Loading...
HomeMy WebLinkAboutExpansionI JANUS / ~~ / ' 100 o 100 ' zoo SCALE: 1"=1O0` LOCATION [ SCALE/ 1«=2000/ K]OT[-S~ A = SBR`s #1 — #4 represent 4.8 rngd of hydraulic capacity but are 10;3 overloaded organically. B = SBR �� la for the existing 10% of organicoverloading ` /Q3� nng'WSR's 2001 expansions (0.4 ' mgd), an approximate 50'000 gpd increase in water usage de to the Phase 5 and 6 water projects and 10% reserve capacity per DEP (0.0 rngd vm/5 SBR s) C = SBR #6 is for k4SR'a 2002 expansion /0'8 rngd\' o projected |nonsuse in water usuage in the Phase 5 and 8 men/|co areas through 2015 /0.3 n -d\ and 10% reserve copoo|tv per DEP /0.72 mgd w/6 SBR's\. O = SBR"m #7 & #8 will allow for on additional 2'1 rngd of oopodtv with the remaining 0.3 rngd fulfilling the entire plant's 10% reserve copoo|tv requirements.' E = Blower bldg. to support SBR`o #5 — #8. There will be other plant upgrades required (chlorination, sludge and solids handling, etc.) to support the 4 SBR expansion but this will be additions to existing fooY||tims at their present |000tlmnn not requiring additional off—site land.