HomeMy WebLinkAboutSite PlanL4.j
Ou-
4ko
I ,
PLATO
D' JV.
IV
-4
y
A Ae
4
to
+
fto V
�:Op.,m fo
T
0
eve
2-
16,
N,
Y -J-
W
4 Rod
-A
ON,
7.r*Ir.
Ilk jill'A llog bt m,
r w
P.0
-4
In ic* al t�� t z
Kwm. or d
, fewoo
vu y
tho
Ag
loam
VA
N- 46 Inco# P .0. ox .1 41 0 . Pfmdl Ohio
2,
I I coorif * m- A!!llllik� T 0 M214 t
or
Mr.
1! 6
4 Units 0 1 1/2 caa par. Unit
Lot 055- 110 Units e 1 -1/2%pe.,pe por Unit
15 Sp4cas - PrOvidaid
Lot: 5 Units a 1'•,.1/2 /6 -accts ar Unit
15 600cas Provided
i
213.4T'--
6V-W-')TF---,----
jNAIL W. ME HO -MO 1///7
NOTE: EXISTING VECETArION IS TO REMAIN
AS REAR BUFFER (ALL 1-0'rS)
PROVIDE CONCRETE DUMPSTER PAD W1
STOCKADE F&vX SURR(XkWING
(SEE DETAIL)
PROVIDE ROW Of' 8' HIGH BLUE SPRUCE
8'0/01 2"MIN. CALIPER
PROVIDE HANDICAP PARKING SPACE
W1 PAINTED SYMBOL & .91ON (SiW b7ETAL)
PROVIDE TYPE "5" SIDEWALK RAMP
(SEE DETAIL )
PROVIDE PAWED DIRECTIONAL
ARROW ff- -DETAIL)
PROVIDE NON -TRACKING CONSTRUC-
CX3-1 -IA4,- T.F. 214.5
/W. 211.5
rrTTM
EXIST. CATCH BASIN
T
INV OUT 210-63
PROP. INV. IN 211.0
PROVIDE =P VON a
PAINM STOP BAR
(SEE DETAIL)
EXIST. CATCH BASIN
TF 213.6
APPROVEV BY THE MOWIVILLE PLANNIN6
AND ZONIN6 COMMISSION.
rrjT
1po
C>H 0
0)�i�L HoLE
is
NIF
F601-TAL, Y,
9,F.
OAge FEET
Ty,p.
-WILDINS SaMAOK LINE
)F,-Oposw e'l RZ-MT AMRZILAIA
59
ASSCS6OR LOT NVMBeR
MO.K#-MNT
--210--
exl6vN6 GOVT -
10
,210-
CIONTOM
M.H.
MANHOLE
EXIST.
existlNe
PROF05W 5POT ELEVATION
INY.
INVERT ELEVATION
T.F.
TOP Or- FRAME M-EVATION
i
213.4T'--
6V-W-')TF---,----
jNAIL W. ME HO -MO 1///7
NOTE: EXISTING VECETArION IS TO REMAIN
AS REAR BUFFER (ALL 1-0'rS)
PROVIDE CONCRETE DUMPSTER PAD W1
STOCKADE F&vX SURR(XkWING
(SEE DETAIL)
PROVIDE ROW Of' 8' HIGH BLUE SPRUCE
8'0/01 2"MIN. CALIPER
PROVIDE HANDICAP PARKING SPACE
W1 PAINTED SYMBOL & .91ON (SiW b7ETAL)
PROVIDE TYPE "5" SIDEWALK RAMP
(SEE DETAIL )
PROVIDE PAWED DIRECTIONAL
ARROW ff- -DETAIL)
PROVIDE NON -TRACKING CONSTRUC-
CX3-1 -IA4,- T.F. 214.5
/W. 211.5
rrTTM
EXIST. CATCH BASIN
T
INV OUT 210-63
PROP. INV. IN 211.0
PROVIDE =P VON a
PAINM STOP BAR
(SEE DETAIL)
EXIST. CATCH BASIN
TF 213.6
APPROVEV BY THE MOWIVILLE PLANNIN6
AND ZONIN6 COMMISSION.
rrjT
'ORMON AW SWNM,, Comm WORTS FILTM BAWM INSTALLATION 4 MAINTENANCZ
%5DIV15ION AND 51TE DEVELOPMENT, PLAN 1. V19 a b" trench on the uphill sido of the barrlor location,
PRZIPARZIP FOR 2. Position the, posts on the, downhill side, of the, barrier and drive,
ARTEMIS MANDE5
FLATOZ DRIthe post 1.5 feet into the, ground.
VE
MONTVILLE, CONNECTICUT
5. Lay the bottom b" of the fabric. In the tranah to prevent
vndermInIng and backfill.
p9p"WaVA 16 MAM We 4. Inspaot and repair barrier after heavy rainfall.
1. 5vlodivelon/51te vevelopment Flan .tonin Vistr7lat R-205. Sediment deposits are to be
removed when they reach a height of one
prepared For Artemis M Flotoz drive WbntyIlIr,,.Connecticvt
foot behind the barrier and are to be depositod,-jrI an area v4hi0h
Scolot 1' =20'" 21, 101014 C*aidler, Palmer 4 KN Norwich, CowcAlevt
is not raqvloted bV the Inland H6,lands
6. Inspections and necessary repairs will be made, 'twice weekly.2. Connoaiavt evidelines for Soil Erosion and Sediment Control,
HAY SAM ION 4 MAI
SollSvIrveq of Now London County Connecticut, U.5.P.A. 5611
0onstrvation Service 1. 5ales shall bepbales tiht laced ar66nd oil pro�c�ch
sed catch basins Hlth
the ends of the
-ly abutting other.
g
2. Each bola shall be securely anchored with at least 2 stokes and
gs between boles shall" be wedged with straw to prevent
• ap
water from passing betHeen the bolas.
Proposed 5vbdivision will allow for the craotion of 5 Wilding
lots ranging In size from 25,24,1 s.f. to 500454 s.f. Each P4111 5. Inspect boles after each storm and repair or replace promptly
be serviced by on site Municipal water 4 ?4Aialpal sewer. Total as needed. Remove sediment behind the, bales when it has
area to be disturbed = 1.2 1 acres reached half the height of the bole, and deposit in on area
which is not regulated by the Inland Notionds Commission.
4. Inspections and necessary repairs will be, mode twice weekly.
TEWORARY VESIMThM CAWMt
The proposed site, if, composed mainly of two soil types;
Char Iton - Hollis- "Cr(:," 4
A temporary seeding of Rye, Crass will be, completed within 15 days
of the formation of stockpile(s). If the soll In the stockptles has
1. "Oro" Fine sandy loom$, very rocky, with 5 to 15 percent slope -4.. been compacted by construction operations It shall be, loosened to
These, gently sloping to sloping complex consists of som'ewhota depth of 2 Inches before the fertilizer, lime and seed is applied.
excessively drained and well drained soils, on glacial till 4 10-10-10 fertilizer at a rote, of 1.5 pounds per 1000 s.f. and lima
vpland landforms. sto"'ot a rote of (10 lbs. per 1000 s.f. shall be used. Rye Crags
applied of a rote, of I lb. per 1000 s.f. shall provide. the, temporary
looms, very rocky, with 15 to 45 percent slopes. vegetativa cover. Straw or hog, free from woodss-cind coarse matter shall
2. "CIrC711 Fines be used at a rote, of -10-410 lbs. per 1000 s.f.'a's a temporary mulch.
Thasa moderately steep to Steep complex consists of somewhat
excessively drained and well drained soils, on glacial till 4 5trow or hog, free from Heads a-0 000rse, matter shall i:>e used at a rate,
W11and landforms. of 10-cl0 lig. per 1000 s.f. a$ o temporary mulat. Apply mulch and drive,
tracked 0c111pment vp and down slope, over entire, surface so cleat marks
are parallel to contovr.
YBMTATIi
Ceonstrvctlon Hill begin with clearing, 9rvbi;)Inc3 and rough 9radIN c
of the proposed sites. FolloNing rovo grading procedures, all ;drainage Topsoil will be replaced once .the excavation has been completed
and vtllity strvctvres and the associated piping will be Instol . led an and the shoulders are graded to a slope no greater than 5 to 1.
-
protected hay bales or silt fcme- 'The" protective measures are Topsoil will be spread at a minimum compacted depth of 4 inches.
Once the topsoil has been screed, --oI,l_.stonos,tv4o, inches or.larger
remain in place, and properly maintained `throughout construction,
In any dimonslon will be removed as well as debris. Apply -o9rIrvItvroI
ground Ilmestone. at the rote, of two tons per acre, or 100 lbs. per
All work must be complated within 5 years, as roRvVed by the Connecticvt
General 5tatvtes. 1000 s.f. Apply 1.0-10-10 ft;rtilizer or equivolent at a rote of
500 lips. per ocre, or 1.5 lbs, per 1000 91. k4ork lime and fertilizer
into the soil to a depth of 4 Inches. Inspect seedbed before seeding.
F-och site will be graded so that all possible trees on site will ber If traffic has, compacted the, soil, ret ill compacted areas. Apply the :A
saved to provide buffers to adjoining lots. following gross seed mix:
Topsoil will be stockpiled on site and vtlllzed during final driveway.rodinig. 5aed Mixtvre, lbslocre lbs./1000 s.f.
A non -tracking constrvotion entrance is to be provided at each
Kentucky Bluegrass 20 .45
Creeping Red Fescue 20 .45
Perennial Rye Cross 5 .10
45 1.00
VEY13.0pt4wT WNTPWIL "I
The recommended seeding dates are..
pove,lopmont of the: site, will be performed by The Opqncr. He April I - June 15
will be responsible for the Installation and mol * ntenorice of erosion Avgvst I - September 15
and sediment control measures required throvShout, construction.1
The sedimentation control mechanisms shall remain in place from the Following seeding, firm sebed with a roller, Mvlch Immediately
start of constrvctlon vntil pormotiont vegetation has been established, following seeding. If o permanent vegetative, stand cannot be,
The representative, for the Town of Montville will be notified when the, established by September 50, apply a temporary cover on the,
sediment and erosion control structures are InItialig in place. . onoe topsoll such as netting, mot or an orgonic mulch.
the proposed development, seeding and plaiting have been completed,
the represontottve shall be notified to Inspect the, site. Those, 1
control measures will not be removed until this Inspection Is completo.
All stripping is to confiarea;d to the immediate construction area;
be
Topsoil shall be stockpiled so that slope's do not exceed 2 to. 1. A
hay bole sedlmont'barr(er is to svrromd each stockpile and a orgy
vegetative cover provided.
SECURE TO 1 1/2" 0
Pvst control will be occomplished by sprNing-with P4otor and If FAIW QALVAMZED STEE]L POST
noc.,*ss'ary, the applicdtion of colalvm chlorldo. ANQU 1O`.UP SLOPE
917H (2) 1/4" 0
POST FOR STAXUITY AND Kq*CAPPED OALVANIZED BOLTSThe proposed plonting schedvlo Is to be adhered to during the, CLEANING PARKWO (I TOP. I BOTTOM)
planting of distvirbaid areas thio out the proposed constrv6tion site. VAT( f 13W NXM
CONPA V%
BACKFILL Wj
ftual staL,)Ilizotlon of ft,&U is to follow ft pro4odwas outlined fnp&Tlanart5'-0* TO GRADE
8AN
YeAgotatty's wvar. It no4essairy. 0 twTorory vegetative, coyer is to be provided T ED.
vntli. a permdment cover can be I applied. I NOT 70 SCALE
ANCHOR WITH (2) VxVXY
STAKES EACH BALE STORM SEWER STRUCTURE
FLQW FVW
Z
7, G
NOT TO SCALE
ADJUST TO GRADE WITH MAXIMUM
OF FOUR COURSES OF BRICK
RECAST REINFORCED CONCRETE
MANHOLE ECCENIMC CQ41E
WELDED WIRE FABRIC (ITPICAL)
--PREFORMED PLASTIC CASKET OR
4'_'08 FL&xigLt WATERTIGHT RUBBER GASKET
WALL
411 MI ----IKNOCK(XJT FOR PIPES MINIMUM
MI
4- FRAM TOP AND BOTTOM
OF BASE
7' CONCRETE OR, BRICK
AND MORTAR INVERT
NOW' TO SCALE ALE
ELECTRICAL, TELL
CABLE TELEMW
BOLT JWT
Im OLP 0
IVEWjkY
,-#4. 01 2 1301H WAYS
*A* PLACCO 1 1/2" CLEAR TO
CONCIRIE INSIDE or Box
2" amm 0_-a
LENGTH.
OUW
NOTE:
FRAME AND ORATEO COVER 70 BE
MkWAOTUMO DY LIM&W FWWY M
BROCKTON, MASS. OR EQUAL.
M
IAt ip
M
C
lyp E
-4
3
M
oil___
•ill •. -
.. ,� . L ,
` ` -$�� �.- , "'•1,.
-
-
-SIDEWALK
FIN
. . . . . . . . . . .
- - - - - - - - - - - - - - - - - -
SURFokCE -COUR�E, CLASS 4C*
=4CAETE, SJjRFACE WBE
MISHED ��(ITH A WOOD FLOAT
Ok bY OTHER APPROVED VEANS
CONCRETE
PER
••
I1
�tsg 'A
W 1 1 tK LINE
FACE OF CURB
EXPANSION J010,VY0.)
C
lyp E
-4
W 3 0
i" PER RAMP ALK Fr, 11/4* PE0'
MAX, .
•ill •. -
.. ,� . L ,
` ` -$�� �.- , "'•1,.
-
-
-SIDEWALK
FIN
- - - - - - - - - - - - - - - - - -
SIDEWX
I X
r ROWIED QRAVEL
1/2 CONCRETE RAMP
IN 4' UFM)
AS REQUIRED BY
EZE OF PUMPSTER
CURBING
CURSING
NOT TO S"CALE
RAMP
!A;
PLACE EXPANSION JOINT AT BACK CW
IT
UTTER LINE.
GUTTER
C 41!�j
:CURE LINE OR AT SIDEWALK LINE
CURSIN7G
SECTION ONLY %%ERC
•MIN.
1" ��FT, 40' MAX.
I" ER�FT.
GRA$S
Z-
0
X. CURB
MAX.
BACK Or WALK
IS PROP.06ED
CUT
W 1 1 tK LINE
FACE OF CURB
W r %4%
IN -DEPTH AMR 10/10 WELDED
COMPACTION �-.LACED 'we MESH
IN M 111�;ES
COU
01
CONOR AkAn
PAVEMENT NOT W-ip"
ONTS-M-M -APPROXIMATELY I••BACKFILL
DIV"D
nNISHW GRADE
ED QA8LE_MENW
NOT TO SCALE
BITUMINOUS CONCRETE go
UP CURSING R-2'
11/i CLASS I DIAWM omxn
1 1/2' BINDER COURSE BACKFILL AS
DIRECTED
NOT TO SCALE
iii i i i� � ���� .
lyp E
1
•ill •. -
.. ,� . L ,
` ` -$�� �.- , "'•1,.
-
-
FIN
- - - - - - - - - - - - - - - - - -
51 CO (CRETE WITH
I X
r ROWIED QRAVEL
1/2 CONCRETE RAMP
IN 4' UFM)
AS REQUIRED BY
EZE OF PUMPSTER
An
NOT TO S"CALE
PLACE EXPANSION JOINT AT BACK CW
CT THIS
:CURE LINE OR AT SIDEWALK LINE
SECTION ONLY %%ERC
NO CONQRM =MALK
GRA$S
Z-
0
IS PROP.06ED
.r.
RAMP
k'
OR
1,R
PL OT
SECTIOW-
RAMP SE0110H
E 41!�-j
a
MAX,
MAX.
CVRBING
CURS.
OUTER UNE--"
GUTTER
ARIES) V
R A S S LINE
UZ ELM
�IHIMVR_ 11 0,
ZOW.E-A
MtNIMUM 0',-0*
13ACKUNE OF RAMP
E
AND SIDEWALK
RAMP SE0716N
7\
ELM
NE
3150 MIN.
CUROING
CUT
1 1/2"
VARIES - 1
CONSTRUCTION
31-01
MINIMUM
AS DIRECTED
JOINT (TYP)
2' 1/2'
-20
1/4:12*11
GUTTER
euka
GRAVEL. BASE %o
a,. CLASS 'A' 00NORETE
REINFORQNQ MATERIAL FOR
CALLS k CONCRIM PAVEMENT IF
NOT TO SCALE
W r %4%
IN -DEPTH AMR 10/10 WELDED
COMPACTION �-.LACED 'we MESH
IN M 111�;ES
COU
01
CONOR AkAn
PAVEMENT NOT W-ip"
ONTS-M-M -APPROXIMATELY I••BACKFILL
DIV"D
nNISHW GRADE
ED QA8LE_MENW
NOT TO SCALE
BITUMINOUS CONCRETE go
UP CURSING R-2'
11/i CLASS I DIAWM omxn
1 1/2' BINDER COURSE BACKFILL AS
DIRECTED
NOT TO SCALE
iii i i i� � ���� .
8' PROCESS GRAVEL BAS�--A .
12* BANK -RUN GRAVEL SUBBASE"�
'NOT TO SCALE
.......... Y
SECURE TO 1 1/2, .0 V-4
mjmCp GALVANIZED STEVEL POST ,,
WTH (2) 4
WmT GALVANIZED 8 XTS
0 TOP, I BOT7W)
WHITE
NOTE:
WON TO BE [NSTALLE0 IN
ACCORDANCE WITH STATE .OF
CONNECTICUT D.O.T. STANDARDS 10L
04
AM 3RAM Q - OTIO&AR OW
NOT TO -SCALE NOT TO SCALE
CERTIFIED BY THE M0NT1/4_LE PLANNING
AND .SON INO COMMISSION
slgncatvre dote,
REVISIONS
DATE DESCRIPTION
DATE: MAY 27," 1994
SCALE: -AS NOTED
SHEET 3 OF
Mal
- - - ----------
SITE DEVELOPMENT PLAN
-
FIN
- - - - - - - - - - - - - - - - - -
51 CO (CRETE WITH
oxe pompww
r ROWIED QRAVEL
OAU (COMPACTED
IN 4' UFM)
AS REQUIRED BY
EZE OF PUMPSTER
An
NOT TO S"CALE
8' PROCESS GRAVEL BAS�--A .
12* BANK -RUN GRAVEL SUBBASE"�
'NOT TO SCALE
.......... Y
SECURE TO 1 1/2, .0 V-4
mjmCp GALVANIZED STEVEL POST ,,
WTH (2) 4
WmT GALVANIZED 8 XTS
0 TOP, I BOT7W)
WHITE
NOTE:
WON TO BE [NSTALLE0 IN
ACCORDANCE WITH STATE .OF
CONNECTICUT D.O.T. STANDARDS 10L
04
AM 3RAM Q - OTIO&AR OW
NOT TO -SCALE NOT TO SCALE
CERTIFIED BY THE M0NT1/4_LE PLANNING
AND .SON INO COMMISSION
slgncatvre dote,
REVISIONS
DATE DESCRIPTION
DATE: MAY 27," 1994
SCALE: -AS NOTED
SHEET 3 OF
Mal
- - - ----------
SITE DEVELOPMENT PLAN