Loading...
HomeMy WebLinkAboutSite PlanNARRATIVE: THIS PROPOSAL INVOLVES THE CONSTRUCTION OF A 14,320 SF OFFICE BUILDING AND AN ASSOCIATED PARKING AREA ON AN 120,226 S.F. TRACT OF LAND LOCATED ON THE SOUTHERLY SIDE OF PEQUOT ROAD, MONTVILLE, CONNECTICUT, THE TRACT IS PARTIALLY CLEARED LANG. THE EXISTING TOPOGRAPHY IS GENERALLY 3-5% SLOPING DOWN AWAY FROM ROUTE #32. THE EXISTING SOIL ON THE SITE IS ENTIRELY HKC (HINCKLEY GRAVELLY SANDY LOAM, 3-15% SLOPE) AS DELINEATED ON THE SCS SOIL SURVEY AND THE SITE ALSO CONTAINS WATER COURSE. THE PROPOSED SITE IMPROVEMENTS INCLUDE THE CONSTRUCTION OF A NEW 14,320 S.F. CONCRETE BLOCK. BUILDING, INSTALLATION OF NEW BITUMINOUS CONCRETE PARKING AND LOADING AREAS, A NEW STORM DRAINAGE SYSTEM, AND UTILITIES. AN ANTI -TRACKING PAD WILL BE INSTALLED AT THE CONSTRUCTION ENTRANCES TO MINIMIZE SEDIMENTS FROM BEING DEPOSITED. SILT FENCE WILL BE INSTALLED DOWNHILL OF THE PROPOSED CONSTRUCTION SITE TO MINIMIZE EROSION ONTO ADJACENT PROPERTY AND WATER COURSE STAKED HAY BALES WILL BF INSTALLED AROUND CATCH BASIN PRIOR TO PAVING TO MINIMIZE SEDIMENTS FROM ENTERING THE STORM DRAINAGE SYSTEM 1-x CONSTRUCTION SEQUENCE: 1. CONSTRUCTION WILL BE INITIATED B" THE INSTALLATION OF SILT FENCE AND THE ANTI -TRACKING PAD AT LOCATIONS SHOWN, 2, IMMEDIATELY UPON COMPLETION OF STEP 1, EXCAVATION FOR THE BUILDING AND RETAINING WALLS WILL BEGIN. AFTER THE FOUNDATION IS INSTALLED, BUILDING AND CONSTRUCTION WILL COMMENCE. 3. AFTER THE FOUNDATION FOR THE BUILDING AND RETAINING WALLS ARE INSTALLED, THE SUBBASE FOR THE BASEMENT ENTRANCE AREA SHALL BE ROUGH GRADED, BASE SHALL BE PLACED AND ROLLED AND PAVED WITH BITUMINOUS CONCRETE. 4. AFTER THE MAIN FRAME OF THE BUILDING IS COMPLETED (STELL, CONCRETE BLOCK, ROOF), THE SITE SHALL BE ROUGH GRADED AND STORM DRAINAGE STRUCTURES AND UTILITIES SHALL BE INSTALLED. STAKED HAY BALES SHALL BE INSTALLED AROUND CATCH BASINS 5. PLACE AND ROLL BASE FOR PAVEMENT, INSTALL PAVEMENT AND CURBING. b. ALL DISTURBED AREAS EXCLUDING BUILDING, PAVEMENT; SIDEWALKS, ETC, SHALL BE LOAMED 14" MINIMUM), SEEDED AND MULCHED. SEE GENERAL. NOTES) 7. AFTER ALL AREAS HAVE BEEN PERMANENTLY STABILIZED, REMOVE SILT FENCE. Fi `.i m EROSION CONTROL NOTES: AFTER EACH STORM OR AT LEAST ONCE A WEEK, ALL EROSION CON'ROI. DEVICES SHALL BE CHECKED AND MAINTAINED PROPERLY. 2. MULCHING: IMMEDIATELY FOLLOWING SEEDING, MULCH THE SEEDED SURFACE WITH STRAW OR HAY AT A RATE OF 70 LBS/1000 SF, SPREAD MULCH BY HAND OR MULCH BLOWER. PUNCH MULCH INTO SOIL SURFACE WITH TRACK MACHINE APPROXIMATELY 2" - 3" TO ANCHOR, SEEDING: BETWEEN APRIL 1 AND JUNE I AND AUGUST 15 AND SEPTEMBER 1, ALL. DISTURBED AREAS SHALL BE IMMEDIATELY GRADED AND SEEDED TO PROMOTE STABILIZATION OF SLOPES. SEEDING SHALL BE DONE IN ACCORDANCE WITH THE FOLLOWING SEEDING AND SLOPE STABIiIZATION DIRECTIVES: A. FINE GRADE SEED BED TOGETHER WITH LIMESTONE AT A RATE OF 90 LBS..PER 1000 SF AND 10 10 10 FERTILIZER AT A RATE OF 7.5 LBS. PER 1000 SF, B. APPLY THE FOLLOWING SEED MIXTURE: 45% KENTUCKY BLUE GRASS, 45% CREEPING RFD FESCUE AND 10% PERENNIAL RYEGRASS AT A RATE OF 1 LB PER 1000 SF. C. IMMEDIATELY UPON SEEDING, MULCH THE AREA WITH HAY OR STRAW Al A RATE OF 1.1/2 BALES PER 1000 SF. D, IF SEEDING CANNOT BE DONE WITHIN THE SPECIFIED SEEDING DATES, SEE,,) WITH ANNUAL RYEGRASS AT A RATE OF 1 113/1000 SF, 4 THE GENERAL CONIRACTOR "_• FOREMAN AT THE TIME OF CONSTRUCTION WILL BE RESPONSIBLE FOR THE INSTALLATION AND MAINTENANCE OF All EROSION AND SEDIMENT CONTROL DEVICE ,;N ti ;c .r•EDEI: I L 1 T'I.ES TO 3E INSTALLED rR', M "•XIS:'ING PULES. ' LI(1ITTING TO BE DIRECTED SG AS PREVENT 1 .. '�N' ADJACENT. PROPERTIES. �,rI tvORK CONDUCTED WITHIN TOWN RIGHT OF WAY TO BE CIRDANCE TO TOWN STANDARDS, AATEP EP. SUPFLY T�) BE BY NEW WELL. C.,,ry SEWER CONNECTION TO BE TO TOWN STANDARDS. owr • rir turn• 04,00 x• q r7Nc*/ Esc MC s G t cry« ny4 ff CXY.!'t` 6 rte' i I M,%CC Tb rr12F r&*cv,, .TEr / "'.sir �F+tit:E .SND e'S 7rV..0 ! cGve,'9C7' rNLr 42 / r ry TMC" i fXc•! ✓--7T- D x/L cv/7.4"E -oc Irc Moe, r � .ret1/t1rr4,vO Iciff4C �-'�� /.•�/.��rE� JE<f" rY64'✓/�Sd . /CL' ` ,r { I ,�AGC,�/[.c. 'J � 1 SILT FENCE /N6-74LL4 T/CN DE J�qlL N/F CENTRAL VERMONT RAILROAD 40�8 CN�R� N 2582. / LOT AREA 120,226 S.F. 2.76± ACRES _ PAVED LEAK OFF 94 96 A9 90 92 94 �6 /0o _ !O2 io4 APPROXIMATE LOCATION A26 OF SPRING S 300 49' 49" E 123,00' 1 N/F SHIRLEY SORRENTINO N/F DOUGLAS 8 JANICE HENSLEY INSTALL 32 L.F. OF 30 INCH RE-INFORCED CONCRETE PIPE. PLACE 8" RIP -RAP I FOOT DEEP OVER DESIGNATE AREA TO SERVE AS ENERGY DISIPATOR, INSTALL NEW SANITARY MANHOLE W/ DROP INLET INVERT IN- 76.3-3-_—_-_-_--.---._._.-- INVERT OUT- 76.08 TOP OF FRAME AT EL. 84.00 INLAND WETLANDS INV. 79.00 B" RIP -RAP I FOOT DEEP FLARED ENDS i --LIMIT OF INLAND WETLANDS �g PROPOSED WELL TYPE "C" CATCH BASIN % T.F'.89.80 92 / INV, OUT 85.50 y 0%e RIM ELEVATION 9R• OS'• ,. 76.79 76 INV. OUT 78.50 o' HIGH MACHINE FORMEDI ----- HIT CONC LW CURB IBCt.C1 WHERE REQUIRED "COMHAC'TED THICKNESS „ L, ASS 2 BIT CONC PVMT 9 - -- LOAM 21° 6^fi 3 -- -1 � 41 4" PROCESSED GRAVEL • °CL o B BANKRUN GRAVEL. . ^ . o 0 ° 1 PAVEMENT AND CURB SECTION ti� Q // s� sem• PAVED LEAK -OFF �F. 1 `• 200 -- , I g h 't ' . � • ! I ail 'INT "AN C� • �a\ 250 10 i • N� �'� •�` • ��� —•- of .� ��,� • `' iii \ i \Z o n.T7- ENO• ZONE M REQUIREMENTS LOT AREA NO REQUIREMENT t LOT FRONTAGE 100 FT. FRONT YARD- 30 FT. SIDE YARD 15 FT ( 10 FT. COMMERCiAL.) PARKING 1 SPACE/300 S.F. (48) ALL ZONE REQUIREMENTS MET OR EXCEEDED RETAINING WALL -78 �6 �2 ao h 80 r� � 2 32' OF RAIL - - ° ,� 62 30'- RCP -- L• INV. IN8. 0.00 SILT NCE - 8_4 T - 94 / C96 NEW Ap.BoR•YI1 A E AS 91 �. TYPO _ 8� RAY 8 LINDA KIGvANS TYP, Al INTERMITTANT WATER COURSE DUW TE/ igZ � a / LJMIAOUS CONCRETE P \ MENT TYPO CONC. S ALK ' - � I N/F 0 —IGHTS 94 GARY E. TATRO o N } I-- 'e . moo. • • o 'a �, '.ci ?' ' o.; 91 °•• •. 0.�.'O• •O• •e. .0,. .° a •'. •p: ,.••C•• �'�-�.1�r_1 ,• 'i..". .y} LOADING ,,,,•� ,.:p� �.:_ �• .. .:-o:.;.-;�;...:�-o- .: , ;- .• TYPO�- PROPOSED BUILDING RETAINING WALL - - - - -- _��._�._ :�•,--,�'�o�y_j �'""° ��'°'"-` ° :"ro•:...." �; � �...--�.;..� ��� .;:o S 27° 51' 59" E in _�_ _ a .• ,, 1. 166.87' �- .y�...: �.•' • - a. .. N59°09'17"E - -- ---- ----- 19,12' 136.00' 106 N / F 104 STEVEN 8 ELSIE PETROWSKI N/F WALTER 8 MILDRED JASKIEWICH I HEREBY DECLARE, THAT THIS MAP IS SUBSTANTIALLY CORRECT. THIS MAT AND SURVEY WERE: PREPARED IN ACCORDANCE WITH THE STANDARDS OF A CLASS A-2 _SURVEY AS DEFINED IN THF "RECOM ENDED STANDARDS FOR SURVEYS AND MAPS IN THE STATE OF CONNECTICUT" AS PREPARED AND ADOPTED BY THF: CONNECTICUT ASSOCIATION OF LANL' ;SURVEYORS, INC;., ON SEPTEMBER 13, 104 . FLOOD LIGHT 'FIE-N0P TVTL-L>= - ZZwTR - _-� -F__. _ ---- _-.__.. _------------- 1 t 15 -- ---- _._ 30 • __�---- E,li 5 G Csu-� r�E — _-- =�-pS 5 - S ELT/ On.i 7'N.e OUIa sa pe i i/� u✓„/ y A.c/D .c/Er.i —� // 3d PLAN OF DEVELOPMENT MADE FOR KING BMULLEN PEQUOT ROAD MONTVILLE, CONNECTICUT 0 20 40 60 80 F -D AT E : 6-26-89 SCALE: I"= 20' ING ren u LLEN REVISION 8-24-89 L A N D S U R V E Y O R S 152 ROUTE 163 UNCASVILLE,CONN. AUG 2 4 1889