Loading...
HomeMy WebLinkAboutC & D ReportsTown of Montville Planning Department Cease and Desist Report Date: 10/18/07 Location: 1399 Old Colchester Rd - During the September 20th meeting of the Commission the Commission took testimony from both the Chester’s and the Diamantini’s. - A site walk was scheduled for September 27th - Commissioner Whittaker indicated that the following were areas of concern: o The 2nd driveway location appeared to be within the buffer area o Construction equipment was being stored within the buffer area o Depositing of material within buffer area - Attorney Harry Heller sent the Commission a letter regarding the Oxiby Farm Resident Association and has indicated that the Resident Association is not the approval authority under the second amended and restated declaration of easement rights and restrictive covenants Town of Montville Planning Department Cease and Desist Report Date: 10/18/07 Location: 1399 Old Colchester Rd - During the September 20th meeting of the Commission the Commission took testimony from both the Chester’s and the Diamantini’s. - A site walk was scheduled for September 27th - Commissioner Whittaker indicated that the following were areas of concern: o The 2nd driveway location appeared to be within the buffer area o Construction equipment was being stored within the buffer area o Depositing of material within buffer area - Attorney Harry Heller sent the Commission a letter regarding the Oxiby Farm Resident Association and has indicated that the Resident Association is not the approval authority under the second amended and restated declaration of easement rights and restrictive covenants Town of Montville Planning Department Cease and Desist Report Date: 11-15-07 Location: 1399 Old Colchester Rd - During the October meeting of the Commission the Commission stated that they had been out to the site on Sept 27th - Commission had the following concerns Location of 2nd Driveway’s proximity to the 50 ft buffer Material dumped within the buffer area Storage of material within the buffer area - Commissioner Whittaker asked that an as-built be provided to the Commission - Commission asked Staff to take pictures of material in buffer area