HomeMy WebLinkAboutStaff ReportMeeting Date: September 23, 2014
Public Hearing Date: September 23, 2014
Terminal Date: October 29, 2014
Project: 80,000 square ft. building
General Information
Applicant: WWIS, LLC
Representatives:
Legal: None
Engineer: Ellen Bartlett
Surveyor: Robert Mullen
Requested Action: Special Permit/Site Plan Review
Purpose: Construction of an 80,000 square ft building for recreational use
Location: 2 Sachatello Industrial Dr.
Existing Land Use, Acreage, Zoning and Applicable Zoning Sections:
Vacant
10.65 acres
Section 13 (LI)
Section 18 (Site Plans)
Section 17 (Special Permits)
Background Information
Subject parcel is located in the Lombardi Industrial Park. The Light Industrial subdivision was
approved by the Commission in 2004. There are 5 approved undeveloped lots remaining
Analysis
Inland Wetlands Commission: No Impact to wetland areas
Building Department: Comments have been addressed
Fire Marshal: None
Uncas Health: Approved with Conditions
State of Ct Public Health: Approved
Planning Review:
Lot 1; 2 Sachatello Industrial Drive is one of the five remaining undeveloped lots within
Lombardi Business Park which was approved by the Commission in 2004.
The New London / Montville / East Lyme Water Project was completed in 2014. The Town
secured permission to access the new line in Sachatello Industrial Dr. for fire suppression. This
project will be the first to access the line. A hydrant is provided at the North East corner of the
building. The need for unreliable fire ponds has been eliminated.
The proposed project is an 80,000 sq. ft. structure which will house four indoor soccer/sports
fields, staff office space and 2 concession stands (no onsite cooking). The site will contain 199
parking spaces, 2 well systems, onsite septic system and a stormwater management system. The
project has received approval from the State Department of Public Health for 2 non-community
certificates for public convenience and necessity suitability certification. The applicant may
apply, at some future date, for a liquor license to serve wine and beer in the upper mezzanine
area.
The Town Engineer has reviewed and approved the hydrology report
Section 13.3.2 of the Zoning Regulations allows indoor recreation facilities in this Light
Industrial Zone by Special Permit.
The Town Planner and the Town Engineer has reviewed and approved the Erosion and Sediment
Control Plan.
This project complies with all applicable sections of the Zoning Regulations.
Staff Recommendations
Staff recommends approval. The application has satisfied the Requirements of Sections 13, 17
and Section 18 of the Regulations.
Draft Motion:
Motion to approve with conditions the special permit and site plan for WWIS, LLC for the
construction of a 80,000 square foot building on the property located at 2 Sachatello Industrial
Drive, Oakdale, Ct. A shown on Assessor’s Map 5 Lot 27-18 as depicted on the plans titled
“WWIS Montville, Connecticut Prepared by Green Site Design, LLC revised to 9/15/14”.
In doing so the Commission has considered the application, the staff report, the public testimony
and the expert testimony and finds that
1. The proposed use is in harmony with the appropriate and orderly development of the
neighborhood and will not hinder or discourage the development of adjacent properties
nor impair property value.
2. The location and size of the proposed use, the nature and intensity of operations involved
in connection therewith, its site layout and its relation to access streets will not be such
that both pedestrian and vehicular traffic to and from the use and the assembly or persons
in connection therewith will not be hazardous or inconvenient, nor incongruous with any
residential district or conflict with the normal traffic of the neighborhood.
3. The nature and intensity of the operations involved in connection with the proposed use
and the site layout and development will not have a negative impact on the environment.
This is a conditional approval. Each and every condition is an integral part of the Commission
decision. Should any of the conditions, on appeal from this decision, be found to be void or of
no legal effect then this conditional approval is likewise void. Should any of the conditions not
be implemented by the applicant or his successors within the specified permit time period, then
this conditional approval is void. This permit is valid for a period of five (5) years from the date
of approval. The applicant may re-file another application for review. The conditions of approval
are:
1. The ZEO must be contacted 24 hrs prior to start of construction.
2. An E&S Cash Bond in the amount of $2,000.00 must be posted prior to the issuance of a
Zoning Permit.
3. The select fill must be extended to 5 feet on all sides of the leaching system.
4. After the fill is compacted, it must be perc tested prior to the installation of the system.
5. Prior to the start of construction, the building and system are to be stacked by a licensed
surveyor.