HomeMy WebLinkAboutOxoboxo LoftsFrom: Thomas Cummings <tcummings@claengineers.com>
Sent: Wednesday, October 12, 2016 9:40 AM
To: Walter, William G.
Cc: Planning Department; Colleen Bezanson
Subject: Oxoboxo Lofts
Will We have reviewed your recent response letter and the several revised
drawings sent to us on 11 OCT 16. We note that:
Filtration swale length must be added to the plans and that bottom width
of the fill around the infiltration pipe must be noted.
The curbing detail for pink row must be coordinated with the permanent
pavement repair detail on the same Sheet C-6.0.
There is a stray sawcut notation on Sheet C-2.0.
Minor stuff, any questions dont hesitate. Tom
Thomas L. Cummings, P.E.
CLA Engineers, Inc.
317 Main Street
Norwich, CT 06360
P: (860) 886-1966
F: (860) 886-9165
tcummings@claengineers.com
www.claengineers.com
Consulting Civil Engineers Since 1984