Loading...
HomeMy WebLinkAboutRe 38 Hunters Run Planned Shed Installation Narration IPM.Note Re: 38 Hunters Run Planned Shed Installation Narration Re: Colleen Bezanson Luisito Nopal Colleen Bezanson SMTP luisito.nopal@gmail.com 38 Hunters Run Planned Shed Installation Narration EX /O=MICROSOFTONLINE/OU=EXCHANGE ADMINISTRATIVE GROUP (FYDIBOHF23SPDLT)/CN=RECIPIENTS/CN=CBB51D09-0908-4134-AECD-A8C49FC60807 EX /O=MICROSOFTONLINE/OU=EXCHANGE ADMINISTRATIVE GROUP (FYDIBOHF23SPDLT)/CN=RECIPIENTS/CN=CBB51D09-0908-4134-AECD-A8C49FC60807 Received: from mail36-db3-R.bigfish.com (213.199.154.136) by smtp-RED001.mail.microsoftonline.com (10.8.230.50) with Microsoft SMTP Server (TLS) id 8.3.101.1; Fri, 7 Oct 2011 11:19:36 -0700 Received: from mail36-db3 (localhost.localdomain [127.0.0.1]) by mail36-db3-R.bigfish.com (Postfix) with ESMTP id 8C95F18F0590 for <CBezanson@montville-ct.org>; Fri, 7 Oct 2011 18:19:34 +0000 (UTC) X-SpamScore: -25 X-BigFish: vps-25(zz9371Ke6eL1be0Lf01Mc85eh1432N98dKzz1202hzz8275bh8275dhz2fh5fh2a8h668h839h8e3h) X-Forefront-Antispam-Report: CIP:209.85.214.46;KIP:(null);UIP:(null);IPVD:NLI;H:mail-bw0-f46.google.com;RD:mail-bw0-f46.google.com;EFVD:NLI X-FB-SS: 13, Received-SPF: pass (mail36-db3: domain of gmail.com designates 209.85.214.46 as permitted sender) client-ip=209.85.214.46; envelope-from=luisito.nopal@gmail.com; helo=mail-bw0-f46.google.com ;6.google.com ; Received: from mail36-db3 (localhost.localdomain [127.0.0.1]) by mail36-db3 (MessageSwitch) id 131801157429083_17999; Fri, 7 Oct 2011 18:19:34 +0000 (UTC) Received: from DB3EHSMHS013.bigfish.com (unknown [10.3.81.248]) by mail36-db3.bigfish.com (Postfix) with ESMTP id DC7AC11B004F for <CBezanson@montville-ct.org>; Fri, 7 Oct 2011 18:19:33 +0000 (UTC) Received: from mail-bw0-f46.google.com (209.85.214.46) by DB3EHSMHS013.bigfish.com (10.3.87.113) with Microsoft SMTP Server (TLS) id 14.1.225.22; Fri, 7 Oct 2011 18:19:28 +0000 Received: by bkbzt4 with SMTP id zt4so6074931bkb.5 for <CBezanson@montville-ct.org>; Fri, 07 Oct 2011 11:19:27 -0700 (PDT) DKIM-Signature: v=1; a=rsa-sha256; c=relaxed/relaxed; d=gmail.com; s=gamma; h=mime-version:in-reply-to:references:date:message-id:subject:from:to :content-type; bh=cJ7GmANi+1WM0+d+gsiC35vfXFUG7ajYcxsPwjGLmqA=; b=fhzR/RdkkBC/TghrFRjChDiCz7Q9iXh67PEcIMJxPoVN+6i7W2ld4D8IyHpEKw+D+u wbYQdzY1YAa9ndJfvWef6KF37VgoS9FdalF4DttSL75xMfaJwMYplOrmwusgvnp3LCJ4 By3SZi8fHeg5vm+8i/BmS9lA183I2elHT+K78= MIME-Version: 1.0 Received: by 10.204.133.21 with SMTP id d21mr1459179bkt.261.1318011567239; Fri, 07 Oct 2011 11:19:27 -0700 (PDT) Received: by 10.204.35.19 with HTTP; Fri, 7 Oct 2011 11:19:27 -0700 (PDT) In-Reply-To: <818567CC629AFB4AB8DB80CB6F3FDD9A03C0C6235A@VA3DIAXVS791.RED001.local> References: <CAGCVs423sPYDnq-EQGxT9i1Zk=aKrCOJiaQ2=ubotNsdPg1DOg@mail.gmail.com> <818567CC629AFB4AB8DB80CB6F3FDD9A03C0C6235A@VA3DIAXVS791.RED001.local> Date: Fri, 7 Oct 2011 14:19:27 -0400 Message-ID: <CAGCVs415z4S4dnoaqg_FAxxjwo6F6qYMjtP9kc7mJHPMPqSXUg@mail.gmail.com> Subject: Re: 38 Hunters Run Planned Shed Installation Narration From: Luisito Nopal <luisito.nopal@gmail.com> To: Colleen Bezanson <CBezanson@montville-ct.org> Content-Type: multipart/alternative; boundary="0015174488f84671ed04aeb97bcb" Return-Path: luisito.nopal@gmail.com Luisito Nopal SMTP luisito.nopal@gmail.com Colleen Bezanson 38 Hunters Run Planned Shed Installation Narration Hello Coleen, As discussed early this afternoon, below is my revised narration for the planned setup of shed in my property: ------------------ My wife and I decided for a shed to be setup in our backyard so we can put yard and power tools outside our house. Currently, our yard tools are stored either in our basement or in our garage. As of today, we are using our basement to store our mower and the grass clipping leftovers smells bad. We intend to use our basement to be a usable living area where we can store food and dry goods. We also use it to store our patio furniture during winter to protect them from the elements during the winter season. We tried considering to put the mower in our garage during the winter season, but it proved to be harder for us to get into a very cold car during the winter season. We try not to start the car idle just to warm up the interior of the vehicle. Our alternative to setup the shed is on the border of the wetland area. However, we observed that the area we initially thought is the path of water especially during heavy rain since it’s a down slope from the curb side. It might be more dangerous and expensive for us to setup the shed on the initial location, hence deciding to find a much stable place in our yard. This, unfortunately, is within the upland review area, which is 50 feet away from the wetland area. However, this area is flat and dry, not even the water come near the area. The 10X10 shed will be bought from HomeDepot in Montville and as it has been described to me by the store associate; it is already a pre-built unit that will be assembled in my yard on the delivery date. The total area of the project site will be 12X12 or 144 sq feet. The construction will require little digging if none at all since the shed will be setup on top of cinder blocks or whatever the installer will use to make the footing level. There’s no need to perform clearing or grading since the area is already free of any obstacle and is almost level. The drainage is not necessary because it doesn’t have any water connection. The shed installation should be completed in one day since it’s a pre-built, and the shed will be setup during the October/November 2011 time frame. ------------------ Kind Regards, Luisito On Fri, Sep 9, 2011 at 8:35 AM, Colleen Bezanson <CBezanson@montville-ct.org> wrote: Mr. Nopal: They are great. Just combine your narrative with the erosion and sediment control list paragraph and that will be your narrative. The detail plan of the proposal is where on the property you would like to put the shed. My question is are you going to put the shed in the area on your map that says wetlands or in the upland review area which is 50 ft away from the wetland? Depending on where you put it will tell you where you need to put in the square footage of disturbance on the application. For the October meeting the application is due in the office by October 12th Unless you can get it in the office by noon today, then I will put you on this month’s agenda. The process takes two to three months so if you want your shed before November or December you will have to be on the September agenda. Please let me know how you would like to proceed. Colleen Bezanson Planner II Town of Montville Planning Department 310 Norwich New London Tpke Uncasville, CT. 06382 (860) 848-8549 Ext 379 <tel:%28860%29%20848-8549%20Ext%20379> Fax (860) 848-2354 <tel:%28860%29%20848-2354> From: Luisito Nopal [mailto:luisito.nopal@gmail.com] Sent: Thursday, September 08, 2011 4:17 PM To: Colleen Bezanson Subject: 38 Hunters Run Planned Shed Installation Narration Hello Colleen, I was not able to act on this before the deadline, however, I am OK if my application will be heard on the October meeting. Below are my narrations of the questions from the form that I have. Please let me know if I need to elaborate more on each item. Kind Regards, Luisito (A) Detailed Plan of the Proposal (B) Brief Description of the Proposed Project The proposed project will install a 10X10 Shed in the wetland area in the premises of my property. (C) Narrative description of activities to take place on the property My wife and I decided to put up a shed in our backyard so we can put yard and power tools outside our house. Currently, our yard tools are stored either in our basement or in our garage. Right now, we are using our basement to store our mower and the grass clipping leftovers smells bad. We intend to use our basement to be a usable living area where we can store food and dry goods. We also use it to store our patio furniture during winter to protect them from the elements during the cold season. We tried considering to put the mower in our garage during the winter season, but it proved to be harder for us to get into a very cold car during the winter season. We try not to start the car idle just to warm up the interior of the vehicle. Our alternative to setup the shed is on the border of the wetland area. However, we observed that the area we initially thought is the path of water especially during heavy rain since it’s a down slope from the curb side. It might be more dangerous and expensive for us to setup the shed on the initial location, hence deciding to find a much stable place in our yard. This, unfortunately, is within the wetland area. However, this area is flat and dry, not even the water come near the area. The 10X10 shed will be bought from HomeDepot in Montville and as it has been described to me by the store associate, it is already a pre-built unit that will be assembled in my yard on the delivery date. The assembly will not take more than a day to finish and the use of mechanical tools may not be necessary. (D) Errosion and Sediment Control Narrative Checklist The purpose of the project is to install a wooden shed in my property, which will be on the wetland area. The shed will be a 10X10 unit that will hold all the yard tools like lawn mower, grass trimmer, and other gardening tools. The total area of the project site will be 12X12 or 144 sq feet. The construction will require little digging if none at all since the shed will be setup on top of cinder blocks or whatever the installer will use to make the footing level. There’s no need to perform clearing or grading since the area is already free of any obstacle and is almost level. The drainage is not necessary because it doesn’t have any water connection. The shed installation should be completed in one day since it’s a pre-built, and the shed will be setup during the October/November 2011 time frame. <CAGCVs415z4S4dnoaqg_FAxxjwo6F6qYMjtP9kc7mJHPMPqSXUg@mail.gmail.com> <CAGCVs423sPYDnq-EQGxT9i1Zk=aKrCOJiaQ2=ubotNsdPg1DOg@mail.gmail.com> <818567CC629AFB4AB8DB80CB6F3FDD9A03C0C6235A@VA3DIAXVS791.RED001.local> <818567CC629AFB4AB8DB80CB6F3FDD9A03C0C6235A@VA3DIAXVS791.RED001.local> Re%3A 38 Hunters Run Planned Shed Installation Narration.EML Colleen Bezanson urn:content-classes:message Anonymous VA3DIAHUB051.RED001.local vps-25(zz9371Ke6eL1be0Lf01Mc85eh1432N98dKzz1202hzz8275bh8275dhz2fh5fh2a8h668h839h8e3h) v=1; a=rsa-sha256; c=relaxed/relaxed; d=gmail.com; s=gamma; h=mime-version:in-reply-to:references:date:message-id:subject:from:to :content-type; bh=cJ7GmANi+1WM0+d+gsiC35 vfXFUG7ajYcxsPwjGLmqA=; b=fhzR/RdkkBC/TghrFRjChDiCz7Q9iXh67PEcIMJxPoVN+6i7W2ld4D8IyHpEKw+D+u wbYQdzY1YAa9ndJfvWef6KF37VgoS9FdalF4DttSL75xMfaJwMYplOrmwusgvnp3LCJ4 By3SZi8fHeg5vm+8i/BmS9lA183I2elHT+K78= -25 pass (mail36-db3: domain of gmail.com designates 209.85.214.46 as permitted sender) client-ip=209.85.214.46; envelope-from=luisito.nopal@gmail.com; helo=mail-bw0-f46.google.com ;6.google.com ; 13, CIP:209.85.214.46;KIP:(null);UIP:(null);IPVD:NLI;H:mail-bw0-f46.google.com;RD:mail-bw0-f46.google.com;EFVD:NLI Colleen Bezanson EX /O=MICROSOFTONLINE/OU=EXCHANGE ADMINISTRATIVE GROUP (FYDIBOHF23SPDLT)/CN=RECIPIENTS/CN=Cbb51d09-0908-4134-aecd-a8c49fc60807 CBezanson@montville-ct.org Colleen Bezanson