. WOODLAND AREA TO REMAIN (24) ICC (1) CC(1) CF (1) CF RESTORE ALL DISTURBED AREAS WITH NEW ENGLAND SEED MIXTURES AS SPECIFIED RESTORE ALL DISTURBED AREAS WITH NEW ENGLAND SEED MIXTURES AS SPECIFIED APPROXIMATE LOCATION OF OFF-SITE WETLAND (GIS) 50' UPLAND REVIEW AREA NORWICH-NEW LONDONROAD (CT ROUTE 32)EXTG. GARAGE EXTG. HOUSE PARCEL AREA 79,607 S.F. 1.83 AC WOODED AREA 48" TREE EXIST ING TREEL INE 15' Side Yard Setback 15' Side Yard Setback30' Front Yard Setback3 0 ' R e a r Y a r d S e t b a c k W W W W W W WWETC ETC ETC W W W W W W W W W W W W W W W W W W W W W W W W W FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM Job Number: Job Start Date: Checked By: Sheet Title: Drawn By: Sheet Number: Scale: 1/4/22 FE22-1700 THIS DRAWING IS THE PROPERTY OF THE ENGINEER. IT HAS BEEN SPECIFICALLY PREPARED FOR THE OWNER FOR THIS PROJECT AT THIS SITE AND IS NOT TO BE USED FOR ANY OTHER PURPOSE, LOCATION OR OWNER WITHOUT WRITTEN CONSENT OF THE ENGINEER.PREPARED FOR245 NORWICH-NEW LONDON ROAD (RT 32)22 UNIT CONDOMINIUM DEVELOPMENTD.R.R.J.E.Q.WESTERN GROUP, LLCSubmission 01/25/22 525 JOHN STREET BRIDGEPORT, CT. 06604 Office (203) 333-9465 fax (203) 336-1769 e-mail Info@FullerSurveyors MONTVILLE, CONNECTICUTAPPROVED BY THE MONTVILLE PLANNING AND ZONING COMMISSION CHAIRMAN DATE WILTON'S WAYO:\Fuller CAD Files\CT\Bridgeport\Benson Terrace\#26 - FE13-1101 - Fox\Survey Data\2013 09 10 FE 13-1100 FOX 26BENSON TERR\LOCATION.crd1/25/2022 11:07 AMEXTRUDED BITUMINOUS CONCRETE LIP CURBING DETAIL SCALE: NTS DETAIL PER TOWN OF MONROE DPW STANDARD DRAWINGS 48° 21° R=2"BITUMUNOUS CONCRETE PAVEMENT TACK COAT ASPHALT PAVING STANDARD DUTY ASPHALT PAVING HEAVY DUTY PAVING DETAILS SCALE: NTS CLASS 1, 1.5" BIT. CONC. WEARING COURSE CLASS 4, 2.5" BIT. CONC. BINDER COURSE 4" GRANULAR BASE COURSE 9" GRANULAR SUBBASE COURSE COMPACTED SUBGRADE GRANULAR SUBBASE COURSE COMPACTED SUBGRADE CLASS 1, 1.5" BIT. CONC. WEARING COURSE CLASS 4, 1.5" BIT. CONC. BINDER COURSE 4" GRANULAR BASE COURSE 6" GRANULAR SUBBASE COURSE COMPACTED SUBGRADE 6" PCC SURFACE COURSE, 4,000 PSI 6" GRANULAR BASE COURSE WELDED WIRE FABRIC 6 x 6 - W2.0 x W2.0 (2" CLEAR) HEAVY DUTY CONCRETE PAVING CRUSHED STONE LEVELING PAD (ASTM NO. 57 OR EQUIVALENT) PERFORATED DRAIN W/ SOCK (OR AS SPECIFIED BY ENGINEER) (GRAVITY DRAIN TO OUTLET) NON-WOVEN GEOTEXTILE FABRIC DRAINSTONE (ASTM NO. 57 OR EQUIVALENT) TO EXTEND AT LEAST 12" BEHIND BLOCKS BASE ELEVATION GROUND LEVEL HEIGHT VARIES SEE GRADING PLAN TOP BLOCK 2' 0"(Min. Bury Depth) 1'-0"(Leveling Pad) GROUND LEVEL BOTTOM BLOCK SCALE: NTS TYPICAL GRAVITY TYPE RETAINING WALL SECTION DETAIL REDI-ROCK MODULAR CONCRETE RETAINING WALL - LEDGESTONE RANDOM STACKED PATTERN OR APPROVED EQUAL BLACK VINYL COATED CHAIN LINK FENCE4' DUMPSTER PAD ENCLOSURE - BOARD ON BOARD FENCE SCALE: NTS Mid-Railis standardon 4 1/2' and over 1" (Typ.) CLEARANCE (UNDER FENCE) 8' 91" (INSIDE MEASURE) 3/4 x 4 FACIA BOARD 1-3/16" x 1-5/8" END CLEAT 1 x 3 HORIZONTAL RAIL 3-1/4" RAIL EXTRA LONG POST NEEDED FOR STEPPING SECTION-FRAME SIDE DOUBLE GATE FRAME SIDE CAP END VIEW TOP VIEW 3/4 x 4 FACIAPOST6 x 6 1 x 3 HORIZ. RAIL 16d BOX NAIL GALV. 8' WIDE 1-3/16" x 1-5/8" END CLEAT 1-1/2" BEVELED EDGE (TYP.) POST 6'DARK BROWN WOOD STAIN 12"Ø CONC. FOUNDATION 12"Ø 12"Ø CONC. FOUNDATION TYP. AT ALL CORNERS AND GATES L TIMBER GUIDE RAIL SCALE: NTS NOTES 1.ALL TIMBER TO BE PRESSURE TREATED CCA=0.40 PCF SOUTHERN YELLOW PINE BOLT HEAD OR NUT SHALL NOT PROTRUDE FROM SURFACE OF RAIL OR POST 10"2" ANTI-CHECK SPLINE (TYP.) 10" x 10" POST (TYP.) 4" 8" 1"-0" 4'-0" GRADE 5" x 8" CROSS MEMBER 4 GALVANIZED CARRIAGE BOLTS. COUNTER BORE REAR TO RECEIVE NUT AND WASHER (TYP.) 8'-0" C TO C (TYP.)8'-0" END CONDITION (TYP.)L 10" 3" 2" 1" CHAMFER (TYP.)O:\Fuller CAD Files\CT\Montville\Rte 32\#245 Route 32 - FE22-1700 - Eanou\DWG\Site\C 6.1 - DETAILS.dwg, 1/25/2022 11:07:22 AM, DWG To PDF.pc3 Job Number: Job Start Date: Checked By: Sheet Title: Drawn By: Sheet Number: Scale: 1/4/22 FE22-1700 THIS DRAWING IS THE PROPERTY OF THE ENGINEER. IT HAS BEEN SPECIFICALLY PREPARED FOR THE OWNER FOR THIS PROJECT AT THIS SITE AND IS NOT TO BE USED FOR ANY OTHER PURPOSE, LOCATION OR OWNER WITHOUT WRITTEN CONSENT OF THE ENGINEER.PREPARED FOR245 NORWICH-NEW LONDON ROAD (RT 32)22 UNIT CONDOMINIUM DEVELOPMENTD.R.R.J.E.Q.WESTERN GROUP, LLCSubmission 01/25/22 525 JOHN STREET BRIDGEPORT, CT. 06604 Office (203) 333-9465 fax (203) 336-1769 e-mail Info@FullerSurveyors MONTVILLE, CONNECTICUTAPPROVED BY THE MONTVILLE PLANNING AND ZONING COMMISSION CHAIRMAN DATE WILTON'S WAYO:\Fuller CAD Files\CT\Bridgeport\Benson Terrace\#26 - FE13-1101 - Fox\Survey Data\2013 09 10 FE 13-1100 FOX 26BENSON TERR\LOCATION.crd1/25/2022 11:06 AMNOTE: FILTER FABRIC SHALL BE NON-WOVEN, MEETING ASTM D-3776 AND D-4491. 4'-0" 5'-0" NOT TO SCALE 4'-6"4'-6"4'-6" TYPICAL PARKING LOT PAVEMENT SECTION ON 6" MINIMUM COMPACTED PROCESSED AGGREGATE BASE COURSE OR FINISHED GRADE FILTER FABRIC 4'-0" 8" MIN. 1" CRUSHED STONE 1" CRUSHED STONE BASE 6" 4'x8'x4' OR 4'x4'x4' PRE-CAST CONCRETE GALLEYS BY CONNECTICUT PRE-CAST OR APPROVED EQUAL SEE PLAN SHEET SU-1 AND SU-2 FOR EXTENTS & LIMITS SLOPE SLOPE 2' SQ x 6" THICKCLASS B CONCRETE PAD TAMP BACKFILL VALVE BODY AND DEPTH OF BURYVALVE BOX TO SUIT VALVE WATER PIPE ADJUST TOP SECTION TO FINISH GRADE VALVE BOX TO BE ENTIRELY SUPPORTEDBY CONCRETE BLOCKS OR BRICKS TOSUIT. VALVE BOX MUST NOT BEAR ONVALVE OR PIPE. GATE VALVE DETAIL SCALE: NTS TYPICAL UTILITY TRENCH DETAIL SCALE: NTS SPECIAL FOUNDATION, IF ORDERED BY ENGINEER 3/4" CRUSHED STONE TO BE INSTALLED TO DEPTH DETERMINED BY GEOGRAPHICAL ENGINEER IN PEAT AND UNSUITABLE SOIL AREAS 7" SAND BED FROM MAIN TO METER PIT (GAS LINE ONLY) 1'-0" MIN IN ROCK. 12" SAND COVER OVER PIPE METAL STRIPS BURIED 12" ABOVE P.E. PIPE EVERY 5' & AT BENDS (GAS LINES ONLY) MARKING TAPE BURIED OVER ELECTRIC AND TELEPHONE CONDUITS TRENCH WIDTH: 1'-0" ELECT., TELE. AND CATV. 3'-0" WHEN ELEC., CATV, & TEL. ARE GROUPED IN TRENCH BOTTOM OF UTILITY TRENCH APPROVED COMPACTED % MAX DRY BACKFILL (95 DENSITY) COMPACTION PER ASTM D1557 IN 8" LIFTS 3'-6" (FOR GAS & WATER)3'-0" (FOR ELECT.)2'-0" (FOR TEL. & CATV)4" TOPSOIL IN EARTH IN PAVEMENT SEE DETAIL FOR PAVEMENT SECTION 10" CAST IRON COVER CLEAN-OUT PLUG CAST IRON CLEAN OUT 18"x18" PAD 28 DAY 3000 PSI CONCRETE GRADE 4" PVC 4"- 45° ELBOW END CAP 6" X 4" TEE "Y" UNDERGROUND PIPING PIPE SIZE PER PLAN STORM CLEANOUT DETAIL SCALE: N.T.S CLEAN-OUT BOX IS INDEPENDENT OF PIPE TYPICAL SANITARY SEWER TRENCH SECTION SCALE: NTS EDGE OF TRENCH SUPPORT SYSTEM AS REQUIRED SUITABLE BACK FILL TYPE GW, GP, SW, SP PER UNIFIED SOIL CLASSIFICATION SYSTEM OR AS APPROVED BY SITE ENGINEER, COMPACTED TO 95% MAX. DRY DENSITY IN LIFTS (8" TYPICAL) PER ASTM D1557 (MODIFIED PROCTOR TEST) 3/4" CRUSHED STONE INSTALL CLAY DAM WATER STOP 2' (MIN.) THICKNESS AT 50' C-C BOTTOM OF TRENCH SPECIAL FOUNDATION IF ORDERED BY ENGINEER - 3/4" CRUSHED STONE TO BE INSTALLED TO DEPTH DETERMINED BY ENGINEER IN PEAT AND UNSUITABLE AREAS 6" MIN. 1'-0" MIN. IN ROCK TRENCH WIDTH O.D. + 2'-0" MIN. 6" 6" 4' CO N E RISERVARIESRISERVARIESBASE4' MIN.12" INV (INLET) 293.87 6" MIN.7" PRECAST STORM MANHOLE SCALE: NTS NOTES 1.5' OR 6' DIA. PRECAST BASES MAY BE USED WHEN REQUIRED DUE TO SIZE OR NUMBER OF PIPES AT THE MANHOLE. PRECAST REDUCERS WILL BE PLACED ABOVE THE 5' & 6' BASES AS DIRECTED BY THE ENGINEER. 2.WALL THICKNESS TO INCREASE 1" FOR EACH 1' OF INSIDE DIAMETER INCREASE. 3.WHEN INLET SEWER INVERT TO OUTLET SEWER INVERT ELEVATION EXCEEDS 24" USE DROP CONNECTION. 12" INV (OUTLET) 293.10 BITUMASTIC COATING (TYP.) 5" MIN.7" (TYP.) ALUMINUM STEP PERFORMED PLASTIC GASKET OR FLEXIBLE WATERTIGHT RUBBER GASKET PRECAST REINFORCED CONCRETE TONGUE AND GROOVE RISERS AS REQUIRED LIFTING HOLES (TYP.) (FILL WITH MORTAR) WELDED WIRE FABRIC PRECAST REINFORCED CONCRETE MANHOLE ECCENTRIC CONE ADJUST TO GRADE WITH MAX. OF FOUR COURSES OF BRICK OF CONC. GRADE RINGS (12" MAX.) 7' WIDTHS FRAME AND COVER 2'-2" DIA. 8" 3" MIN. 12" (TYP) 2 1/4" MIN. 4'-0" DIA. 2' 4" INV (INLET) 293.63 CURBING 4'-0'' WHERE CB IS IN A SAG VARY CROSS SLOPE OF GUTTER TO MATCH CROSS SLOPE OF GRADE (TYP.)NORMAL CROSSSLOPE OF GUTTER (TYP.)NOTE: CONCRETE COMPRESSIVE STRENGTH = 4000psi @ 28 DAYS VARIESFINISHED GRADE MAY VARY ADJACENT TO CATCH BASIN AS DIRECTED 3-34" (TYP.)14"/ FT. DROP MIN. 3-58'' (TYP.)INSTALL PERVIOUS BACKFILL ABOVE THIS ELEVATION FROM BOTTOM OF SUBBASETO A MAX. DEPTH OF 3'-0''1'-8-58''1'-0'' 8'' (TYP.)2'-0''6''WHEN THIS DIMENSION EXCEEDS 10' -0'', THECATCH BASIN WILL BE PAID FOR AS A TYPE ''C-L'' CATCH BASINOVER 10' DEEP (INCREASE WALL THICKNESS TO 12")3'-0'' 4'-4'' 14"/ FT DROP MIN. 7'' 1'-0'' (TYP.) 8'' (TYP.)7-58" (TYP.) 2'-8-34''2'-0'' MIN.6''5'-4" 4'-0'' FLOATABLES AND DEBRIS TO BE CLEANED PERIODICALLY HOODED INLET TRAP BY NEENAH FOUNDRY OR APPROVED EQUAL 9'' OUTLET PIPE WATER LEVEL HOOD BELOW WATER LEVEL (TYPICAL)O:\Fuller CAD Files\CT\Montville\Rte 32\#245 Route 32 - FE22-1700 - Eanou\DWG\Site\C 6.1 - DETAILS.dwg, 1/25/2022 11:06:27 AM, DWG To PDF.pc3 Job Number: Job Start Date: Checked By: Sheet Title: Drawn By: Sheet Number: Scale: 1/4/22 FE22-1700 THIS DRAWING IS THE PROPERTY OF THE ENGINEER. IT HAS BEEN SPECIFICALLY PREPARED FOR THE OWNER FOR THIS PROJECT AT THIS SITE AND IS NOT TO BE USED FOR ANY OTHER PURPOSE, LOCATION OR OWNER WITHOUT WRITTEN CONSENT OF THE ENGINEER.PREPARED FOR245 NORWICH-NEW LONDON ROAD (RT 32)22 UNIT CONDOMINIUM DEVELOPMENTD.R.R.J.E.Q.WESTERN GROUP, LLCSubmission 01/25/22 525 JOHN STREET BRIDGEPORT, CT. 06604 Office (203) 333-9465 fax (203) 336-1769 e-mail Info@FullerSurveyors MONTVILLE, CONNECTICUTAPPROVED BY THE MONTVILLE PLANNING AND ZONING COMMISSION CHAIRMAN DATE WILTON'S WAYO:\Fuller CAD Files\CT\Bridgeport\Benson Terrace\#26 - FE13-1101 - Fox\Survey Data\2013 09 10 FE 13-1100 FOX 26BENSON TERR\LOCATION.crd1/25/2022 11:05 AMSEWAGE EJECTOR PUMP TYPICAL BELOW BASEMENT FLOOR INSTALLATION NOT TO SCALE MANHOLE WILL BE CLASSED AND PAID FOR AS MANHOLE CONCRETE OR BRICK INVERTFRAME STEP ALL JOINTS SHALL BE POINTED FLUSH AND FULL CLASS ''A'' CONCRETE WALLS SHALL BE BUILT OF MASONRY CONCRETE UNITS OR CLASS ''A'' CONCRETE AT THE OPTION OF THE CONTRACTOR. DIAMETER VARIES WITH THICKNESS OF THE WALL3' (914) TO 4' (1219)5" (152) (TYP.) 1'-0" (305)1'-2" (356) TO 5'-4" (1626)8" (203) 12" (305) (TYP.) 4'-0" (1219) DIA. WALL SHALL BE A MIN. OF 6''(152) WITH MASONARY CONCRETE UNITS. CLASS ''A'' CONCRETE WALL SHALL BE 12''(300) THICK WHEN DEPTH OF MANHOLE IS GREATER THAN 10'(3048) DEEP. MASONRY WALLS SHALL BE PLASTERED OUTSIDE WITH 2:1 CEMENT MORTAR '' (13) THICK. MASONRY MUST BE WET WHEN MORTAR IS APPLIED. MASONRY CONCRETE UNITS SHALL BE LAID IN CEMENT SAND MORTAR 1:2 MIX. JOINTS SHALL NOT BE OVER ''(13) ON INSIDE FACE 10"(254) 2'-7" (787) MASONARY CONCRETE UNIT OR CLASS "A" CONCRETE0.8 XPIPE DIA.PIPE DIA. "/FT "/FT 3 18"(79)O:\Fuller CAD Files\CT\Montville\Rte 32\#245 Route 32 - FE22-1700 - Eanou\DWG\Site\C 6.1 - DETAILS.dwg, 1/25/2022 11:05:52 AM, DWG To PDF.pc3