Loading...
HomeMy WebLinkAboutStaff Report217IWC11 - 21, 23, 33 Pequot Rd & 17 Pequot Rd at Rte 163 July 20, 2017 ® www.cai-tech.com0300600900 Data shown on this map is provided for planning and informational purposes only. The municipality and CAI Technologies are not responsible for any use for other purposesor misuse or misrepresentation of this map. 1 inch = 300 Feet 1 H:\CurrentProjects\IWC\21 &23 Pequot Rd (217 IWC 9)\STAFF\217IWC9 StaffReport1 06152017.docx MEMORANDUM FOR THE RECORD APPLICATION# 217IWC11 REGULAR MEETING – THURSDAY, JULY 20, 2017 Prepared by Liz Burdick, Zoning & Wetlands Enforcement Officer Applicant/Property Owner: DW Holdings LLC Engineering Info: Michael Healey, PLS Attorney Info: N/A Address: 21 & 23 Pequot Road (Map 72, Lots 42 & 41) and 17 Pequot Road & Rte. 163 (Map 72, Lot 54B) and 33 Pequot Road (72, Lot 37A), Uncasville, CT Meeting Date: July 20, 2017 Date Received by IWC: July 20, 2017 (Decision Required Date – September 22, 2017) Applicant Request: Regulated Activities for Construction of Stormwater Quality Control Management System from Industrial Operations Located at 33 Pequot Road. Activity Description: Wetland Disturbance Area 0 SF Watercourse/Waterbody Disturbance Area 0 LF Upland Review Disturbance Area 8127 SF STAFF COMMENTS: - Application is for a permit for Regulated Activities for Construction of Stormwater Quality Control Management System from Industrial Operations Located at 33 Pequot Road. - 21 Pequot Road (Map 72, Lot 42) is located on .19 acre (8276SF) with an existing two- family residence, 23 Pequot Road is located on .16 acre (6970SF) with an existing two-family residence and 17 Pequot Road & Rte. 163 is located on 1.91 acres (83,199SF) and is unimproved. 33 Pequot Road is located on 5.19 (226,076SF) and is developed with an existing industrial use. All properties are located in the Industrial zoning district and are owned by the Applicant, DW Holdings, LLC. The application, plans and drainage report were referred to the Town Engineer on Tuesday, 7/18/2017 and comments are pending. - Where uses/proposals are determined to meet the criteria of a significant impact as defined in the Regulations, a public hearing must be scheduled by the IWC. A permit may be issued without a hearing following the petition period 14 days after receipt of application, subsequently action on the application needs to be tabled to the August 17, 2017 meeting. STAFF RECOMMENDATION: Staff recommends the IWC receive & review Application #217IWC11, set a date for a site walk if desired and table the application to the August 17, 2017 meeting.