Applicant Request
Expand existing storage lot.
Activity Description
Wetland Disturbance Area 560 sqft
Upland Review Disturbance Area 9,700 sqft
Watercourse/ Waterbody Disturbance Area 0
Staff Comments
Uncas Health comments have been meet. (2-19-2021)
All Town Soil Scientist comments have been meet. (4-6-2021)
The Town Engineer has the following comments:
o A Drainage Easement shall be provided to the Town by the developer for review.
o The 20’ drainage easement must include the 15” culvert running parallel to Pink
Row
o A bond in the of amount of $14,000 is to be posted prior to the start of
construction
Draft Motion 1
After giving due consideration to all relevant factors including those in Section 10 and or Section
4 of the Montville Inland Wetland Regulation and Section 22a-41 of the Connecticut General
Statutes, I move to approve application
221 IWC 2 Owner/Applicant: GL & C Construction, LLC An application for the
construction of a drainage and expansion of storage lot within the regulated area on the property
located at 75 Pink Row, Uncasville, CT. As shown on Assessor’s Map 74 Lot 40 as depicted in
the application and narrative dated 2-19-2021. Site development Plan 75 Pink Row prepared for
GL & C Construction, LLC Montville CT dated June 15, 2020 rev 3/10/2021.
This is a conditional approval. Each and every condition is an integral part of the Commission
decision. Should any of the conditions, on appeal from this decision, be found to be void or of no
legal effect then this conditional approval is likewise void. Should any of the conditions not be
implemented by the applicant or his successors within the specified permit time period, then this
conditional approval is void.
\\planning\planningoffice$\CurrentProjects\IWC\2021\Archived\221 IWC 2 (75 Pink Row) Expansion of Outside Storage Lot\Staff\(IWC 2) Staff
Report 4-15-2021.doc
Conditions of approval are:
1. The plan to be revised to include 20’ wide easement must include the 15” culvert parallel
to Pink Row and the catch basin.
2. Provide drainage easement to the Town for review and acceptance.
3. Prior to the start of construction the applicant shall post a $14,000 erosion and sediment
control bond
(Standard Reasons for Approval Apply)
Standard Reasons for Approval
1. The environmental impact of the proposed project does not have a significant effect on
the inland wetland's and watercourse's capacity to support fish and wildlife, to prevent
flooding, to supply and protect surface and groundwater, to control sediment, to facilitate
drainage, to control pollution, to support recreational activities, and to promote public
health and safety.
2. The Commission has determined that the relationship between the short-term uses of
the environment and the maintenance and enhancement of long-term productivity will
have no impact on the surrounding wetland system
3. The proposed activity will not have irreversible and irretrievable commitments of
resources.
4. The proposed project will not change the character and or add degree of injury to, or
interference with, safety, health, or the reasonable use of property, including abutting or
downstream property.
5. The proposed activity use is suitable to the area.
6. The applicant has taken all feasible measures to mitigate the impact of any aspect of
the proposed regulated activity.