Town of Montville Planning Department Date: January 30, 2020
310 Norwich New London Tpke
Uncasville, Ct. 06382
(860) 848-8549 Ext 379 Fax (860) 848-2354
Email: planningdept@montville-ct.org
To: Town Engineer New London Water Building Dept Assessor
Town Attorney Norwich Water Fire Marshal Police
Uncas Health Mayor DOT CAM
WPCA Public Works DEP Other
Project Name: 219 IWC 6 (Deer Run Stable, LLC)
Project Location: 1495 & 1505 Route 85 (Map 5 Lots 23-A & 24-A)
The following have been transmitted
Application via Email Copy of Letter via Email Plans via Email
Regulations via Email Other via Email
Description
Gasoline And Convenience Store Facility Storage Tank
Transmitted as checked below. Your comments must be received on or before: 2/10/2020
For approval For your use As requested For your review and comment
Note: Comments are to be returned to planningdept@montville-ct.org
Remarks:
Signed Colleen Bezanson, Planner II/Wetlands Agent
LETTER OF TRANSMITTAL
Y:\Environmental Health\Development Plans\IWC Montville\Rt 85 - 1499 & 1505 - PR2 Conv store + coffee 4-10-20.doc
Reviewing Agency: Uncas Health District
Review Date: April 10, 2020
Reviewed By: Michael J. Kirby, R.S., Chief Environmental Sanitarian
Project Name: 219 IWC 6 (Deer Run Stable, LLC)
Project Location: 1495 & 1505 Route 85 (Map 5 Lots 23-A & 24-A)
Comments:
Plan revised 3/11/20
1] The District cannot issue any approvals until the well site is approved by CT
Department of Public Health’s Drinking Water Section as the well will be a public water
supply.
2] Additional test holes will be required.
3] The bottom of the GST appears to be only 14″ above the bottom of the deepest test hole.
The bottom of the GST must be a minimum of 48″ above the bottom of the test hole.
4] H-20 loading specifications for the GST must be provided.
5] Prior to the start of construction a benchmark is to be set in the area of the septic system.
6] Prior to the start of construction, the building, well and system are to be staked by a
licensed surveyor.
Electronic Signature: Michael J. Kirby, R.S.