Loading...
HomeMy WebLinkAboutProposed Drainage System0) 14-- 4- 0 I CD r I (D CJ I 0 r_— I 0 c N f—I [L7 I P� CC) Co C= C7 4 -1L - C) r 0 +-J t Cu ED Co 0 CG 0 r_ N -N CL1 D H ' [CI H ; Q Cfl v 0 >J OD y- 0 0 W" /'Al T !� ` G�' r r r r r r r i r r r r r % ! LOT LOT 7 17ZZZ oz vo-_-T IF 1 L CN L -- t , - PRbP\OSED DRAINAGE EASEKNT AND RIGHTS TO DRAM _ FOR LOTS ui ! ! 206 LF 231.0 uj -I- LLJ - �-- �— j _ % �;, 15" HDPE 206 LF -- `� --- -` j._ �- --1- -- ��� ���,��§,,�� 1875 HDPE 2259 LF It`Iv.=228.25 � V� 2+po /a / _ 18 HDP E tci �� k — -- a.. 4 90. - .;,: = fe+pp fl ��\ 0 t\ 1� J� it /� /�� l m /t 1� _ f� /�t / 0 ✓ .,t. iV` i ��'[``r`;•ii`.}�f' ��t � , __ `, <�.y� ._�i-�'l, _ YXC' ' C� 1Cl Y ''i�(r � {r Y. Y' C '' _l_.�- {ttiik{,ti. _-.4„a+'C C� CY COY CSSS�•C` ... K' > j” , WN ROAD _ *'' t �� �- 233.E 2 1.9 230.3 229.7/ i - `Y rte \,r ,NFT _ --- Nr i f rr, C �s —y ..�% 4009 r � 12"RCP +� U W �911� P _y --r { INV.=226.93 V l c TYPE55 D—G55 ENDWALL �_ - - }5 --- 5, ��-- �-.- ---- ��,E „D -G„ ENDWALL STA. 3+30 _ -- TYPE D—G ENDWALL ``- -- INV -=227.46 ` STA. 7+50 ui TF— 234.1 --STA.-5+40 TF— 230.4 -`"f�---- PROPOSED ROADWAY WIDENING INV.=231.5 TF=232.1 INV.=227.8 f AND RESURFACING ASSOSIATED INV•=229.5 'f WITH THE "LOMBARDI BUSINESS Q PARK SUBDIVISION" PLAN:L TO SCALE: HORIZ: 1"=40' 240 238 236 234 232 230 228 226 224 222 220 218 216 { SCALE: HORIZ: 1 "=40' VERT: 1 "=4' w z w w 0 0 a) w z J Z H Q (ow"o A Tm 10 N M Am"a OF` I HAVE DELINEATED THE WETLANDS ON THE PROPERTY IN THE FIELD AND HAVE REVIEWED THE WETLANDS AS SHOWN ON THE PLAN AND FIND THAT THEY SUBSTANTIALLY REPRESENT THE WETLANDS AS DELINEATED IN THE FIELD.. ROBERT C. RUSSO HATE CERTIFIED SOIL SCIENTIST &CLAN Enw-m-ineers, Inc. CIVIL - STRUCTURAL - SURVEYING GENERAL NOTES: 1. ALL PROPOSED WORK MAY BE VARIED IN THE FIELD BY THE OWNER TO 30 ,y a" WF1-17 WF1 _ � MATCH EXISTING CONDITIONS. 2. UPON COMPLETION OF THE WORK, ALL DISTURBED AREAS SHALL BE RESTORED TO A CONDITION EQUAL TO OR BETTER THAN EXISTED PRIOR TO CONSTRUCTION. I TF N ` _ .® 3. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY DAMAGE TO Ij ! �ROVIDE S L E GE / .4." EXISTING PAVEMENT AND ROADWAYS, AND SHALL REPAIR SUCH BAKED BY HAYBALES . . , = W�. � DAMAGE AT NO ADDITIONAL COST TO THE OWNER. Wr#1-1$ LOT 11 4. IF BLASTING IS REQUIRED A PRE -BLAST SURVEY WILL BE REQUIRED. fes! 'NF1- 9 �, 1 f /' ( , w / 5. PRIOR TO BIDDING THE PROJECT, THE CONTRACTOR SHALL VISIT THE SITE f. WF#1-1 TO VERIFY EXISTING CONDITIONS. ,� f f .� f f f f f f ' 1 '4 W / 6. CONTRACTOR SHALL CONTACT "CALL BEFORE YOU DIG" 1-800-922-4455 AgEA PRIOR TO THE START OF CONSTRUCTION. �WF�1-20 ' 7. INFORMATION SHOWN ON THE DRAWINGS RELATING TO MATERIALS, CONDITIONS. ` I / PROVIDE t . W"y 'w' AND OR LOCATIONS OF EXISTING STRUCTURES AND UTILITIES HAS BEEN ,�,':' F#-2$ ;� 2�3.� . . COMPILED L _ / 24 FEU a .t, r - ED FROM AVAILABLE INFORMATION INCLUDING FIELD SURVEY, UTILITY PROPOSED DRAINAGE �,- INV._. END GRASS LINED �. WF1-2r AND COMPANY TOWN RECORD MAPS AND DRAWINGS, AND IS NOT GUARANTEED LLj- DRAINAGE SWALE �WFj 27 y ACCURATE OR COMPLETE. ,-� EASEMENT AND RIGHTS �- / `.--, TO DRAIN FOR LOTS '"` �.=22.4.1 1 ti `� `~-�. 8. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE TEMPORARY AND PERMANENT - ��� �� LF - E SUPPORT OF ALL EXISTING UTILITY POLES IN AND ADJACENT TO THE CONSTRUCTION ' �` ` 1 Di' 211 LF �`` - `' 24" HDPE`+'-,WF1 2 AREA AND SHALL COMPLY WITH ALL THE REQUIREMENTS AND SPECIAL DETAILS -'" i� W �''6 y ° . I; FOR THE SUPPORT OF UTILITIES REQUIRED BY UTILITY AGENCIES. _--- 24 HDPE WF# -23 9. ALL STREET SIGNS MAILBOXES, PLANTINGS, ORNAMENTAL OBJECTS, LIGHTS, 0 ` " ` - - - - -- - y ! LANDSCAPE SHRUBBERY, ETC., SHALL BE PROTECTED FROM DAMAGE AND SHALL 220.5 r- "C INV.=217.08 BE REPLACED IN THE SAME OR BETTER CONDITION BY THE CONTRACTOR IF 0+00 �` "` -- -` " 14+p °t" r " DISTURBED OR DAMAGED BY THE CONTRACTOR DURING CONSTRUCTION. 12+00r7 11+0 am low WF 1 j WF#I/-2 ' 10. CONTINUOUS DUST CONTROL USING CALCIUM CHLORIDE OR EQUAL SHALL BE Cy)-� ����t 4ow PROVIDED FOR ALL EARTH STOCK PILES, EARTH PILED ALONG EXCAVATIONS AND SURFACES OF REFILLED TRENCHES. XBUTLERTOWN ROAD `�-._�'`� �-- �--` `-- �--- _ �i i / � � a � 11. PASSAGE OF TRAFFIC ON ROADWAYS SHALL BE MAINTAINED AT ALL TIMES. THE _: 229.7 t f --� CONTRACTOR SHALL PERFORM HIS OPERATIONS TO MINIMIZE DISRUPTIONS TO y --y x t I TRAFFIC AROUND THE PROJECT SITE. �(� r'-��`� ' ����229.7 \ ! I 229.1 CONTRACTOR �� 2 t� r� r, 12. IT IS THE DEVELOPERS RESPONSIBILITY TO CONTACT THE TOWN o 1 \ , _ LSI ����'y % \C���r co. ENGINEER TO SCHEDULE PUBLIC IMPROVEMENT INSPECTIONS. _TYPE "D -G" ENDWALL �� - �� �� �,= ,� ,- - �-` i 0577 �( �-- �- '��� HELr Co. � _--� `'--; 13. CONTRACTOR TO BE RESPONSIBLE FOR CONSTRUCTION LAYOUT. STA. 9�3 _ % PROVIDE RIPRAP j �� �- 10576 14. ALL WORK TO CONFORM TO THE STATE OF CONNECTICUT DEPARTMENT OF TRANSPORTATION r , SPLASH PAD f fi I STANDARD SPECIFICATIONS FOR ROADS, BRIDGES AND INCIDENTAL CONSTRUCTION -- TF -229:3 \ L tt + FORM 816 DATED 2004 INV.=226.2 �t�.-_ ,f ' �- - TYPE D -c ENDWALL �� 15. CONTRACTOR TO BE RESPONSIBLE FOR ALL MAINTENANCE AN R L E GE D PROTECTION OF TRAFFIC STA. 12+00 - �- -- J / ,I I ) , i -A AND TRAFFIC CONTROL OFFICERS AS REQUIRED BY THE TOWN. TF --229<5 16. IT IS THE CONTRACTORS RESPONSIBILTY TO FIND STOCKPILE, MATERIAL INV.=22.1 - iNv.=? 16.6 AND EQUIPMENT STORAGE AREAS. EROSIONL & SEDIMENTATIONTI PLAN: BUTLERTOWN ROAD CONTINUED i . "=40' PIPE D=INSiDE DIAMETER OF PIPE ° W bi W W d 0- C14 Lf) ch of 6iLL q PRESHAPE BEDDING TO FIT PIPE CONTOUR W w SIJ ° 12" MINIMUM d' _ d r oo j OVER ROCK 2" GRAVEL WHEN ILL UN UIITABLEFMATERIAL ID E ELEVATION ENCOUNTERED TYP. TRENCH DETAIL TY "D -G" L NOT TO SCALE NOT TO SCALE STt�: 9':'x05 I ___TT�._ �. ` i �E2+ G' Do r�ll I rT_ i o i3 0 � _ T _T _T- _T _r --T--7- I� -r --- i ----i 4" HDPE I+ rI IT 24 I J- HDpE ---------------- LINED DR NNG� C4 C4 cq In C41 C4 cq cq"I 0 10+00 11+00 12+00 13+00 14+00 PROFILE: BUTLERTOWN TI SCALE: HORIZ: 1 "=40' VERT: 1 "=4' 240 238 236 234 232 230 228 226 224 222 220 218 216 1. PRIOR TO THE INSTALLATION OF ANY EROSION AND SEDIMENTATION CONTROL MEASURES, THE OWNER AND CONTRACTOR SHALL MEET WITH THE TOWN OF MONTVILLE WETALNDS OFFICIAL. 2. THE EROSION AND SEDIMENT CONTROL MEASURES SHALL BE INSTALLED PRIOR TO SITE DISTURBANCE. ADDITIONAL EROSION & SEDIMENT CONTROL MEASURES SHALL BE INSTALLED IF DETERMINED TO BE NECESSARY BY THE WETLANDS OFFICIAL. 3. CONTRACTOR TO INSPECT ALL EROSION AND SEDIMENT CONTROL MEASURES AT LEAST WEEKLY AND AFTER EVERY STORM EVENT AND REPAIR AND MAINTAIN AS NECESSARY. 4. STAKED HAY BALE SILT BARRIERS OR SILT FENCE SHALL BE INSTALLED AROUND ANY TEMPORARY STOCKPILE AREAS. 5. TOPSOIL SHALL BE RE-APPLIED WHERE APPROPRIATE TO PROVIDE A MINIMUM DEPTH OF FOUR INCHES. 6. ALL DISTURBED AREAS SHALL BE SEEDED AND MULCHED. ALL EROSION AND SEDIMENTATION CONTROL MEASURES SHALL REMAIN IN PLACE UNTIL VEGETATION IS RE-ESTABLISHED. 7. THE FOLLOWING SEEDING MIXTURES SHALL BE PROVIDED ON ALL DISTURBED AREAS: CROWN VETCH 15 LB's/AC PERENNIAL RYEGRASS 10 LB's/AC 8. SEEDING SHOULD TAKE PLACE BETWEEN APRIL 1 AND JUNE 1 OR AUGUST 15 AND OCTOBER 1. 9. UNFORESEEN PROBLEMS WHICH ARE ENCOUNTERED IN THE FIELD SHALL BE SOLVED ACCORDING TO CONNECTICUT GUIDELINES FOR SOIL EROSION AND SEDIMENT CONTROL 10. NO EROSION AND SEDIMENT CONTROL DEVICES SHALL BE REMOVED UNTIL ALL DISTURBED AREAS ARE -STABILIZED AND REMOVAL IS APPROVED BY THE TOWN OF MONTVILLE WETLANDS OFFICIAL. SILT FENCE FILTER CLOTH FLOW EMBED FILTER CLOTH 8" MIN. INTO GROUND 4" 1" X 1 " X 4' GRADE STAKE HAY BALE, 2 STAKES REQUIRED EACH BALE UNDISTURBED SOIL GRADE STAKES - TWO EACH BALE (TYP.) CONSTRUCTION NOTES: 1. SILT FENCE FILTER CLOTH TO BE SECURELY FASTENED TO GRADE STAKE WITH STAPLES, 6" ON CENTER. 2. WHEN TWO SECTIONS OF FILTER CLOTH ADJOIN ONE ANOTHER THEY SHALL OVERLAP BY 6" AND BE FOLDED. 3. BALES SHALL BE PLACED IN A ROW WITH ENDS TIGHTLY ABUTTING THE ADJACENT BALES. SILFENCE BACKEDY HAYBALES NOT TO SCALE 4" TOPSOIL UNDISTURBED UNDISTURBED AREA AREA 4" CLEAN FILL - ' LOAM & SEED CROSS-SECTIONDETAIL NOT TO SCALE EXISTING GRAI COMPACTED SUITABLE NATIVE MATERIAL OR GRAVEL FILL COMPACTED GRAVEL FILL CONFORMING TO ARTICLE M.02.01 6" MINIMUM OVER EARTH GRASS LINED DRAINAGEL DRAINAGE PIPE 3' NOT TO SCALE MODIFIED RIPRAP 24" THICK PERVIOUS - FILTER FABRIC __r r EXISTING GRADE OR ROADWAY SECTION 4' TRENCH WIDTH NOT TO SCALE 4P-6" 3'-1„ 9 I OPEN -EYE EYEBOLT RJ 1'-0 2'--6 l' -D 3 /2' 3000 psi CONCRETE PIPE D=INSiDE DIAMETER OF PIPE ° W bi W W d 0- C14 Lf) ch of 6iLL q PRESHAPE BEDDING TO FIT PIPE CONTOUR W w SIJ ° 12" MINIMUM d' _ d r oo j OVER ROCK 2" GRAVEL WHEN ILL UN UIITABLEFMATERIAL ID E ELEVATION ENCOUNTERED TYP. TRENCH DETAIL TY "D -G" L NOT TO SCALE NOT TO SCALE