Loading...
HomeMy WebLinkAboutApproval LtrTOWN OF MONTVILLE PLANNING & ZONING COMMISSION 310 NORWICH NEW LONDON TPKE UNCASVILLE, CT. 06382 PHONE (860) 848-8549 Ext 379 Fax (860) 848-2354 October 19, 2016 Harry B. Heller, Esq., Authorized Agent For Dakota Partners, Inc. Heller, Heller & McCoy 736 Norwich New London Tpke. Uncasville, CT 06382 RE: 42 Pink Row Site Plan Approval – “Oxoboxo Lofts” Dear Attorney Heller: Please find attached the Notice of Decision for Applicant Dakota Partners, Inc., and Owner Faria Beede Instruments, Inc., An Application for Site Plan Review for property located at 42 Pink Row, Uncasville, CT. As shown on Assessor’s Map 74 Lot 38. Adaptive reuse of existing manufacturing buildings to multi-family residential dwelling units with associated site amenities has been GRANTED WITH CONDITIONS. This is a conditional approval. Each and every condition is an integral part of the Commission decision. Should any of the conditions, on appeal from this decision, be found to be void or of no legal effect then this conditional approval is likewise void. Should any of the conditions not be implemented by the applicant or his successors within the specified permit time period, then this conditional approval is void. The applicant may re-file another application review. The conditions of approval are: 1. Contact the Town Planner for pre-construction meeting a minimum of 14 days prior to start of construction. 2. An E&S Bond in the amount of $29,500.00 must be posted prior to the issuance of a Zoning Permit. 3. A fire flow test will be conducted to determine design requirements for the fire protection systems as per the WPCA department’s specifications. 4. No plantings shall be placed in front of a sprinkler connection or hydrant five feet of clearance is required. 5. Prior to issuance of zoning & building permits for the substantial improvements to the buildings, including but not limited to electrical, plumbing & utility connections & the use of enclosed areas below the base flood level, the ZEO and/or Building Official shall determine compliance with all applicable requirements of Section 16.4 (Special Flood Hazard Area (SFHA) Requirements) of the Zoning Regulations. 6. Post-Construction Requirements: After construction is completed and accepted by the Owner, it shall be the responsibility of the Owner to maintain all drainage structures. In addition, the following inspection and maintenance guidelines shall be the responsibility of the Owner, beginning the first year period following construction completion and acceptance, and shall be followed each year thereafter: 1. Drainage and other Paved Areas: Inspect on a regular basis not to exceed weekly for litter and debris. Sweep at least twice a year, with the first occurring as soon as possible after the first snowmelt and the second not less than 90 days following the first. 2. Catch Basin Sumps: Inspect semi-annually and clean when the sump is one half full of silt and/or debris. 3. Landscaped Areas: Inspect semi-annually for erosion or dying vegetation. Repair and stabilize any bare or eroded areas and replace vegetation as soon as possible. If you have any questions please contact the office. Sincerely, Marcia A. Vlaun Town Planner /mmg Enclosure cc: Will Walter - BSC Group- Connecticut, Inc. Certified & RRR: 7012 3460 0002 3848 6020