Loading...
HomeMy WebLinkAboutStaff Report (2)\\planning\planningoffice$\CurrentProjects\IWC\2021\Archived\221 IWC 2 (75 Pink Row) Expansion of Outside Storage Lot\Staff\(IWC 2) Staff Report 4-15-2021.doc Applicant: GL & C Construction, LLC Address: 75 Pink Row (074-040-000) Date Received by Commission: February 18, 2021 Meeting Date: April 15, 2021 Applicant Request  Expand existing storage lot. Activity Description Wetland Disturbance Area 560 sqft Upland Review Disturbance Area 9,700 sqft Watercourse/ Waterbody Disturbance Area 0 Staff Comments  Uncas Health comments have been meet. (2-19-2021)  All Town Soil Scientist comments have been meet. (4-6-2021)  The Town Engineer has the following comments: o A Drainage Easement shall be provided to the Town by the developer for review. o The 20’ drainage easement must include the 15” culvert running parallel to Pink Row o A bond in the of amount of $14,000 is to be posted prior to the start of construction Draft Motion 1 After giving due consideration to all relevant factors including those in Section 10 and or Section 4 of the Montville Inland Wetland Regulation and Section 22a-41 of the Connecticut General Statutes, I move to approve application 221 IWC 2 Owner/Applicant: GL & C Construction, LLC An application for the construction of a drainage and expansion of storage lot within the regulated area on the property located at 75 Pink Row, Uncasville, CT. As shown on Assessor’s Map 74 Lot 40 as depicted in the application and narrative dated 2-19-2021. Site development Plan 75 Pink Row prepared for GL & C Construction, LLC Montville CT dated June 15, 2020 rev 3/10/2021. This is a conditional approval. Each and every condition is an integral part of the Commission decision. Should any of the conditions, on appeal from this decision, be found to be void or of no legal effect then this conditional approval is likewise void. Should any of the conditions not be implemented by the applicant or his successors within the specified permit time period, then this conditional approval is void. \\planning\planningoffice$\CurrentProjects\IWC\2021\Archived\221 IWC 2 (75 Pink Row) Expansion of Outside Storage Lot\Staff\(IWC 2) Staff Report 4-15-2021.doc Conditions of approval are: 1. The plan to be revised to include 20’ wide easement must include the 15” culvert parallel to Pink Row and the catch basin. 2. Provide drainage easement to the Town for review and acceptance. 3. Prior to the start of construction the applicant shall post a $14,000 erosion and sediment control bond (Standard Reasons for Approval Apply) Standard Reasons for Approval 1. The environmental impact of the proposed project does not have a significant effect on the inland wetland's and watercourse's capacity to support fish and wildlife, to prevent flooding, to supply and protect surface and groundwater, to control sediment, to facilitate drainage, to control pollution, to support recreational activities, and to promote public health and safety. 2. The Commission has determined that the relationship between the short-term uses of the environment and the maintenance and enhancement of long-term productivity will have no impact on the surrounding wetland system 3. The proposed activity will not have irreversible and irretrievable commitments of resources. 4. The proposed project will not change the character and or add degree of injury to, or interference with, safety, health, or the reasonable use of property, including abutting or downstream property. 5. The proposed activity use is suitable to the area. 6. The applicant has taken all feasible measures to mitigate the impact of any aspect of the proposed regulated activity.