Loading...
HomeMy WebLinkAboutStaff Report (2)17, 21 & 23 Pequot Road 217IWC9 - DW Holdings LLC JuO\ , 2017 ® www.cai-tech.com0150300450 Data shown on this map is provided for planning and informational purposes only. The municipality and CAI Technologies are not responsible for any use for other purposesor misuse or misrepresentation of this map. 1 inch = 150 Feet 1 H:\CurrentProjects\IWC\21 &23 Pequot Rd (217 IWC 9)\STAFF\217IWC9 StaffReport2 07202017.docx MEMORANDUM FOR THE RECORD APPLICATION# 217IWC5 REGULAR MEETING – THURSDAY, JULY 20, 2017 Prepared by Liz Burdick, Zoning & Wetlands Enforcement Officer Applicant/Property Owner: DW Holdings LLC Engineering Info: Michael Healey, PLS Attorney Info: N/A Address: 21 & 23 Pequot Road (Map 72, Lots 42 & 41) and 17 Pequot Road & Rte. 163 (Map 72, Lot 54B), Uncasville, CT Meeting Date: July 20, 2017 Date Received by IWC: June 15, 2017 (Decision Required Date – August 18, 2017) Applicant Request: Regulated Upland Review Activities in Conjunction with Demolition of Existing Dwelling Units and Site Improvements for Future Stormwater Management Improvements. Activity Description: Wetland Disturbance Area 0 SF Watercourse/Waterbody Disturbance Area 0 LF Upland Review Disturbance Area 8127 SF STAFF COMMENTS: In Review: - Application is for a permit for Regulated Upland Review Activities in conjunction with Demolition of Existing Dwelling Units and Site Improvements for Future Stormwater Management Improvements located at 21 Pequot Road, 23 Pequot Road and 17 Pequot Road & Rte. 163 located in the industrial zoning district and owned by the Applicant, DW Holdings, LLC. Demolition activities are proposed outside FEMA flood elevations. - The purpose of the project is to demolish the two existing two-family dwelling units at 21 & 23 Pequot Road along with associated improvements in preparation for future stormwater management improvements. Overall site work excavation is expected to be completed within one week. The existing structures and all appurtenances will be demolished. Foundations will be removed by an excavator and materials stockpiled outside the buffer and removed off-site and holes will be filled and graded. A temporary de-watering hole/sediment trap is shown on the plans & excessive water within the dewatering hole can be filtered and discharged to the brook via 6” pvc pipe. The entire site along with dewatering operations will be lined with sediment fence. All final grading will direct sedimentation runoff to the proposed sediment trap located in the middle of the site such that sedimentation can be directed away from Oxoboxo Brook. 2 H:\CurrentProjects\IWC\21 &23 Pequot Rd (217 IWC 9)\STAFF\217IWC9 StaffReport2 07202017.docx - Where uses/proposals are determined to meet the criteria of a significant impact as defined in the Regulations, a public hearing must be scheduled by the IWC. A permit may be issued without a hearing following the petition period 14 days after receipt of application, subsequently action on the application may be taken at the July 20, 2017 meeting. CONSIDERATIONS FOR ACTION: 1. If the Commission is inclined to approve this application, the following language for a motion of approval is suggested: M O T I O N # (A Motion to Approve) With due regard for the matters enumerated in Section 22a-41 of the Connecticut General Statutes and in accordance with Section 10 of the Regulations for the Protection and Preservation of Inland Wetlands and Watercourses of the Town of Montville, CT, I move to approve Application #217IWC9 submitted by the Applicant, DW Holdings, LLC for a Permit Regulated Upland Review Activities at 21 & 23 Pequot Road (Map 72, Lots 42 & 41) and 17 Pequot Road & Rte. 163 (Map 72, Lot 54B), Uncasville, CT in Conjunction with Demolition of Existing Dwelling Units and Site Improvements for Future Stormwater Management Improvements. as described in the Application & Project Narrative, Dated 6/7/2017 and the Plan Set entitled “Existing Conditions Survey Plan, Site Demolition Plan and Details, 23 Pequot Road, Montville, C, Prepared for DW Holdings, Prepared by BSC Group, Dated June 15, 2017.” Conditions of Approval: Standard Reasons for Approval: 1. The environmental impact of the proposed project does not have a significant effect on the inland wetland's and watercourse's capacity to support fish and wildlife, to prevent flooding, to supply and protect surface and groundwater, to control sediment, to facilitate drainage, to control pollution, to support recreational activities, and to promote public health and safety. 2. The Commission has determined that the relationship between the short-term uses of the environment and the maintenance and enhancement of long-term productivity will have no impact on the surrounding wetland system. 3. The proposed activity will not have irreversible and irretrievable commitments of resources. 4. The proposed project will not change the character and or add degree of injury to, or interference with, safety, health, or the reasonable use of property, including abutting or downstream property. 5. The proposed activity use is suitable to the area. 6. The applicant has taken all feasible measures to mitigate the impact of any aspect of the proposed regulated activity. 3 H:\CurrentProjects\IWC\21 &23 Pequot Rd (217 IWC 9)\STAFF\217IWC9 StaffReport2 07202017.docx 21 Pequot Road: 23 Pequot Road: