Loading...
HomeMy WebLinkAboutStaff ReportGoogle Satellite Map Holly Lombardi Land Holdings LLC May 2, 2019 ® 0 280 560 840 Data shown on this map is provided for planning and informational purposes only. The municipality and CAI Technologies are not responsible for any use for other purposesor misuse or misrepresentation of this map. 1 inch = 280 Feet 027-010 027-018 027-015 004-000 001-000 027-014 032-005 018-000 027-013 027-012 006-00D 027-002 020-000 016-000 027-011 027-007 027-008 027-009 027-001 015-000 027-001 034-000 027-006 005-000 027-000 B u t l e r t o w n R dSachatello Industrial DrHartf o r d N e w L o n d o n T p k e Source: Esri, DigitalGlobe, GeoEye, Earthstar Geographics, CNES/AirbusDS, USDA, USGS, AeroGRID, IGN, and the GIS User Community Parcel Lines Streams WRP-160 ata shown on this map is provided for planning and informational purposes only. The municipality and CAI Technologies are not responsible for any use for other purposes or misuse or misrepresentation of this map. Holly Lombardi Land Holdings LLC May 2, 2019 ® 0 280 560 8401 inch = 280 Feet Project: Lombardi Excavation Facility Accepted by Commission-5/28/2019 General Information Applicant: Holly Lombardi Land Holdings, LLC Representatives: Legal: None Engineer: Green Site Designs Surveyor: Ryan Cheverie Requested Action: Site Plan Review Purpose: Expansion of existing processing operations Location: 10,18,26,34, & 42 Sachatello Industrial Dr (Map 5 Lots 27-11,10,9,8,7) and 325 & 335 Butlertown Rd (Map 5 Lots 27-12,13) Existing Land Use, Acreage, Zoning and Applicable Zoning Sections: Vacant 4.19 acres Light Industrial Section 12(Light Industrial) Section 17 (Site Plans) Background Information Lot 8 is adjacent to the existing processing activities. It is part of the approved Lombardi Business Park Light Industrial Subdivision. The applicant has provided a current conditions plan as requested by staff. Analysis Inland Wetlands Commission: No activity Planning Review: The addition of 325 Butlertown Rd (Lot 8) to the existing processing area will allow for additional space for stockpiles and the recycling of earth and construction materials. Town Engineer Review- All comments have been addressed Staff Recommendations Staff recommends approval. The application has satisfied the Requirements of Section 12(Light Industrial Zone) and Section 17 (Site Plans) of the Regulations Draft Motion for Approval: The Commission finds that the site plan meets the requirements of Section 12 and Section 17 of the Zoning Regulations and approves the plan and application of Holly Lombardi Land Holdings, LLC for the properties located at 10,18,26,34, & 42 Sachatello Industrial Dr. (Map 5 Lots 27- 11,10,9,8,7) and 325 & 335 Butlertown Rd (Map 5 Lots 27-12,13) as depicted on the plan titled “ 18 Sachatello Industrial Dr. Town of Montville CT, Holly Lombardi Land Holdings, LLC Lot 3 Combination & Reconfiguration Lombardi Business Park Sheets 1-4 Prepared by Green Site Designs LLC dated 4/30/19 and revised to 5/9/19” This is a conditional approval. Each and every condition is an integral part of the Commission decision. Should any of the conditions, on appeal from this decision, be found to be void or of no legal effect then this conditional approval is likewise void. Should any of the conditions not be implemented by the applicant or his successors within the specified permit time period, then this conditional approval is void. The applicant may re-file another application review. The conditions of approval are: 1. The ZEO must be contacted 24 hrs prior to start of construction and a Zoning Permit must be filed for prior to construction. 2. An E&S Bond in the amount of $2,000.00 must be posted prior to the issuance of a Zoning Permit. 3. Post- Construction Requirements note shall be added to the plans that reads as follows: After construction is completed and accepted by the Owner, it shall be the responsibility of the Owner to maintain all drainage structures. In addition, the following inspection and maintenance guidelines shall be the responsibility of the Owner, beginning the first year period following construction completion and acceptance, and shall be followed each year thereafter: 1. Drainage and other Paved Areas: Inspect on a regular basis not to exceed weekly for litter and debris. Sweep at least twice a year, with the first occurring as soon as possible after first snowmelt and the second not less than 90 days following the first. 2. Inspect semi-annually to insure boulder non disturbance line is maintained.