Loading...
HomeMy WebLinkAboutOxoboxo LoftsFrom: Thomas Cummings <tcummings@claengineers.com> Sent: Wednesday, October 12, 2016 9:40 AM To: Walter, William G. Cc: Planning Department; Colleen Bezanson Subject: Oxoboxo Lofts Will We have reviewed your recent response letter and the several revised drawings sent to us on 11 OCT 16. We note that: Filtration swale length must be added to the plans and that bottom width of the fill around the infiltration pipe must be noted. The curbing detail for pink row must be coordinated with the permanent pavement repair detail on the same Sheet C-6.0. There is a stray “sawcut” notation on Sheet C-2.0. Minor stuff, any questions don’t hesitate. Tom Thomas L. Cummings, P.E. CLA Engineers, Inc. 317 Main Street Norwich, CT 06360 P: (860) 886-1966 F: (860) 886-9165 tcummings@claengineers.com www.claengineers.com Consulting Civil Engineers Since 1984