Loading...
HomeMy WebLinkAboutSite PlanDESIGN DATA REQUIRED 6T %3 Tlc -r 1 4 '2 !.j� . - g ij 0, LIE D A - I --- - IE 11 tT Jr -A 2-1. PRIMARY SYSTEM: PERC TEST DATA PERCOLATION RATE: 10 TO 20 MIN/IN (15 MIN/IN) b 5 bt'u -n or rIn—/�- �3rb 3: REPAIR �S-)HOP 6 EMPLOYEES @ 25 GPD= 150 GPD ON APRIL 19, 2004 510 GPD A P1 lWj ION GP" -D If -ter JIM - Ain. I - `5 DEPTH REQ. rr--'Frr--rr--CTI'V'rr_- LEACHING AREA 3 Ol FT, (510 GPD)/(1.2 GPD/SF) = 425 SF PRESOAK AT nR it. 21-9 A 19' -01t4CRETE LEACHIN11- TH---j- 3A A r E- Flr-_'CTrVE_ LE HING REA OF GALL'RY 5.9 I -Ar - S)r/ r LENGTH OF TRENCH REQUIRED = F )/( 5�9 SF/LF1' I A - L- - DEPTH TO Rrr---'3-TRICTI'V"rr_- LAYER: 23" SLOPE: 1.7% VF T P-Clkl K B ROV N FI1N.E MLOAWt HF _5 FF --1.7 PF= -I;.5 12:54 10.0 I Ll USE ONE ROW OF 145 LF SANDY LOAM LEACHING AREA PROVIDED = 8515115 SF - 14" RESERVE SYSTEM: 2---AF"-82" BROWN & GRAY BROWN GRAVELLY LOAMY SAND USE SAME DESIGN AS PRIMARY SYSTEM - 14 TH #3C 86" TOTAL DEPTH f n a;-3' RDF! - 10"-2 L Ou M r16 N F J 14 W 11 1 E S; k rN j-&-, Y U fl -- 10"- 23" SUBSOIL, STRONG BROWN GRAVELLY SANDY LOAM 23"-86" BROWN %8-1. (-',PAY BROWN GRAVELLY LOAMY SSAND W/BROWN 3WMOTTLE---laS NO BEDROCK WATER 0 73" WET @ 23" TH #13D BR NONE WATER 359" TD 72" M - SANDY LOAA -r—L --Rv E -RI -6 E71 L- -.Wil I P J1 UA 1, b UNN j 6-25'- SUBSOIL STRONG BROWN SANDY LOAM 25-72" BROWN 'GRAVELUY LOAMY SAND WITH MOTTLES ml*m rod REQUIRED PROFNDSED Tlc -r 1 4 '2 !.j� . - g ij 0, LIE D A - I --- - IE 11 tT Jr -A 2-1. '0 !_31. �J:Os PERC TEST DATA TEST HOLES RECORDED BY ROBERT RUSSO 200 FT PERC 3: Lliliz- E ON APRIL 19, 2004 F-4 SIDE YARD SETBACK TOTAL DEPTH - 24" 3 Ol FT, 161 Fr. PRESOAK AT 10:00 TH---j- 3A 82" TOTAL DEPTH r VF T P-Clkl K B ROV N FI1N.E MLOAWt -4 12:54 - 13" 8"-23" SUBSOIL, GRAVELLY STRONG, BROWN SANDY LOAM 12:59 - 14" 2---AF"-82" BROWN & GRAY BROWN GRAVELLY LOAMY SAND 1:04 - 14 1/2 -RR0'vVN & GR 'SOT TLES 1:09 - 15" NO BEDROCK 1:14 - 15 1/2" WATER @ 76" WET @ 231" LING a -3 1:24 - 16 1/4o 1:29 - 16 1/2" T H, 3 B 1:34 - 17" 1:39 - 17 1/2" BR NONE 1:44 - 17 3/4" WATER 34" 1:49 - 18" 7 mi to T ! LE 2 TD 80 USE LAST 30 MINUTES F R 0 I'A, I : 19 T 0 1:4� - 9-" DROP 0� 0, P' -F' x 3.5-Rl "A"' FINE "ANDY I 0-AkA 30 MIN / 2 IN = 15 MIN/IN 9-29" SUBSOIL STRONG BROWN SANDY LOAM lw/ == 10 TO 20 MIN/IN SILT AND COBBLES 29-RATE C- A iA , 29-34 (3313" AIND --D- ID" 0101 11" NDY LOAM't-11 t OTT E- AN ID mpkvt GRJ AND 0 BRO-N Z.) vill' SAA ND V"v'Al `L w/ ;MOTTLES TH #3C 86" TOTAL DEPTH f n a;-3' RDF! - 10"-2 L Ou M r16 N F J 14 W 11 1 E S; k rN j-&-, Y U fl -- 10"- 23" SUBSOIL, STRONG BROWN GRAVELLY SANDY LOAM 23"-86" BROWN %8-1. (-',PAY BROWN GRAVELLY LOAMY SSAND W/BROWN 3WMOTTLE---laS NO BEDROCK WATER 0 73" WET @ 23" TH #13D BR NONE WATER 359" TD 72" M - SANDY LOAA -r—L --Rv E -RI -6 E71 L- -.Wil I P J1 UA 1, b UNN j 6-25'- SUBSOIL STRONG BROWN SANDY LOAM 25-72" BROWN 'GRAVELUY LOAMY SAND WITH MOTTLES ml*m rod REQUIRED PROFNDSED ON SITE '0 !_31. �J:Os o'D i 8 C r 9-- QX. LOT FRONTAGE 200 FT 238 FT lMC-jjqT "RD SEET8 K Lliliz- E 69 r T ' F-4 SIDE YARD SETBACK 0 FT 51 FT. t REAR 7�ARID SETIBACK 3 Ol FT, 161 Fr. FBLDG HEIGHTS 50 FT 24 FT PARKING REQUIREMENTS: Hcv: 36, GARAGE: 3 SERVICE STALLS X 2 = 6 SPACES TOTAL SPACES = 22 SPACES .SEPTIC -SYSTEMI NOTES: 1. THE BUILDING, SYSTEM AND WELL ARE TO BE STAKED B YA - /-% -LICENSED SURVEYOR PRIOR TO THE START OF CON STRUC T.1 ION. 2. MANUFACTURER TO CERTIFY THE SEPTIC TANK WATERTIGHT. 3. A BENCHMARK IS TO BE SET, NOTED ON THE PLAINI, AND PROVIDE -D" TO UNCAS HEALTH DISTRICT, PRIOR TO THE START OF CONSTRUCTION. rNO �F-L OR DRAINS -3 WILL BE 5. NO FOOTING DRAINS-) ARE TO BE INSTALLED. 6. A.FTER THE FILL IS PLACED AND COMPACTED, I T MUST BE PERC TESTED PRIOR TO INSTALLATION OF THE SYSTEM. 6 5 4 3 2 m Chesterr' 1-,- W Da -198 Pand W-1 A 41 j_ z A L N. Ld% t7l p � PROJECT t --:N N s-ff F I -A 7a, IN a I LAUS I 1010--A! FA -1 As -Pa SCALE: 1""=1000" N, t. 44 �-- lake K&Ywmos TWCCCWvi-- BE NO HAZARDOUS 101,AkSTILE-- IMIATERIA-d-s STOKED ON SITE 2. ANY PAINT QR. MOTOR vll.� IV pv- l�-;x-firvRARY KEPT ON SITE, WILL BEST OREID IN CORNIER OF THE REAP nc� THE Sl04UF'7HWE--s-I %., 1-1 IN -.-I I U- I % %.,I Lliliz- E 10/11/061 APPROVED PLANS 10/15/06 FEN -.'.iii 9/28/06 STATE COMMEINITS 8/7/06 REVIEW COi-]'lmjC!jN;'Tk7"j 6/28/06 UNCAS HEALER DISTRICT C011MEN11"S 6/15/06 ADD STORAGE UNITS Date t q -Jvjvj�� NN S No 18346 NAL. A 4T SCALE: '1'=2()' =nwineers, CIVIL STRUCTURAL - SURVEYING 317 Main Street INTorwich, Connecticut (8 04 a86.-1966 FAa-x (8 60) 88!6-9!6'5 LOT 3 � L"'MRARD1 -BU4011NESS RARK %J - - - IV - - I NO '-w—w ku — XlllvRmw- eran. -4. Project No. Prof. Engineer fl� E'.M�B 411/25/046 I 2� OF BARS PREPARED PLAT` BACKFILLED IN k - 1 4;--..; 'UNILY JU WATERIED, SUFFICIFIF-f-I hi, rri-nR-C_)b1(GHLY` SERILE SO w THAT NO AIR POCKETS ARE PRE SENT BALL DIAMETER 1< pa -j — ,fie ��J e SIDES OF BALL mr"M 4znll __ __ P11 r! :D Z5HH_Ub AN NIJ A L NOT TO SCLF Chesterffetd INN Am 41, Jr� N IV Jw, 'y x-� N� tot U PROJECT E A rfani� d LA a Uma -4i S)CALE: 133=1000' E!r% L j &AN DR r,,.APr- r0 2� Kp 5otandcal Name Cammon Name: Pecic-iucus 5hade Treess FF Fra inns Penneqlvanica "Marel-olls Seedles8" Marshall;, SICdiesAeh 8 ,.+-rub5 iG -C_�,!�mflarta Rc Rhododendron x 'Chinoldei' Rp Rhod. pouk-anensis 'Compacta' DO NOT HFAIALY PRUNE THE TREE AT P[ANTIN'G. PRUNE ONLY CROSSOVER LIMBS CO -DOMINANT LEADERS, AND BROKEN OR D BRANCHES. 04ME INTERIOR TWIGS- ANQ LATERAL BRANCHES PM-A'f EZ,PRUNE93, P�7;fi0ER DAN) ; V OE - REMO%iE 1 q A L_ B BRANCHES TPATT 1U, MR Ds Oc' EXTEND TO THE iF EDGE OF Tr &_ - cRgNN, 5rA�E- 4_er- -Jr lj� T,;7 .10�p �U-S Of FOR OF THE LANDSC E ARF`CHf 11 r_ WRAP TREE TRUNKS ONUf UPON THE APrHEC-RAL 101-1- THE L)4415WUAPE ARCWIECL MARK THE NORTH SIDE OF THE TREE IN -1;1 URS ZRf#._&,ID__R0TATF_ TREE rV rim N004 AT THE SE WOM POSSIBLE SET TOP OF ROOT BALL FLUSH TO 200 MM (a INA f Lake Kommos 1Z QUA" s=1 All Chinoldes Rhododendron 3 gal. Compact Korean Azalea 2 ga I- nk -,F-1, - `� TF::E < PS P! ,-A: UC -14 I "T TIRE 0LE' 'IdE T&P OF THE ROOT BAIL. TREES WHERE THE TRUNK FLARE IS NOT VISIBLE SHALL BE REJECTED. DO NOT COVER THE TOP OF THE ROOT a&L TVI­ITj_- irykil -11 -aVL_ I GO MMIN.) HIGH EAPI H SAUCER BEYOND E OF ROOT BALL. 50 MM (2 IN.) MULCH. DO NOT PLACE __�'Vl -t (;? I I MULCH IN CONTACT WITH TREE TRUNK. 1 11&J i 1,, ppr-p -(-'P ? i 1 -L REMOVE ALL 'it, MAIMAIN THF IM111-11ILCH . AE ­D_ -FINE r TW 'E, R�01K� AND !REAIN i 'LAP 1001P i,!AU P ­n k f 'AV h ;? HS A MRN _FH E YEAPR'33 LER PUNN'I'll I F PLANT IS SHIPPED WITH A WIRE BASKET AROUND THE ROOT BALL, CUT THE WIRE BASKET IN FOUR PLACES AiND FOS WAIN 900 MM (1-3 I. -A N 11MMO PLARRnC_ - A NOTE: FOR TYPES OF SOIL AMENDMENTS, PLACE ROOT BALL ON UNEXCAVATED OR SOIL REPLACEMENT., SEE PLAdNTING OR TAMPED SOIL TUZ) TAM NOT I CALL BASE FIRMLY WITH FOOT PRESSURE SO THAT ROOT Ma DOES NOT SHIFT. A N" DET AIL TREE PLANT! u 1 6/15/06 -ADD STORAGE UNITS ;oto_ Date Revisiori NOT TO SCALE SIF: 1"=20'"' 3CALE AM a -As Ini sm- sn%.. CIVIL - STRUCTURAL - SURVEYING 317 Main Street Norwich, Connecticut (860) 886-1966 Fax (860) 8386-9165. LOT 3 � LOMWAICH! BUSINES.S. IPAE3K F -11- A NA. 1101111111 p . 0 LandscaDru Plan a Project No. 'On 7- Proj. Engineer E.M.Q. D_t . 4/25/06 F_v Fln- 000mr-­1 A EW_14;;�Am ---'' FINISH GRADE 6" MIN. FILTER FABRIC 150. cQvER IN A O ANCE WITH �' o�OcoUOo� o � _ CTI 2.`3- PRECAST CONCRETE 4'x8'x2' 1 p: a 00 " p oQp C/� y• I�.T_ Slb LEACHING GALLERY IN. HEAVY DUTY H-20 LOADING 4" MIN. DEPTH 2" STONESkAowl 09 X15M�N� c C, Q FILTER FABRIC 1"L 12n OVER STRIPPED GROUND - o� (TOPSOIL REMOVED) I 1 00 s" CONSTRUCTION ` NOT TO SCALE" TYPICAL NOT TO SCALE SHOULDER OR PAVEMENT 9" 3" PAVED SURFACE R=2" IN PARKING AREA 2 1/2" BIT. CONC. 1 b 6" 45' NOT TO SCALE WIDTH AS REQUIRED TOOLED JOINT 6" R 1 /4p FINISHED GRADE PAVEMENT FINISH GRADE 4:1_ 4 5" CONCRETE SIDEWALK . O 20" a Q 8" GRAVEL FILL 0 o. o 1 o" Ali + 8" GRAVEL FILL NOTE: MAXIMUM SPACING OF JOINTS 25 FT. 8- JOINT SHALL CONSIST OF BITUMINOUS FILLER APPROVED BY THE ENGINEER. CONCRETE -SIDEWALK WITH INC DE AL (SINGLE POUR) NOT TO SCALE •_ _ �i_i`IiLi!i1I40 IN Ii eNOW-= Iffii!i�ri'i��`s!y1��••i�!'i�i'i�!►'i��!'� .i��a�`i�i�.►�.►�ri�.�`��I#err►����`i�.►r.a�i�������► .i COMPACTEDR. BASE GRAVEL PARKING AREA NOT TO SCALE 6 1/2" LUMINAIRE 250 WATT HIGH PRESSURE BY MWC LIGHTING SANTA ANA, CALIFORNIA OR APPROVED EQUAL BUILDING MOUNTED LIGHTING FIXTURE NOT TO SCALE 8'–fi» 8" TYP. 2 PLACES 4 INLET TYP. 3 PLACES IL n — 21 �' ff II i I II ! -�- � I I i I I I OUTLET I �.. I j i I I 4 L.P. P.V.C. PIPE SEAL u -----H---- -� 4" L.P. P.V.C. PIPE SEAL TYP. 3 PLACES PLAN VIEW 18"DIA. 4 3/4" COVER INLET- - OUTLET „ F� - OUTLET FILTER M B.V3 � t LE !N DEVICE i.• T_ 4'-5 3/4 LIQUID 3" WALLS LEVEL 4 t _ • P ti.. _w� ACROSS sEnou mat 1,000 GALLON SEPTIC NOT TO SCALE STATE APPROVED HANDICAPPED PARKING SIGN TO INCLUDE FINE AMOUNT PAINTED GALVINIZED STEEL PIPE BOLLARD 4" DIA. MINIMUM FINISH GRADE ----- BACKFILL CONCRETE BASE (18" SQ) HAND >> s I 'D PARKING SIGN DE 12" PAPJI* C L6J sum: REOUMM WAMOM NOT TO SCALE co FILTER FABRIC WITH 2"x2"x4a" WOOD STAKE WOVEN WIRE FENCE, INDUSTRIAL NETTING, OR SNOW FENCE FOR SUPPORT rtt rfr` COMPACTED BACKFILL .1 100° FLOW 1, �,�,% _ _- ��%: % r 1•. 12" MIN. NATIVE SOIL f! SILT FENCE SECTION NOT TO SCALE MANHOLES 24" GASKETED MANHOLE ELEVATED COVER (TYP.) H.20 LOADING TO GRADE _-_ - —_... pas .'#,. • A _ . EROSION CONTROL & SEDIMENTATION NARRATIVE 1. PRIOR TO THE INSTALLATION OF ANY EROSION AND SEDIMENT CONTROL MEASURES, THE OWNER AND CONTRACTOR SHALL MEET WITH THE TOWN OF MONTVILLE WETLANDS OFFICER. 2. THE EROSION AND SEDIMENT CONTROL MEASURES SHALL BE INSTALLED PRIOR TO SITE DISTURBANCE. ADDITIONAL EROSION & SEDIMENT CONTROL MEASURES SHALL BE INSTALLED IF DETERMINED TO BE NECESSARY BY THE WETLANDS OFFICER. 3. THE CONTRACTOR SHALL CONTACT THE WETLANDS OFFICER FOR INSPECTION OF THE SEDIMENT AND EROSION CONTROL MEASURES, PRIOR TO SITE DISTURBANCE. CONSTRUCTION SHALL NOT BEGIN UNTIL SUCH TIME AS THE WETLANDS OFFICER HAS REVIEWED AND APPROVED THE INSTALLATION OF THE SEDIMENTATION AND EROSION CONTROL MEASURES. 4. CONTRACTOR TO INSPECT ALL EROSION AND SEDIMENT CONTROL MEASURES AT LEAST WEEKLY AND AFTER EVERY STORM EVENT AND REPAIR AND MAINTAIN AS NECESSARY. 5. CLEARING AND GRUBBING OF THE AREA TO BE GRADED. TOPSOIL TO BE REMOVED AND STOCKPILED IN AN AREA AS SHOWN ON THE PLANS. 6. STAKED HAY BALE SILT BARRIERS OR SILT FENCE SHALL BE INSTALLED AROUND - ANY TEMPORARY STOCKPILE AREAS. 7. TOPSOIL SHALL BE RE–APPLIED TO PROVIDE A MINIMUM DEPTH OF FOUR INCHES_ 8. ALL DISTURBED AREAS SHALL BE SEEDED AND MULCHED. ALL EROSION AND. SEDIMENTATION CONTROL MEASURES SHALL REMAIN IN PLACE UNTIL VEGETATION IS RE–ESTABLISHED. 9. SEEDING SHOULD TAKE PLACE BETWEEN APRIL 1 AND JUNE 1 OR AUGUST 15 AND OCTOBER 1. 10. THE FOLLOWING SEEDING MIXTURES SHALL BE PROVIDED ON ALL DISTURBED AREAS: KENTUCKY BLUE GRASS 20 LB's/AC CREEPING RED FESCUE 20 LB's/AC PERENNIAL RYEGRASS 5 LB's/AC 11. UNFORESEEN PROBLEMS WHICH ARE ENCOUNTERED IN THE FIELD SHALL BE SOLVED ACCORDING TO CONNECTICUT GUIDELINES FOR SOIL EROSION AND SEDIMENT CONTROL. 12. THERE IS A SMALL AMOUNT OF SEDIMENT PRESENT- WHERE THE' BUILDING ADDITION IS PROPOSED, DUE TO VEHICLE RINSING. THE VEHICLE REPAIR WILL BE ELIMINATED PRIOR TO THE CONSTRUCTION OF THE BUILDING ADDITION. EXIST. GRADE 8� 24" r; 15" RCP 15" RCP ' STATIC LIQUID LEVEL = INLET OUTLET TO DRAINAGE SYSTEM l `` -- WATERTIGHT EXTERIOR • SEALED �' PROTECTIVE JOINTS 6 INCH MIN. COATING 3..5' MIN.– ---1000 GALLON ALL N INTERIOR PROTECTIVE CONCRETE TANK COATING 4 TO 6 INCHES THICK 18" 1000 GAL OL/GR NOT TO SCALE INSTALL HANDICAPPED % PARKING SIGN (NP.) 2:1 SLQPE. GRAVEL FILTER STONE CHECK DAM NOT TO SCALE i • •. •� � • ` *AI �• ii r l���s� � r FRIw �_#�ww lop 2:1 SLQPE. GRAVEL FILTER STONE CHECK DAM NOT TO SCALE