HomeMy WebLinkAboutSite PlanGENER& NOTES 1- MILONE & MACBROOM INC. ACCEPTS NO RESPONSIBILITY FOR THE ACCURACY OF MAPS AND DATA WHICH HAVE BEEN SUPPLIED BY OTHERS. 2. NORTH ARROW, BEARINGS AND COORDINATES ARE BASED UPON THE CONNECTICUT COORDINATE SYSTEM (NAD 1983) 3- INLAND WETLANDS IDENTIFIED AND LOCATED BY MILONE AND MACBROOM INC., FEBRUARY 2006 4- ALL CONSTRUCTION MATERIALS AND METHODS SHALL CONFORM TO THE TOWN'S REQUIREMENTS AND TO THE APPLICABLE SECTIONS OF THE STATE OF CONNECTICUT DEPARTMENT OF TRANSPORTATION STANDARD SPECIFICATION FOR ROADS, BRIDGES, FACILITIES AND INCIDENTAL CONSTRUCTION, FORM 817 AND ADDENDUMS. 5. THE PLANS REQUIRE A CONTRACTOR'S WORKING KNOWLEDGE OF LOCAL, MUNICIPAL, AND STATE CODES FOR UTILITY SYSTEMS. ANY CONFLICTS BETWEEN MATERIALS AND LOCATIONS SHOWN AND LOCAL REQUIREMENTS SHALL BE BROUGHT TO THE ENGINEER'S ATTENTION PRIOR TO THE EXECUTION OF THE WORK. THE ENGINEER WILL NOT BE HELD LIABLE FOR COSTS INCURRED TO IMPLEMENT OR CORRECT WORK WHICH DOES NOT CONFORM TO LOCAL CODE. 6. ALL DIMENSIONS AND ELEVATIONS SHALL BE VERIFIED IN THE FIELD PRIOR TO CONSTRUCTION. ANY DISCREPANCIES SHALL BE BROUGHT TO THE ATTENTION OF THE ENGINEER IMMEDIATELY FOR DETERMINATION. 7. ALL UTILITY SERVICES ARE TO BE UNDERGROUND. THE EXACT LOCATION AND SIZE OF ELECTRIC, TELEPHONE, AND CABLE ARE TO BE DETERMINED BY THE RESPECTIVE UTILITY COMPANIES. 8. SEDIMENT AND EROSION CONTROL MEASURES AS DEPICTED ON THESE PLANS AND DESCRIBED WITHIN THE SEDIMENT AND EROSION CONTROL NARRATIVE SHALL BE IMPLEMENTED AND MAINTAINED UNTIL PERMANENT COVER AND STABILIZATION IS ESTABLISHED. ALL SEDIMENT AND EROSION CONTROL MEASURES SHALL CONFORM TO THE "2002 CONNECTICUT GUIDELINES FOR SOIL EROSION AND SEDIMENT CONTROL AND IN ALL CASES BEST MANAGEMENT PRACTICES SHALL PREVAIL. 9. SEDIMENT AND EROSION CONTROL MEASURES AS DEPICTED ON THESE PLANS SHALL BE IMPLEMENTED AND MAINTAINED UNTIL PERMANENT COVER AND STABILIZATION HAS BEEN ESTABLISHED. 10. COMPLIANCE WITH THE PERMIT CONDITIONS IS THE RESPONSIBILITY OF BOTH THE CONTRACTOR AND THE PERMITEE. 11. SUBSURFACE SEWAGE DISPOSAL SYSTEM AREA TO BE STAKED OUT AND MARKED TO PREVENT DISTURBANCE FROM OTHER CONSTRUCTION ACTIVITIES. 12. BASED UPON AVAILABLE INFORMATION THERE ARE NO SEPTIC SYSTEMS OR WATER SUPPLY WELL WITHIN THE REQUIRED SEPARATION DISTANCES OF THE PROPOSED LEACHING SYSTEM. 13. ENGINEER TO STAKE LOCATION OF SEPTIC SYSTEM WITH ELEVATIONS FOR BOTTOM OF LEACHING GALLERIES AND SET BENCH MARK IN AREA OF SYSTEM. 14• ALL DISTURBED AREAS SHALL RECEIVE A MINIMUM OF 4" TOPSOIL, AND BE SEEDED WITH GRASS OR SOD, AS SHOWN ON THE PLANS. SURVEY NOTES 1. THIS SURVEY AND MAP HAS BEEN PREPARED IN ACCORDANCE WITH SECTIONS 20-30OB-1 THROUGH 2O-3006-20 OF THE REGULATIONS OF CONNECTICUT STATE AGENCIES "MINIMUM STANDARDS FOR SURVEYS AND MAPS IN THE STATE OF CONNECTICUT' AS ENDORSED BY THE CONNECTICUT ASSOCIATION OF LAND SURVEYORS, INC. IT IS AN IMPROVEMENT LOCATION SURVEY BASED ON A DEPENDENT RESURVEY CONFORMING TO HORIZONTAL ACCURACY CLASS A-2. 2. NORTH BASED UPON THE CONNECTICUT STATE PLANE COORDINATE SYSTEM (NAD 1983) ESTABLISED BY G.P.S 3. NFORMATIQN REGARDING THE LOCATION OF EXISTING UNDERGROUND UTILITIES HAS BEEN BASED UPON AVAILABLE INFORMATION AND MAY BE INCOMPLETE AND WHERE SHOWN SHOULD BE CONSIDERED APPROXIMATE. THE LOCATION OF ALL EXISTING UTILITIES SHOULD BE CONFIRMED PRIOR TO BEGINNING CONSTRUCTION. CALL CALL BEFORE YOU DIG" 1-800-922-4455. ALL UTILITY LOCATIONS THAT DO NOT MATCH THE VERTICAL OR HORIZONTAL CONTROL SHOWN ON THE PLAN SHALL IMMEDIATELY BE BROUGHT TO THE ATTENTION OF THE ENGINEER FOR RESOLUTION. 5. CURRENT ZONING DISTRICT = R-40 RESIDENTIAL ZONING DATA r C 41C Construction Sequence for Wetlands Crossin:7 1. A licensed surveyor shall stake out the location of the following items prior to construction: a. Property lines adjacent to the crossing, wetland (lags WI,w-t through A'Lw-3, Vti l w-200 through W1_w212 and WI.w-219 through WI.w-225 and associated 50' town regulated upland boundary as shown on the site plans. b. Limit of clearing associated with the proposed driveway. c. Centerline of proposed driveway with cut and fill depths. 2. Install a perimeter silt fence and sediment controls as shown on the site plans. 3. Clear and grub the area of access road up to the northern side of the first crossing. 4. Install water bars and stone check dams on the northern side ofthe crossing. 5. Install stone access drive to the northern side of crossing. 6. Remove organic material at the crossing and stockpile for later use. 7. All dewatering wastewaters shall be discharged in a manner which minimizes the discoloration of the receiving waters. 8. Install seepage envelope, drainage pipes, riprap pads and pervious fill to span the crossing. 9. Install perimcter silt fence and sediment controls on the south side of the first crossing Along the access drive as shown on the site plans. 10. Clear and grub each area ofaccess road up to northern side ofthe second crossing. 11. Repeat steps 4 through. 8 for second crossing. General Erosion Control Notes a. Sediment and erosion controls shall be inspected at least once aweek and within 24 hours of the end of a stone with a rainfall amount of 0.5 inch or greater. b. The sediment and erosion control plan shall be modified by flue contractor at the direction of the engineer and the towns' designated representative as necessitated by changing site conditions. c. Inspection of the crossing and access road shall continue for a period ofthree months after completion when rainfalls ofone inch or more occim Wetlands CrossinaGe_neral Notes 1. All equipment and materials stored on site shall be located outside designated wetland arem All storage areas shall be ringed with hay bales and silt fence. 2. No refueling operations shall take place within 100' of any wetlands area. 3. The contractor shall minimize equipment fording wetlands until the crossing is completed. 4. TJrdess otherwise noted, all construction vc+icics shall remain on the access road, 5. All sedimentation and erosion controls shall conform to the 2002 Connecticut Guidelines for Soil Erosion and Sediment Control. 6. Crossing installation should occur dwing lo -..v flow, between June 1 to September 30. 1•he contractor will monitor weather conditions, and shall not work during significant rain events. 7• Time for cro4sings construction should take between four toeiglrL weeks to ( _ 12. Install perimetersilt fence and sediment controls on south side of the second crossing complete construction, j along the access drive as shown on the site plans. / 4 13. Install buried utility conduits a5 required through the crossing.-.---'- ti , ,•-•. _, - 14. Clear and grub the access drive to the Lot 4 property boundary. 15. Install remaining portion ofstone access drive to Lot 4 property boundary. , ` ----- lb. Topsoil, seed and mulch access road shoulders and install plantings as shown on the site plans. REGULATED ACTIVITY #1 CONSTRUCTION OF DRIVEWAY AND UNDERGROUND UTILITIES CLEARING AND GRADING ASSOCIATED WITH DRIVEWAY CONSTRUCTION 50' UPLAND REVIEW AREA: ±4,700 SQ.FT. f DIRECT WETLAND:±2,000 SQ.FT. m -a i 8 171) w--23 WL w-22 i N WL w-239 WL w-240 w WL w-21 / WL w-241 141000w-238 \ CURRENT DIVISION lVV4 w-20WL w-237 WL w- 42 LINE TO BE REMOVED VL w-19 f vn ,-243 APPROXIMATE 100 YEAR FLOOD PLAIN ZONE AE WL w-18 LOT 4 505,880 SQ.FT. ACCESS AND UTILITY w -n i^ 11.613 AC. EASEMENT IN FAVOR OF LOT 4 WL M-16 WL «-2M , ,' / HL as 35,005 SQ.FT. // - - WOODCHIP FILTER BERM LOT 3 / ` \- las PROPOSED WETLANDS PLACARDSF / 379.140 SQ.FT. I „ / \ -TYPICAL WL w-,4 AC. "- / ` \ LIMIT OF 50' REGULATED AREA _.._. 4 1\\ 1\ \ \\ TYPICAL 0 w-246 3f WL w-25, _. --7x WL w 253w^ a.. , \ "' .... - •1" - NL w-252 _ 2.". WL w-249 WL J248 + -- 140 - WL -t-• fa T y _ 1 WL 2$U 160 ws WL w-231 - ". __ -' WL w- % WL w-230 170 W. w-218 wt «-215 •. - --'w'^r: -- -----..,•.....--- WL a- 164`:/ WL w-228 ...`.- AL- ---- _ T -- WL w--2,3_ w ... \ 1 i 1' CONSTRUCTION ENTRANCE ZONE R-40 REQUIRED PERMITTED PROPOSED MIN. LOT AREA 40,000 SQ.FT. 885,020 SQ.FT. 20.317 AC MIN. LOT WIDTH 150' 406,22 FRONT SETBACK 40 40' SIDE SETBACK 15 427 REAR SETBACK 40 201.5 MAX. HEIGHT MAIN BUILDING 35 35 REGULATED ACTIVITIES DIRECT WETLAND IMPACTS ±4,800 SQ.FT. DIRECT WATERCOURSE IMPACTS NONE 50UPLAND REVIEW AREA OF DISTURBANCE ±8,350 SQ.FT. NOTE: TOTAL WETLAND AREA ON LOTS 3 AND 4 442,887 SQ.FT. (10.17 AC.) ALL DISTURBED AREAS WITHIN - _ _....._ -. tt / UPLAND REVIEW AREAS SHALL BE SEEDED WITH NEW ENGLAND -_ _ 200 WILDLIFE AND CONSERVATION SEED :-. \ ,/ , •`- `/ ,/ _.. / f 2A6 PLOT PL.Ai MIX PROVIDED BY NEW ENGLAND - PLANT INC. SEE PLANT LIST \ / `' '' -'' ! FRANC 4 1 • - •. ,, LOTS 3r / / r'•Ei:` NYS LA[ REGULATED ACTIVITY #2 = t OivTVILLE CONSTRUCTION OF DRIVEWAY AND st'art zs sr /I / / ! y:;% A% . • ee, UNDERGROUND UTILITIES / / +S'•1t5k'a,+`<4` CLEARING AND GRADING ASSOCIATED!OR G , ADSWITHDRIVEWAYCONSTRUCTION 'ljrf ralllElt4r,4u w' 50' UPLAND REVIEW AREA: ±3,650 SQ.FT. '_,.. _ .' DMONED DRAWN DIRECT WETLAND:12,800 SQ.FT. SCALE IWA REVISED: JULY 14, 2020 LOCATION MAP SCALE- 1'-10W FILTER FABRIC ON COMPACTED SUBGRADE jL NO. 3 (2") BROKEN OR CRUSHED STONE 6" MIN. THICKNESS NOTE: CONSTRUCTION ENTRANCE PAD SHALL BE INSTALLED AND MAINTAINED DURING OPERATIONS WHICH PROMOTE VEHICULAR TRACKING OF MUD mS1'R1+C El+ITRA! PQi N.T.S. ANCHOR FENCE POSTS WITH SLIGHT ANGLE UPSLOPE FASTEN FILTER FABRIC FENCE TO METAL POST 36" GRADE EXTEND FILTER FABRICr--- FENCE 6' INTO SOIL 18w (MIN.) tulANDCURLTOWARD SLOPE F E= N.T.S. e FILE COPY