Loading...
HomeMy WebLinkAboutSite PlanAREk —1 r \ \ .. 66 4 PV as T -. T H / H iv s �� 500 G L. �, ti ."BENCHMARK"';: .� i1 A _ � SDR � 1 r NTS` TAIV K TRAVERSE P 0 I \ / MAPREFERENCE: 1. PLAN OF PROPERTY "PREPARED FOR MARK., FREDRICK RUSSELL 143 SIMPSON ;LANE MONTVILLE, CONN. PREPARED BY .BERNARD F. STONE & ASSOC., INC. PL.AINFIELD' -CONN., SCALE: 1 "=100', DEC. 1978. 2. RESUBDIVISION PLAN LOT 13 PIRES:SUBDIVISION SECTION 11 PIRES DRIVE, MONTVILLE, CONN. PREPARED FOR MANUEL PIRES OWNER & DEVELOPER, SCALE: 17 tl00% APRIL: 81, BERNARD F. STONE AND ASSOCIATES, ` INC. G NERAL NOTES 1. ALL WORK AND MATERIAL (SEPTIC TANK, DISTRIBUTION BOX, PIPE) SHALL CONFORM TO THE CONNECTICUT PUBLIC HEALTH CODE REGULATIONS AND STANDARDS FOR SUBSURFACE SEWAGE DISPOSAL SYSTEM. 2. SEWER LINE FROM FOUNDATION WALL TO SEPTIC SHALL BE 4 SCHEDULE 40 PVC - ASTM 1785 AND JOINTS PER HEALTH DEPT. CODE. 3. TRENCHES SHALL BE SET LEVEL FOR ENTIRE LENGTH AND HAVE 'A CENTER TO CENTER SPACING OF 9 FEET. 4. PIPE FROM SEPTIC TANK TO DISTRIBUTION LINES SHALL BE 4" SOLID PVC CONFORMING TO ASTMD-3034 AND SDR -35. r= 5. THERE ARE PRESENTLY NO KNOWN WATER WELLS WITHIN 100' OF THE PROPOSED SEPTIC SYSTEM. 6.. TOPOGRAPHY SURVEY PERFORMED BY CLA ENGINEERS, INC. A VERTICAL BENCHMARK WILL BE PROVIDED WITHIN 100 FEET OF THE PROPOSED HOUSE LOCATION PRIOR `TO THE START OF CONSTRUCTION. 7. CLEAR AND GRUB THE AREA WHERE THE SEPTIC, SYSTEM, AND HOUSE ARE TO BE CONSTRUCTED. ALL TOPSOIL 'IS TO BE STRIPPED AND STOCKPILED FOR FUTURE USE. 8. ALL FILL MATERIAL SHALL BE CLEAN EARTH FREE OF STUMPS, ORGANICS, CONSTRUCTION DEBRIS AND TOPSOIL, 9. TOPSOIL SHALL BE RE—APPLIED OVER ALL FILL AREAS AND ALL DISTURBED AREAS TO PROVIDE A MINIMUN DEPTH OF FOUR INCHES, 10. ALL EXISTING UTILITIES TO BE ACCURATELY LOCATED PRIOR TO CONSTRUCTION. CALL BEFORE YOU DIG: 1-800--922-4455. 11 • IF BLASTING IS REQUIRED A PRE—BLAST SURVEY WILL BE REQUIRED. 12. FOUNDATION DRAIN PIPE FROM HOUSE TO CATCH BASIN SHALL CONFORM TO TABLE 2—C OF THE CONNECTICUT PUBLIC HEALTH CODE REGULATIONS AND STANDARDS FOR INSTALLATION WITHIN 25 FEET OF A SEWAGE DISPOSAL SYSTEM. 13.' PRIOR TO CONSTRUCTION, THE HOUSE AND ,SEPTIC SYSTEM ARE' TO BE STAKED ; BY A LICENSED LAND SURVEYOR. TEST HOLE DATA: PERFORMED BY UNCAS HEALTH DISTRICT RECORDED OCTOBER 25, 2001 0-5" TOPSOIL 0-6" TOPSOIL Q--4.' -TOPSOIL 5 !d -COARSE RSESA!0 N C-31" .SUBSOIL . �€ i v CvCOARSE,.SANG . .; f . & GRAVEL 31"-76" COARSE SAND & GRAVEL & GRAVEL NO LEDGE N0 "LEDGE NO WATER NO LEDGE NO WATER NO MOTTLING NO WATER NO MOTTLING NO MOTTLING 0-5" TOPSOIL 0-8" TOPSOIL 0--10" TOPSOIL 5"-24" SUBSOIL 8"-34" SUBSOIL 10"-27" :SUBSOIL 24"-77" COARSE SAND 34"-85" GRAVEL 27"-86" GRAVEL & GRAVEL NO LEDGE NO LEDGE NO LEDGE N0 WATER NO WATER NO WATER NO MOTTLING NO MOTTLING NO MOTTLING TH#48 9 0--8" TOPSOIL 0-7" TOPSOIL 8"-34" SUBSOIL 7"-30" SUBSOIL 34"-83" GRAVEL 30"-86 GRAVEL NO LEDGE NO LEDGE NO WATER 11 NO WATER NO MOTTLING NO MOTTLING PERCOLATION DATA: PERFORMED BY UNCAS HEALTH DISTRICT PERC. "F" (TEST HOLES 21-24) = 7.5 MIN./INCH RECORDED 12-14--2001 DESIGN DATA: PROPOSED 5 BEDROOM RESIDENCE REQUIRES 760SF LEACHING AREA PROVIDE 2-130' TRENCHES @ 9' O.C. WITH ENDS CONNECTED EFFECTIVE LEACHING AREA = 780 S.F. PROVIDE 1500 GALLON SEPTIC IANK MLSS NOT APPLICABLE 50' 0 �o• loo' SCALE: = — 1.....50 ROAD I n� � PUBtJC ���wt�iir�fl iw fir! r� 4 . Q SEPTIC _ . 82 � i s LEGEND . tt��„tr o 18 6 " . r-rl . O° o w t� o _ - " 20 f N F NOW OR FORMERLY . �c .. INLET , .4, o °° I I BAFFLE t MORE OR LESS 4 MINIMUM' oo " 6 WALLS t — 4 ,► _ 1 OUTLET .- FILTER DEVICEOUTLET REC. RECOVEREDLIQUID y .LEVEL, o c� I FILTER' FABRIC -- 4 L.P. P.V.C. 6 MON. MONUMENT PIPE SEAL SPECIAL RIPRAP EXISTING CONTOUR 2 - STONE CONFORMING :. 4 P L. . P.V.C. PIPE SEAL PROPOSED CONTOUR _ TYP. 3 PLACES CROSS > ES CTIO{y VIEW Q- PLAN VIEW TH TEST HOLE ti ANI ®TRACKINGW 1X0.0 TIC TANK F WETLAND FLAG co co c� NOT TO SCALE NOT TO SCALE WOODS LINE MAPREFERENCE: 1. PLAN OF PROPERTY "PREPARED FOR MARK., FREDRICK RUSSELL 143 SIMPSON ;LANE MONTVILLE, CONN. PREPARED BY .BERNARD F. STONE & ASSOC., INC. PL.AINFIELD' -CONN., SCALE: 1 "=100', DEC. 1978. 2. RESUBDIVISION PLAN LOT 13 PIRES:SUBDIVISION SECTION 11 PIRES DRIVE, MONTVILLE, CONN. PREPARED FOR MANUEL PIRES OWNER & DEVELOPER, SCALE: 17 tl00% APRIL: 81, BERNARD F. STONE AND ASSOCIATES, ` INC. G NERAL NOTES 1. ALL WORK AND MATERIAL (SEPTIC TANK, DISTRIBUTION BOX, PIPE) SHALL CONFORM TO THE CONNECTICUT PUBLIC HEALTH CODE REGULATIONS AND STANDARDS FOR SUBSURFACE SEWAGE DISPOSAL SYSTEM. 2. SEWER LINE FROM FOUNDATION WALL TO SEPTIC SHALL BE 4 SCHEDULE 40 PVC - ASTM 1785 AND JOINTS PER HEALTH DEPT. CODE. 3. TRENCHES SHALL BE SET LEVEL FOR ENTIRE LENGTH AND HAVE 'A CENTER TO CENTER SPACING OF 9 FEET. 4. PIPE FROM SEPTIC TANK TO DISTRIBUTION LINES SHALL BE 4" SOLID PVC CONFORMING TO ASTMD-3034 AND SDR -35. r= 5. THERE ARE PRESENTLY NO KNOWN WATER WELLS WITHIN 100' OF THE PROPOSED SEPTIC SYSTEM. 6.. TOPOGRAPHY SURVEY PERFORMED BY CLA ENGINEERS, INC. A VERTICAL BENCHMARK WILL BE PROVIDED WITHIN 100 FEET OF THE PROPOSED HOUSE LOCATION PRIOR `TO THE START OF CONSTRUCTION. 7. CLEAR AND GRUB THE AREA WHERE THE SEPTIC, SYSTEM, AND HOUSE ARE TO BE CONSTRUCTED. ALL TOPSOIL 'IS TO BE STRIPPED AND STOCKPILED FOR FUTURE USE. 8. ALL FILL MATERIAL SHALL BE CLEAN EARTH FREE OF STUMPS, ORGANICS, CONSTRUCTION DEBRIS AND TOPSOIL, 9. TOPSOIL SHALL BE RE—APPLIED OVER ALL FILL AREAS AND ALL DISTURBED AREAS TO PROVIDE A MINIMUN DEPTH OF FOUR INCHES, 10. ALL EXISTING UTILITIES TO BE ACCURATELY LOCATED PRIOR TO CONSTRUCTION. CALL BEFORE YOU DIG: 1-800--922-4455. 11 • IF BLASTING IS REQUIRED A PRE—BLAST SURVEY WILL BE REQUIRED. 12. FOUNDATION DRAIN PIPE FROM HOUSE TO CATCH BASIN SHALL CONFORM TO TABLE 2—C OF THE CONNECTICUT PUBLIC HEALTH CODE REGULATIONS AND STANDARDS FOR INSTALLATION WITHIN 25 FEET OF A SEWAGE DISPOSAL SYSTEM. 13.' PRIOR TO CONSTRUCTION, THE HOUSE AND ,SEPTIC SYSTEM ARE' TO BE STAKED ; BY A LICENSED LAND SURVEYOR. TEST HOLE DATA: PERFORMED BY UNCAS HEALTH DISTRICT RECORDED OCTOBER 25, 2001 0-5" TOPSOIL 0-6" TOPSOIL Q--4.' -TOPSOIL 5 !d -COARSE RSESA!0 N C-31" .SUBSOIL . �€ i v CvCOARSE,.SANG . .; f . & GRAVEL 31"-76" COARSE SAND & GRAVEL & GRAVEL NO LEDGE N0 "LEDGE NO WATER NO LEDGE NO WATER NO MOTTLING NO WATER NO MOTTLING NO MOTTLING 0-5" TOPSOIL 0-8" TOPSOIL 0--10" TOPSOIL 5"-24" SUBSOIL 8"-34" SUBSOIL 10"-27" :SUBSOIL 24"-77" COARSE SAND 34"-85" GRAVEL 27"-86" GRAVEL & GRAVEL NO LEDGE NO LEDGE NO LEDGE N0 WATER NO WATER NO WATER NO MOTTLING NO MOTTLING NO MOTTLING TH#48 9 0--8" TOPSOIL 0-7" TOPSOIL 8"-34" SUBSOIL 7"-30" SUBSOIL 34"-83" GRAVEL 30"-86 GRAVEL NO LEDGE NO LEDGE NO WATER 11 NO WATER NO MOTTLING NO MOTTLING PERCOLATION DATA: PERFORMED BY UNCAS HEALTH DISTRICT PERC. "F" (TEST HOLES 21-24) = 7.5 MIN./INCH RECORDED 12-14--2001 DESIGN DATA: PROPOSED 5 BEDROOM RESIDENCE REQUIRES 760SF LEACHING AREA PROVIDE 2-130' TRENCHES @ 9' O.C. WITH ENDS CONNECTED EFFECTIVE LEACHING AREA = 780 S.F. PROVIDE 1500 GALLON SEPTIC IANK MLSS NOT APPLICABLE 50' 0 �o• loo' SCALE: = — 1.....50 I n� No. Date Revision ���wt�iir�fl iw fir! r� 4 GE M. .� Q SEPTIC _ . 82 • • Z: • =� No. 20847 v i s tt��„tr FLAN