Loading...
HomeMy WebLinkAboutSite PlanCL&P #7752 W/GUY-, W W W W W WL ff 000/ / APPROXIMATE LIMITS I // OPOSED ACTIVITY � I (#0.8 ACRES) I 11-000 1MATERIAREA AGING TEMPORARY PUMP � M� DISCHARGE BASIN (DEPTH = 2') MAP X045 LOT #008—OOA NF J MICHAEL /�1ATERA AREA 10 t ACRES N WL 05 1r 1 1. WL #20 \ I L,. a i1 -- '110 P �p \\ z LLj+:. /`PROPOSED N 8 1 _ -- W WW o 163 �STON�E DIKE M to �. CL � o \ \ 00Q) 00 o z Q 00 �. r� bi O Io4 .. C W Lo a LL' � Q N � OCL.. Lo WL 05 1r 1 1. WL #20 \ I L,. a i1 -- '110 P �p \\ z LLj+:. Q N 8 1 o W WW o 163 o M to �. CL � o 00Q) 00 o z 00 �. r� bi O Io4 .. C W Lo a LL' � Q N � OCL.. Lo p O z r... a Q �- - w QIL 00 .+ Q Q O o rn 0 Lo. �I [n L0 cy) t � Ln O N Lr) p N z � 0 W m LOCUS 4tk = ❑ c> O c.> LLJ _j E DATE; AUG, 4, 2005 SCALE; 1 "=20' PROJECT# 20051 63 °z° c Q) i 2 g 2 U� p N C> M Q N T V 1 !.. (. E M Lo w 0<0 coa LOCATION MAP SCALE 1 " =1000' w 1 WL 05 1r 1 1. WL #20 \ a, Lijw -Lj- E i \ O x E Ei fo� �. m NOTES; O q I} 1) NORMAL PO ) IS ND WATER LEVEL (WEIR ELEVATION � 1 I � � WILL �3 FT \ AND 1�IILL NOT CHANGE, I I E' 2.) -APPROXIMATE VOLUME OF MATERIAL TO BE REMOVED FROM EXISTING .OND (BELOW 327 FT) 1S ±370 CY, ,) ELEVATIONS ARE BASED ON AN ASSUME ' D DATUM, I sopR l • V 0 C T 0 6 2005 BY / E l I HAVE DELINEATED THE WETLANDS AND WATERCOURSES SES ON THE PROPERTY SHOWN HEREON IN ACCORDANCE WITH C,G.S, 22o--36 THROUGH 22o--45. I HAVE REVIEWED THIS PLAN AND BELIEVE THAT THE WETLANDS/WATERCOURSES SHOWN ARE ACCURATELY \ 1 REPRESENTED, HEN DAM 1 IAN COLE, C. P, S, S, \ \ Ty J HIS SURA/EY AND MAP HAS BEEN PREPARED IN ACCORDANCE WITH SECTIONS 20-300b-1 THRU 20-300b-20 OF THE REGULATIONS Or CONNECTICUT STATE AGENCIES — 'MINIMUM HELTCO STANDARDS FOR SURVEYS AND MAPS IN THE STATE OF CONNECTICUT" AS ENDORSED BY #6866 THE CONN'"CTILUT ASSOCIATION OF LAND SURVEYORS, INC,, AND ADOPTED BY THE STATE OF CONNECTICUT ON JUNE 21, 1996, IT IS A TOPOGRAPHIC SURVEY CONFORMING TO ACCURACY CLASS C, T2 STANDARDS, "TO MY KNOWLEDGE AND BELIEF, THIS MAP IS SUBSTANTIALLY CORRECT As NnTFrn HrRFnN" L,. a O z LLj+:. h— z to o W WW o o �. CL � a, Lijw -Lj- E i \ O x E Ei fo� �. m NOTES; O q I} 1) NORMAL PO ) IS ND WATER LEVEL (WEIR ELEVATION � 1 I � � WILL �3 FT \ AND 1�IILL NOT CHANGE, I I E' 2.) -APPROXIMATE VOLUME OF MATERIAL TO BE REMOVED FROM EXISTING .OND (BELOW 327 FT) 1S ±370 CY, ,) ELEVATIONS ARE BASED ON AN ASSUME ' D DATUM, I sopR l • V 0 C T 0 6 2005 BY / E l I HAVE DELINEATED THE WETLANDS AND WATERCOURSES SES ON THE PROPERTY SHOWN HEREON IN ACCORDANCE WITH C,G.S, 22o--36 THROUGH 22o--45. I HAVE REVIEWED THIS PLAN AND BELIEVE THAT THE WETLANDS/WATERCOURSES SHOWN ARE ACCURATELY \ 1 REPRESENTED, HEN DAM 1 IAN COLE, C. P, S, S, \ \ Ty J HIS SURA/EY AND MAP HAS BEEN PREPARED IN ACCORDANCE WITH SECTIONS 20-300b-1 THRU 20-300b-20 OF THE REGULATIONS Or CONNECTICUT STATE AGENCIES — 'MINIMUM HELTCO STANDARDS FOR SURVEYS AND MAPS IN THE STATE OF CONNECTICUT" AS ENDORSED BY #6866 THE CONN'"CTILUT ASSOCIATION OF LAND SURVEYORS, INC,, AND ADOPTED BY THE STATE OF CONNECTICUT ON JUNE 21, 1996, IT IS A TOPOGRAPHIC SURVEY CONFORMING TO ACCURACY CLASS C, T2 STANDARDS, "TO MY KNOWLEDGE AND BELIEF, THIS MAP IS SUBSTANTIALLY CORRECT As NnTFrn HrRFnN" c� z z to o z CL � o o z �. r� bi O W Lo a LL' � Q N � Lo p O z r... a Q �- - w QIL o �I �I [n L0 cy) t � Ln O N Lr) p N z � 0 W m �70 a 4tk = ❑ c> O c.> LLJ _j E DATE; AUG, 4, 2005 SCALE; 1 "=20' PROJECT# 20051 63 s EARTHEN DAM ELEVATION 332,75' TOP OF EXISTING DAM ELEVATION i 332,25' TOP OF EXISTING WEIR ELEVATION ;1; 331' 10' MAXIMUM 10" DIA, PIPE36 s I 2" STYROFOAM INSULATION IF REQUIRED UND SURF, ., ,. GRo VO w• z .,�. FLOW TTS FROST LINE t rr `E MIRAFI 140 N FILTER FABRIC 1' 1, 1' 12' , (VARIES) ....., ...... ^�,.., �:"...,,_...._.,, .^.. .�... �... _.,. ,.,_ ...�. MIRAFI 140 N FILTER FABRIC DETAIL PROVIDED BYKOCHEK CO,; INC, 1" STONE MODIFIED RIP -RAP EASTFORD, CT, STONE DIKE DETAIL NTS DRY HYDRANT WITH FREEZE PROTECTION NTS 32--35' WATER _.. 81 — STRAINER 20 10 0 20 GRAPHIC SCALE IN FEET. QUALITY CONTROL CERTIFICATION GROUP REVIEWED DATE PROJECT MANAGER u� SURVEY ENVIRONMENTAL � � c�:t�• � �" CIVIL > s" STRUCTURAL ARCHITECTURAL POND BOTTOM 8" OF 2 ROUNDED STONE s T 0.5' 2.08' CONCRETE FOUNDATION EARTHEN DAM TO BE CONSTRUCTED WITH A SOIL CONTAINING 1579_ PASSING 200 SIEVE & COMPACTED TO 95% DENSITY 3 1 QRQSS _.SECTION EAR HEN DAM NTS #4 at 1,5' TOP AND BOTTOM) 0,5 ' 0.5' #4 at 1.5' 3.5' 0.17' (TYP) 1.1—#4 at 1,5 TOP OF DAM ELEVATION 1332,75 f 6" i N E i co co 00 z o n C (� 0 E V) Lj wLJ >U' CLU Q TOP OF DAM ELEVATION 332,25 n 4 0 con Lo O to a - .....r. U , co 5 TOP OF WEIR ELEVATION 331,0 U o;a a GRANITE BLOCKS (TYP,) m 15X20XL f a E n: #4 at 1,5' TOP AND BOTTOM) 0,5 ' 0.5' #4 at 1.5' 3.5' 0.17' (TYP) 1.1—#4 at 1,5 TOP OF DAM ELEVATION 1332,75 f 6" i 2 Ld o 1 w N o � 0 4" MIN, TOPSOIL, & SEED Q Q 1— w QLo Ln Q 0 *7 C�7 co p o V) < w w O w rz = p --i DATE; AUG, 4, 2005 SCALE: 1 "=20' PROJECT# 2005153 SHEET 3 OF i W z o V) Lj wLJ >U' �-- Q Q n 0 Z O O a - .....r. Q X O a V) d z 2 2 C) V) u' > 2 Ld o 1 w N o � 0 4" MIN, TOPSOIL, & SEED Q Q 1— w QLo Ln Q 0 *7 C�7 co p o V) < w w O w rz = p --i DATE; AUG, 4, 2005 SCALE: 1 "=20' PROJECT# 2005153 SHEET 3 OF i EROSION AND SEDIMENTATION CONTROL -NARRATIVE DETAILS CON STRU CTI CN,_._OU EN CE , It is anticipated that all work activities described below will be conducted under non -storm conditions (I,e,, flow of McAlpine Brook less than 907 durational flow), In the event of a storm during any phase of construction, the work will be suspended and the -STAKE PLACE AND STAKE necessary Storm Contingency Procedures (described STRAW BALE, TWO STAKES below will be implemented, , STRAW BALE R PER BALE MAKING SURE THE BINDING WIRE OR TWINE DOES .BINDING WIRE PHASE #. SITE PREPARATION NOT MAKE CONTACT WITH THE OR TWINE GROUND 1, Construct Stone Dike below Existing Dam (see detail) I I I I to provide filtration of water discharging from pond, STOCKPILE 2, Excavate 2 -stage pump discharge basin for ` sedimentation' (shown on Site Plan); remove excavated 1,5"x1,5"06" STAKE DRIVEN ON , material from site DOWNSLOPE SIDE OF TRENCH �Q _ ' 3, Excavate sand andgravel from area. of Pond EXTEND 8" OF SILTFENCE BELOW 7 Extension only to the water table (estimated to be 2 GRADE r ":, ', EXISTING to 3 feet deep); maintain berm between the pond k,--- - ', GROUND extension and the existing pond, Use this depression ANGLE STAKE 2' 20' UPSLOPE,. z M ' , .: �, , ..•., as a dewatering basin to accept water draining from material staging y .\" � srqkF •'.':•. ' , , , area , Remove tho excavated sandand SET STAKE 12„ MINIMUM INTO GRADE gravel from 'zhe site, `. I i -I I LI I STAKED HAYBALES MAY BE SUBSTITUTED '� :' , ::'' . 4; Build sump for bypass pump intake immediately FOR SILT FENCE I=1Thl►=1iI=11' �"' ' III=1 I �f I I^I I�-il I ='' �' PLACEMENT AND CONSTRUCTION upstream of Existing Pond, (See detail) I=1TI=III=1T_I=III=111-11 5, install flexible overland piping from Bypass Pump, SILT FENCE LOCATED 11=11 III=DTII=IT T-'' 5 -TO' FROM TOE OF = - - - -11�: OF A STRAW BALE BARRIER around Existing Pond, to discharge point Upstream of �, -III-III-I TI_I l l-1TI-I ill SLOPE _ 11=1 ISI I I -T1 11=1(I I h>! _- "� stone dike, -1 I I{ {_=1 11=11 I-III=1► I-1 I i i NTS 1=11If1- 1i1=11Ml -11�lihl6, Install other erosion and sedimentation controls, as -1! I- specified, in areas downslope of material stockpile area, J-1T�l i Iu��ll I-1 f �i 11-I i III. =1 I X11 I -f l �i 1 Ill I- 1hIII=Tl 111 111 I[I��IIIITIIfIITIIIITIIIIi� Tif lll� -_ PHASE ii: EXITBNG POND DREDGING "I ill EXISTING SUBGRADE BACKFiLLED TRENCH 1, Install ,ditch pump in deepest part of Existing Pond route discharge line to Pump D.Ischorge Basin to allow settling of water; pump or siphon clear water from second stage of Pump Discharge Basin to McAlpine SILT FENCE @ TOE OF SLOPE APPLICATION Brook below dam, upstream from stone dike 2, Dewater Existing Pond using Bypass Pump and Pond NTSBottom Pump; continue to operate these pUmps during subsequentphases of construction, as needed, to maintain L dewatered pond, 3, install stone riprop to create armored Swale below �a McAlpine Brook Inflow (see "Storm Contingency' below) 4. Excavate accumulated sediment from existing pond • Q� basin to approximate proposed depths shown on Site O Plan, Place removed sediment in Material Staging Area to allow material to drain, When material has adequately .. drained (no -free--draining liquid), load and remove O S4: material from site, 1, SET POST AND a EXCAVATE A 6" X. 61" WIRE _ 2, STAPLE THE ° v °( °O ° � III' N) P I EC�NSTRU .rill®N ANGLE 10' POSTS TRENCH, SET POST FENCING l WIRE MESH FENCING ° ° ° (' PHASE . DA RE A R/R UPSLOPE FOR DOWN SLOPE I TO END POST STABILITY AND O a� °Q I ° SELF CLEANING° ° 1, Remove woody vegetation from earthen portion of dom z, .Remove stone and mortar portion of .existing darn; . --- 'j-111111111 _ i ui1 1111 _ stockpile material for re -use or remove from site, as Ull-1111a Iil1=1111- 1111- - ull 1111 1111= ° needed 1111=1111.-1111=1111= 1111; IIID , 1111= IIID lilt=, � O O - 9� - Il11 Ili► = 1111 = _ _ = ..r 1111= u[I = AS O channel all passage 1111-' D "'iN ull ' Jill - 11i1- 1111 _ p a 3, .Construct storm bypass cha to ow pa sag 1111 - IUi = 1111. 1111 � IIII �EPiN - FILTER ° Iut = Ilii l=� ulI = nli Q ° REQUIRED ° FABRIC O °�I a of storm flows during dam repairs, ° O 4, Excavate dam foundation trench O °O „ 5, Qewater foundation trench, as needed, by Bumping O to first stage of pump discharge basin 4, BACKFILL THE TRENCH CT, D,O, T 2 d FILTER r 3, ATTACH FILTER FABRIC AND COMPACT THE 4 MINIMUM O6, FABRIC """ '�'�" I TO THE WIRE FENCiNO AND i STONE DEPTH \���� 7. Install farms for concrete foundation i EXTEND IT TO THE TRENCH, EXCAVATED SOIL, i 7, Pour and finish concrete i "IAPACTED 1 �'L 8, Install granite blocks BACKFILL l 9, Install geotextile liner and rounded stone over liner 1111 =1111= 1111= nu = 1111 =1111 (detail shown) 1111 1111= 1111=Illi, llll�llll= t fl I Illi=.1111= Illi= till= 1111= 1111= 1111 = 1111=Illi = I 1111 _ 1111 lilt =. - -1U1= 1111= 1111= 10, Repair earthen darn segment of storm ow bypass 1111 = 1111 = lllf = .( 1111 =glill - �• Jill illi = - 1111 = CONSTRUCTION � �* (111_ 111tH Illi- Iill- CONSTRUCTION ENTRANCE PAD Channel, lilt = _ NTS PHASE IV; EXCAVATE POND EXTENSION BOTTOM. OF DBOTTO EWAY a 1, Excavate pond extension to proposed depths 2, Remove berm separating pond and pond extension 3, Place excavated sand and gravel in material staging area to drain; load and remove material from site AJ when draining complete ELEVATION LEVAPOINT IO MOULD BE HIGHER'HASE V. SITE REST{�RAT14N THAN POINT B 1, Removed riprap armored Swale from pond PLAN VIEW 2; Remove ditch pump from pond bottom, 3, Remove pond bypass pump and sump; allow PLACEMENT AND CONSTRUCTION OF A SYNTHETIC FiLTER FABRIC McAlpine Brook to refill pond, 4. Backfill pump discharge basin and grade surrounding NTS area, 5. Place 4 inches topsoil ROUTINE MAINTENANCE These tasks must be conducted at least daily throughout construction; 1, Inspect and maintain stone dike belowdarn; clean, repair or replace filter fabric, as needed, to maintain permeability of dike and clear discharge below dike, 2. Inspect pgmp discharge basin operation to ensure water pumped from second stage is clear of suspended sediment; add third stage basin, If needed to ensure SUGGESTED SEEDING MIXTURES AND PRACTICES ,r �� agequate sediment removal, SEE OPERATION AND MAINTENANCE NOTE P11 1P CONTINGENCY AREAS WHERE SEED RATE PER In the event of heavy rainfall, the flow of McAlpine MIX APPLIES SEEDING MIXTURES BY WEIGHT 1000 sq, ft. SEEDING DATES Brook will exceed the pumping and piping capacity of the pond bypass system, In- this event, pumps will be shut off and McAlpine Brook will be allowed to flow ALL LAWN AREAS RED FESCUE 487 1 LBS, APRIL 1 - JUNE 15 Into the pond over the riprap armored Swale, The RED TOP 4� OR AUG. 14 - OCT, 15 Brook's flow will be allowed to fill the pond, with the TALL FESCUE 0R 48f pond serving as sedimentation basin, Any excess flow ' SMOOTH BROMEGRASS will exit the pond via the bypass channel, .When the stormflow diminishes, the pond bypass pump and bottom pump will be re -started, the pond will be dewatered, and construction activities will resume, POST STORM EVENT MAINTENANCE Following a storm event that causes cessation of construction activities, the contractor shall inspect and repair, as necessary, the following,, 1, Riprap Swale 2, Dam bypass channel 3, Stone dike 4, Pump discharge basin 5 Erosion and sedimentation controls QUALITY CONTROL CERTIFICATION GROUP REVIEWED DATE PROJECT MANACER SURVEY ENVIRONMENTAL``" CIVIL rx Ljj Q STRUCTURAL ARCHITECTURAL SUPPLEMENTAL NOTES AND SPECIFICATIONS HAYBALES A. ALL BALES SHALL BE EITHER WIRE OR STRING BOUND, BALES SHALL BE INSTALLED SO THAT BINDINGS ARE ORIENTED ALONG THE SIDE RATHER THAN ALONG TOP AND BOTTOM OF THE BALES TO PREVENT DETERIORATION OF THE BINDINGS, B, GAPS BETWEEN BALES SHALL BE CHINKED WITH STRAW TO PREVENT WATER FROM ESCAPING BETWEEN BALES, C, ON SLOPES WHERE SURFACE FLOW FOLLOWS THE BALE LINE, PERPENDICULAR BALE CHECKS SHALL BE INSTALLED AT 50 FOOT INTERVALS SILT FENCE A, SYNTHETIC FILTER FABRIC SHALL BE PERVIOUS SHEET OF PROPYLENE, NYLON, POLYESTER, OR ETHYLENE FILAMENTS AND SHALL BE CERTIFIED BY THE MANUFACTURER OR SUPPLIER AS TO CONFORMING TO THE FOLLOWING MINIMUM REQUIREMENTS; 1, FILTERING EFFICIENCY 75 PERCENT 2, TENSILE STRENGTH AT STANDARD STRENGTH 20% (MAX,) ELONGATION 30 LBSAINEAR INCH 3, FLOW RATE 0,3 GAL/S,F,/MINUTE GENERAL NOTES 1, INLAND WETLAND BOUNDARIES WERE DELINEATED IN THE FIELD BY IAN COLE, CERTIFIED SOILS SCIENTIST, 2, ALL UTILITIES. SHALL BE APPROVED BY LOCAL UTILITY COMPANIES PRIOR TO CONSTRUCTION; ALL UTILITIES TO BE CONSTRUCTED TO UTILITY COMPANY SPECIFICATIONS, 3, ALL CONSTRUCTION SHALL BE TO TOWN OF MONTVILLE SPECIFICATIONS & REGULATIONS, 4, NO CHANGES CAN BE MADE TO THESE PLANS WITHOUT THE TOWN'S APPROVAL, 5, CONTRACTOR SHALL OBTAIN ALL REQUIRED LOCAL & STATE PERMITS PRIOR TO BEGINNING ANY CONSTRUCTION 6, FIELD CHANGES SHALL HAVE PRIOR APPROVAL BY THE TOWN, 7, UNLESS OTHERWISE NOTED OR SPECIFIED, ALL ROADWAYS & STORM DRAINAGE SHALL BE CONSTRUCTED IN CONFORMANCE WITH THE STATE OF CONNECTICUT, D,O,T, "STANDARD SPECIFICATIONS FOR ROADS, BRIDGES, AND INCIDENTAL CONSTRUCTION, FORM 814A, 1985 SIMILARLY PERTINENT CONSTRUCTION DETAILS THAT ARE NOT INCLUDED WITH THESE DRAWINGS SHALL CONFORM TO THE STATE OF CONNECTICUT, D,O,T, STANDARD ROADWAY DRA'NINGS, 8, CONTRACTOR SHALL NOTIFY THE TOWN ENGINEER OF CONSTRUCTION SCHEDULE SO THAT INSPECTION MAY BE PROVIDED, 9, UNDERGROUND UTILITY, STRUCTURE AND FACILITY LOCATIONS DEPICTED ON. PLANS HAVE BEEN COMPILED, IN PART, FROM RECORD MAPPING SUPPLIED BY ' THE RESPECTIVE UTILITY COMPANIES OR GOVERNMENI.AL AGENCIES, FROM PAROL TESTIMONY, FIELD MEASUREMENTS AND FROM OTHER SOURCES, THESE LOCATIONS MUST BE CONSIDERED APPROXIMATE IN NATURE, ADDITIONALLY, OTHER SUCH FEATURES MAY EXIST ON THE SITE, THE EXISTENCE OF WHICH ARE UNKNOWN TO CME ASSOCIATES, INC, THE SIZE, LOCATION AND EXISTENCE OF ALL SUCH FEATURES MUST BE FIELD DETERMINED AND VERIFIED BY THE APPROPRIATE AUT'HORITiES PRIOR TO CONSTRUCTION, CONTACT "CALL BEFORE YOU DIG" AT 1-800--922-4455 THREE (3) WORKING DAYS PRIOR TO THE START OF ANY CONSTRUCTION ACTIVITY, PERSON RESPONSIBLE FOR MAINTAINING CONTROL MEASURES DURING CONSTRUCTION, NAME - ADDRESS - TE LEPHONE MAINTENANCE LOG LOCATION h E DATE N 8 N U r I--- < rx Ljj Q 'CD 00 Q) n- Cv r I►: 0 E GENERAL NOTES 1, INLAND WETLAND BOUNDARIES WERE DELINEATED IN THE FIELD BY IAN COLE, CERTIFIED SOILS SCIENTIST, 2, ALL UTILITIES. SHALL BE APPROVED BY LOCAL UTILITY COMPANIES PRIOR TO CONSTRUCTION; ALL UTILITIES TO BE CONSTRUCTED TO UTILITY COMPANY SPECIFICATIONS, 3, ALL CONSTRUCTION SHALL BE TO TOWN OF MONTVILLE SPECIFICATIONS & REGULATIONS, 4, NO CHANGES CAN BE MADE TO THESE PLANS WITHOUT THE TOWN'S APPROVAL, 5, CONTRACTOR SHALL OBTAIN ALL REQUIRED LOCAL & STATE PERMITS PRIOR TO BEGINNING ANY CONSTRUCTION 6, FIELD CHANGES SHALL HAVE PRIOR APPROVAL BY THE TOWN, 7, UNLESS OTHERWISE NOTED OR SPECIFIED, ALL ROADWAYS & STORM DRAINAGE SHALL BE CONSTRUCTED IN CONFORMANCE WITH THE STATE OF CONNECTICUT, D,O,T, "STANDARD SPECIFICATIONS FOR ROADS, BRIDGES, AND INCIDENTAL CONSTRUCTION, FORM 814A, 1985 SIMILARLY PERTINENT CONSTRUCTION DETAILS THAT ARE NOT INCLUDED WITH THESE DRAWINGS SHALL CONFORM TO THE STATE OF CONNECTICUT, D,O,T, STANDARD ROADWAY DRA'NINGS, 8, CONTRACTOR SHALL NOTIFY THE TOWN ENGINEER OF CONSTRUCTION SCHEDULE SO THAT INSPECTION MAY BE PROVIDED, 9, UNDERGROUND UTILITY, STRUCTURE AND FACILITY LOCATIONS DEPICTED ON. PLANS HAVE BEEN COMPILED, IN PART, FROM RECORD MAPPING SUPPLIED BY ' THE RESPECTIVE UTILITY COMPANIES OR GOVERNMENI.AL AGENCIES, FROM PAROL TESTIMONY, FIELD MEASUREMENTS AND FROM OTHER SOURCES, THESE LOCATIONS MUST BE CONSIDERED APPROXIMATE IN NATURE, ADDITIONALLY, OTHER SUCH FEATURES MAY EXIST ON THE SITE, THE EXISTENCE OF WHICH ARE UNKNOWN TO CME ASSOCIATES, INC, THE SIZE, LOCATION AND EXISTENCE OF ALL SUCH FEATURES MUST BE FIELD DETERMINED AND VERIFIED BY THE APPROPRIATE AUT'HORITiES PRIOR TO CONSTRUCTION, CONTACT "CALL BEFORE YOU DIG" AT 1-800--922-4455 THREE (3) WORKING DAYS PRIOR TO THE START OF ANY CONSTRUCTION ACTIVITY, PERSON RESPONSIBLE FOR MAINTAINING CONTROL MEASURES DURING CONSTRUCTION, NAME - ADDRESS - TE LEPHONE MAINTENANCE LOG LOCATION DESCRIPTION DATE INITIALS I--- < rx Ljj Q n- C� I V (D (D co M o tt' 0 (/ ) o Q N 0 N 0 N 0 -� o o o ce 2 O Q w U d O tl CSA C�7 iJ DATE; AUG, 41 2005 PROJECT DATES DATE INITIALS PROJECT GROUtiDBRFAKING FINAL STABILIZATION Q � I--- < rx Ljj Q n- C� I V (D (D co M o tt' 0 (/ ) o Q N 0 N 0 N 0 -� o o o ce 2 O Q w U d O tl CSA C�7 iJ DATE; AUG, 41 2005 SCALE: 1 "=20' PROJECT# 2005163 SHEET 4 OF 5 N E �. �. 163 r cp ) `111, 00 Q 00 a ---� i C + CL y V C) ^u w ,y �Q 00N (A Ln r out r w w w Q Q C)to e1r) 0C7 LOCUS, 0 I do � 11V 14/ 41 q tO to 'Coo f J } oWL E J/ j( s kf It - M 4 r � � � � � � .twig r z+?t �'rI�,t 1 MQNTVILLE ?�,q Y 3 / a+'i�.1 Kx.�..�#•:�;�'"i ^1�sss?) 1-rE {� t x,.'r:. `" 'fi'• \1/ \V A \V w w w w ' zFr��} Posh / � � � ��// � �, .(� � 'may'"-, ',V �I/ +1.' � tr�ce.�s�x" rye,•;; s., �;K414�# 1 % / / I APPROXIMATE LIMITS _ / �/� -.. ,yam. � � w �, w-...�• �' O"94C''yC� '�' / GF PROPOSED 41 ACTIVITY � (±0.8 ACRES} LOCATION MAIC SCALE 1 -1000 I "�^.»p.."'wrwaww �-'' / ////// • 4 I i. , / I 1 ! 1 1 � ' �' Y `Y w w ...^'"" '" ,,..••" _ ' 1 4 V1 . 1 t I 1 1 I 1 1 1 1 A I . I 1 I , , 4 I �/ •\ `Y w `Y W `\ w ....�...a-. -..... �...+.i•. f fj . I r i 1 , �.M++f" I ,,,, , t A i . ,. '�A i , \\\ �..�"�•r ••-+." 1' 1 1 '' 1 a e' 1 1 1 1 ' t - I I 4 1 , i t' 1' 1' ��ft 1' i' 1' 1 \ ' � '/� �✓'" { 1 I ! 1 1 4 1 � F 1 1 t 1 i 1 1 l 1 ' I�� �� , i I F 4! � 1 1 Y'\ w "✓ - �I A , I , 1 I I' . ' , ' 1. . { , 4 , , 1 , 1 { \ 1 1 { . . . ' 1 . �. ' 1 ` w W w _ � /(J 1 , A. A. . I , MATERIAE -STAGING .. a . . I ' , ' I C 1 AREAR t� .., %I I , . . . 1 ' , , , i W W � � Y' \✓ W � � i { / f••!4`l{`' 1 • � t 1 `'' 111 41�1(/�. IL .' 1 ._' /' 1 1 i l'. . 1 . ! F' 1. .'.'. I 1. 'Y W `!' #25 1µI4 - ^°'V..� ~`°'•^�+.. .,,,,....+n ///! /•�• / , . , I , ! F t l . , . . t . , . I , 4 . I . . 1 , I . . 1 , ' . I I S•�'".+• # . ,`\\ Y I 1 1 . . 1 I. . t '. 1 I, I . I 1 „ll -. • �•�.,,.+... / / � ! . { , 'I , . . I , I . . , . . i , I e . I i i I . t I . 1 t .\\ sit ,\ , a 1 it 1 ! I. 1 Y 1 1 i i , 1 1 . { I F 1 a . 1 i . /a { , , . ' 11 ��/ W `Y W `Y ' TEMPORARY PUMP . ^^-r ....-.-....��� ��•! //� ` - . 1 / , ' A' I 1 F 1 (moi'• DISCHARGE BASIN .'1,..... , . / ��,� / • ^ . . A 1' i 1 1 ' (DEPTH 2 } I . I 1 I 1 A I I A A I I A A 1 { 4 l • ./�•.'.� �_ �.�� ''•...�. \ '. t 1 i I ' , t { . 1 1 1 l , l 1 • � ' ! I I a ' t 11 •! -A/ . 1 1 1 ) 1 . 1 1 1 1 1 1 !' I' l' 1 1 1 1 I ��,.�,.�-•� �,..,�,,....�.��, \ / tf( i ! F , ! F i e . i F F 1 i A 6 1 , A , e I 1 I A MAP #045 LOT #008—OOA \ . , ! , .. 1 , I 1 M l N /F MICHAEL. MATERA �f IF}.'I t'4' 1 .� , 1 4 . , A AREA 10 t ACRES / j' t I .. , F ,' 1 , ,32 , .(.I' i `f •" Y' . WL \ \/ ' A 1 A \ c7 32 \ SEE WETLAND PLANTING PLAN NOTE # (TYPE) / uj' . . . . . . ' , , . r ( �� q �—•^i / ems'L F ' F I. F. I 1 ' ! , i 1 . \ I z c<r O , , , , .Li APPROXIMATE AREA OF LAWN / R01P,o'SED,'E'DcE,'ciF RaN,DIV � I._, , SEEDING TO COVER DISTURBED / AREA �9a0I S.F. I NOTESI ((/�/`�W^✓//��j7 AREAS NOT PLANTED WITH LAND SPECIE \ WET S I ., . .' .' 1. F , , , , , , , I STING EDGE OF POND CL&P �''� ', I E D 11 NORMAL POND WATER LEVEL WEIR ELEVATION IS ±331 FT :` . , WL 1 ( ) #12771 F .. \ .. {�, /�(r \,�\��\,\ e .. , \ #1a \� AND WILL NOT CHANGE, /I 1 '1..'.'I AIF 1 \ 1 1 I1 . I. . e'1 1 1'L'I'1' / t,1F,IF .,.. 3 2,) APPROXIMATE VOLUME OF MATERIAL TO BE REMOVED FROM WETLAND PLANTING PLAN / . {. �� 1 I \ 1 . ' 1' '1' ' t' 1' I' l' 1' I' , t1 1 . I , F � / � • EXISTING POND (BELOW 327 FT) IS ±370 CY. THE MATERIAL DREDGED FROM THE POND WILL BE STOCKPILED,' ALLOWED TO y 11 A PORTION O F E M � , ///.// , , . , . , f , I 1 i . , A � r(I DRAIN AND MAINTAINED ON SITE FOR RE -USE AS TOPSAIL ALONG THE EDGE OF THE WETLAND. I F / IFI .�,I , d , , , , , �\ 3,) ELEVATIONS ARE BASED ON AN ASSUMED DATUM, ' FOUR INCHES OF THIS MATERIAL WILL BE PLACED ALONG THE BOTTOM OF. THE"," "','.`,'.'I'.'t'I' A MINIMUM OF POND, FROM THE POND EDGE TO A WATER DEPTH OF ONE FOOT, AND ABOVE THE POND EDGE',' ',' ',',',',",' l ,�,.,,,�, WHERE SHRUBS ARE TO BE PLANTED, ,..I , . ..,I �..,,1.,.( \ ,�?. / \ 2, A MINIMUM OF 100 LINEAR FEET OF THE NEW POND SHORELINE WILL BE PLANTED WITH � Q �~` ..� SEE W�rL.ANa PLANTING �� � � � � Z MATURE WETLAND SHRUBS, SHRUBS WILL BE PLANTED AT A GROUND SURFACE ELEVATION ONE. _ J S(p(� PLAN NOTE #2 (TYP.) -� - � �, �2 � ,� \ FOOT ABOVE THE NORMAL WATER ELEVATIONS, AND AT A SPACING FIVE FEET ON CENTER.�'�� U Ld SHRUBS WILL INCLUDE; HIGHBUSH BLUEBERRY (VACCINUM CORYMBOSUM), SILKY DOGWOOD 0 _ � �, � 1 � ALDER ALNUS SERRULATA AND COMMON WINTERBERRY (ILEX d Q \ _� �� ER (CORNUS AMOMUM), ( ), 4 `\ 2q >> VERTICILLATA), THE REMAINING PORTION OF THE NEW POND EDGE WILL BE CONTIGUOUS �- ,� (� `�-\� ,� \ \_ ��, / ' -P ANTED WITH A MIXTURE OF COMMON RED / WITH .THE SITES LAWN AREA, AND WILL B E L �. '� WL PERENNIAL RYE GRASS 10 a j *_�12 FESCUE 70 PERCENT), KENTUCKY BLUEGRASS (20 PERCENT) AND ( \ \. (�' . PROPOSED �� /� % U► PERCENT). \ \ \STONE DIKE 34 THE SLOPES OF THE BANK HABITAT FROM THE .POND EDGE TO A DEPTH OF ONE FOOT BELOW THE NORMAL POND ELEVATION WILL BE SEEDED WITH A MIXTURE OF ARROW ARUM w� US EFFUSES CATTAIL �'-,. \ \ � i � (PELTANDRA VIRGINICA), BLUE FLAG (IRIS VERiSCOLOR) SOFT RUSH (JUNG ), \ \ \ ro #1 (TYPHA SP.), PICKEREL WEED (PONTEDERIA CORDATA), AND BURREED (SPARGANIUM �, �, ��� ♦ �/ EURYCARPUM)1 0 \ \ \ \ �1� DRY HYDRANT PER 4, FOLLOWING PLANTING, A QUALIFIED WETLAND SCIENTIST WILL INSPECT THE SITE WITHIN THE \ \ MONTVIL.LE FIRE MARSHAL. �a / ~ w z MONTHS OF THE SUBSEQUENT GROWING SEASON TO ENSURE THE VIABILITY Or \ �� I FIRST FOUR TO SIX MO `'� THE PLANTED SHRUBS AND OTHER WETLAND PLANTS, IN THE EVENT THAT ADDITIONAL PLANTINGS ¢ Q CREATION AND POND BANK STABILIZATION, THE \ C I GOALS OF HABITATRECONSTRUCT EARTHEN DAM. � ARE .NEEDED TO ACHIEVE THE 0 OWNER WILL ' ARRANGE FOR THESE PLANTINGS IN ACCORDANCE WITH THE WETLAND SCIENTISTS ` �'~ -_ AS REQUIRED _ Ln Ln d -' � o a o RECOMMENDATIONS, ," m N d' U) D N N z LLL n p O W LL. u O -� DATE: AUG. 4, 2005 i 20 10 a zo �-•, � HEL_TCO GRAPHIC SCALE IN FEET �`'X68$6 mollSCALE: 1 "-20' QUALITY CONTROL CERTIFICATION PROJECT 2005163 GROUP REVIEWED DATE PROJECT MANAGER SURVEY ENVIRONMENTAL .,�Aj to -CA�_ CIVIL - STRUCTURAL 0. ARCHITECTURAL _ _ _ to. - Q z . 0- Lli sip Z a Lj ��.. LJJ PLAN NOTE # (TYPE) / uj' . . . . . . ' , , . r ( �� q �—•^i / ems'L F ' F I. F. I 1 ' ! , i 1 . \ I z c<r O , , , , .Li APPROXIMATE AREA OF LAWN / R01P,o'SED,'E'DcE,'ciF RaN,DIV � I._, , SEEDING TO COVER DISTURBED / AREA �9a0I S.F. I NOTESI ((/�/`�W^✓//��j7 AREAS NOT PLANTED WITH LAND SPECIE \ WET S I ., . .' .' 1. F , , , , , , , I STING EDGE OF POND CL&P �''� ', I E D 11 NORMAL POND WATER LEVEL WEIR ELEVATION IS ±331 FT :` . , WL 1 ( ) #12771 F .. \ .. {�, /�(r \,�\��\,\ e .. , \ #1a \� AND WILL NOT CHANGE, /I 1 '1..'.'I AIF 1 \ 1 1 I1 . I. . e'1 1 1'L'I'1' / t,1F,IF .,.. 3 2,) APPROXIMATE VOLUME OF MATERIAL TO BE REMOVED FROM WETLAND PLANTING PLAN / . {. �� 1 I \ 1 . ' 1' '1' ' t' 1' I' l' 1' I' , t1 1 . I , F � / � • EXISTING POND (BELOW 327 FT) IS ±370 CY. THE MATERIAL DREDGED FROM THE POND WILL BE STOCKPILED,' ALLOWED TO y 11 A PORTION O F E M � , ///.// , , . , . , f , I 1 i . , A � r(I DRAIN AND MAINTAINED ON SITE FOR RE -USE AS TOPSAIL ALONG THE EDGE OF THE WETLAND. I F / IFI .�,I , d , , , , , �\ 3,) ELEVATIONS ARE BASED ON AN ASSUMED DATUM, ' FOUR INCHES OF THIS MATERIAL WILL BE PLACED ALONG THE BOTTOM OF. THE"," "','.`,'.'I'.'t'I' A MINIMUM OF POND, FROM THE POND EDGE TO A WATER DEPTH OF ONE FOOT, AND ABOVE THE POND EDGE',' ',' ',',',',",' l ,�,.,,,�, WHERE SHRUBS ARE TO BE PLANTED, ,..I , . ..,I �..,,1.,.( \ ,�?. / \ 2, A MINIMUM OF 100 LINEAR FEET OF THE NEW POND SHORELINE WILL BE PLANTED WITH � Q �~` ..� SEE W�rL.ANa PLANTING �� � � � � Z MATURE WETLAND SHRUBS, SHRUBS WILL BE PLANTED AT A GROUND SURFACE ELEVATION ONE. _ J S(p(� PLAN NOTE #2 (TYP.) -� - � �, �2 � ,� \ FOOT ABOVE THE NORMAL WATER ELEVATIONS, AND AT A SPACING FIVE FEET ON CENTER.�'�� U Ld SHRUBS WILL INCLUDE; HIGHBUSH BLUEBERRY (VACCINUM CORYMBOSUM), SILKY DOGWOOD 0 _ � �, � 1 � ALDER ALNUS SERRULATA AND COMMON WINTERBERRY (ILEX d Q \ _� �� ER (CORNUS AMOMUM), ( ), 4 `\ 2q >> VERTICILLATA), THE REMAINING PORTION OF THE NEW POND EDGE WILL BE CONTIGUOUS �- ,� (� `�-\� ,� \ \_ ��, / ' -P ANTED WITH A MIXTURE OF COMMON RED / WITH .THE SITES LAWN AREA, AND WILL B E L �. '� WL PERENNIAL RYE GRASS 10 a j *_�12 FESCUE 70 PERCENT), KENTUCKY BLUEGRASS (20 PERCENT) AND ( \ \. (�' . PROPOSED �� /� % U► PERCENT). \ \ \STONE DIKE 34 THE SLOPES OF THE BANK HABITAT FROM THE .POND EDGE TO A DEPTH OF ONE FOOT BELOW THE NORMAL POND ELEVATION WILL BE SEEDED WITH A MIXTURE OF ARROW ARUM w� US EFFUSES CATTAIL �'-,. \ \ � i � (PELTANDRA VIRGINICA), BLUE FLAG (IRIS VERiSCOLOR) SOFT RUSH (JUNG ), \ \ \ ro #1 (TYPHA SP.), PICKEREL WEED (PONTEDERIA CORDATA), AND BURREED (SPARGANIUM �, �, ��� ♦ �/ EURYCARPUM)1 0 \ \ \ \ �1� DRY HYDRANT PER 4, FOLLOWING PLANTING, A QUALIFIED WETLAND SCIENTIST WILL INSPECT THE SITE WITHIN THE \ \ MONTVIL.LE FIRE MARSHAL. �a / ~ w z MONTHS OF THE SUBSEQUENT GROWING SEASON TO ENSURE THE VIABILITY Or \ �� I FIRST FOUR TO SIX MO `'� THE PLANTED SHRUBS AND OTHER WETLAND PLANTS, IN THE EVENT THAT ADDITIONAL PLANTINGS ¢ Q CREATION AND POND BANK STABILIZATION, THE \ C I GOALS OF HABITATRECONSTRUCT EARTHEN DAM. � ARE .NEEDED TO ACHIEVE THE 0 OWNER WILL ' ARRANGE FOR THESE PLANTINGS IN ACCORDANCE WITH THE WETLAND SCIENTISTS ` �'~ -_ AS REQUIRED _ Ln Ln d -' � o a o RECOMMENDATIONS, ," m N d' U) D N N z LLL n p O W LL. u O -� DATE: AUG. 4, 2005 i 20 10 a zo �-•, � HEL_TCO GRAPHIC SCALE IN FEET �`'X68$6 mollSCALE: 1 "-20' QUALITY CONTROL CERTIFICATION PROJECT 2005163 GROUP REVIEWED DATE PROJECT MANAGER SURVEY ENVIRONMENTAL .,�Aj to -CA�_ CIVIL y STRUCTURAL ARCHITECTURAL _ _ _