Loading...
HomeMy WebLinkAboutSite Plans WENTWORTH CIVIL ENGINEERS LLC177 WEST TOWN ST.LEBANON, CT 06249WTEL. (860) 642-7255FAX (860) 642-4794web: wentworthcivil.com6&$/(  “SITE 1 inch = ft.( IN FEET ) WENTWORTH CIVIL ENGINEERS LLC TEL. (860) 642-7255 FAX (860) 642-4794 web: wentworthcivil.com 177 WEST TOWN ST. LEBANON, CT 06249W6060060120 1 inch = ft.( IN FEET ) WENTWORTH CIVIL ENGINEERS LLC TEL. (860) 642-7255 FAX (860) 642-4794 web: wentworthcivil.com 177 WEST TOWN ST. LEBANON, CT 06249W404004080 1 inch = ft.( IN FEET ) WENTWORTH CIVIL ENGINEERS LLC TEL. (860) 642-7255 FAX (860) 642-4794 web: wentworthcivil.com 177 WEST TOWN ST. LEBANON, CT 06249W404004080 WENTWORTH CIVIL ENGINEERS LLC TEL. (860) 642-7255 FAX (860) 642-4794 web: wentworthcivil.com 177 WEST TOWN ST. LEBANON, CT 06249W WENTWORTH CIVIL ENGINEERS LLC TEL. (860) 642-7255 FAX (860) 642-4794 web: wentworthcivil.com 177 WEST TOWN ST. LEBANON, CT 06249W WENTWORTH CIVIL ENGINEERS LLC TEL. (860) 642-7255 FAX (860) 642-4794 web: wentworthcivil.com 177 WEST TOWN ST. LEBANON, CT 06249W 1 inch = ft.( IN FEET ) WENTWORTH CIVIL ENGINEERS LLC TEL. (860) 642-7255 FAX (860) 642-4794 web: wentworthcivil.com 177 WEST TOWN ST. LEBANON, CT 06249W404004080 WENTWORTH CIVIL ENGINEERS LLC TEL. (860) 642-7255 FAX (860) 642-4794 web: wentworthcivil.com 177 WEST TOWN ST. LEBANON, CT 06249W SITE NARRATIVE AND LAND USE INFORMATION:SITE IS OWNED BY LINDO CONSTRUCTION, LLCSITE IS CURRENTLY VACANT LAND. SITE IS PROPOSED TO BE DEVELOPED INTOMULTIFAMILY APARTMENT BUILDINGS.PROPOSED CONSTRUCTION ACTIVITIES INVOLVE STRIPPING TOPSOIL, STUMPING &GRUBBING VEGETATION, FILLING, INSTALLING DRAINAGE SYSTEMS, SANITARYSEWER, PUBLIC WATER & UTILITIES, DRIVEWAYS, PARKING, SIDEWALKS ANDBUILDING CONSTRUCTION.INLAND WETLANDS PERMIT REQUIRED FROM THE TOWN OF MONTVILLE INLANDWETLANDS & WATERCOURSES COMMISSION FOR WORK REQUIRED WITHIN THE 50FOOT UPLAND REVIEW AREA. THERE IS NO ACTIVITY PROPOSED WITHIN ANYWETLANDS OR WATERCOURSES.1.The Applicant shall clear the area for the phase 1 construction of the Maple View Apartments. No grubbing shall occur until subsequent to the installation and inspection of erosion andsediment control measures. Any marketable timber shall be removed from the Property.2.The Applicant shall install silt fence down gradient of the area of all construction activities as depicted on the Erosion Control Plan. The Applicant may use wood chip berms in lieu ofsilt fence as an acceptable methodology for sediment and erosion control. Silt fence installation, if utilized, shall be effected in accordance with the ³3ODFHPHQW and Construction of a6\QWKHWLF)LOWHU%DUULHU´GHWDLODVGHSLFWHGRQ6KHHWRIWKHSURMHFWVLWHSODQ3.The Applicant shall install the anti-tracking apron at the construction interface of the access road to the Property with Maple Avenue in accordance with the ³&RQVWUXFWLRQ Entrance'HWDLO´DVGHSLFWHGRQ6KHHWRIWKHSURMHFWSODQV4.The Applicant shall excavate and form the phase 1 temporary sedimentation traps as depicted on the Erosion Control Plan.5.Upon completion of installation of erosion and sediment control measures, the Applicant shall contact the Montville Wetlands Enforcement Officer and the Montville ZoningEnforcement Officer to perform an inspection of the installation of erosion and sediment control measures. In no event shall mass soil disturbance and/or grubbing occur in the firstphase of the project until such time as the installation of erosion and sediment control measures has been approved by the Montville Wetlands Enforcement Officer and the MontvilleZoning Enforcement Officer.6.Surface soil shall be stripped in the phase one construction area and stockpiled in a surface soil stockpile area outside the limits of any upland review area adjacent to any inland wetlandor watercourse on the project site. Surface soil stockpiles shall have a slope not exceeding 4:1, and shall be stabilized by seeding with a perennial ryegrass mix and mulch. The perennialryegrass mix shall be applied at a rate of 40 pounds per acre. Mulch shall be applied at the rate of 80 pounds per 1,000 square feet, and shall be spread by hand or with a mulch blower.Silt fence or staked hay bales shall be installed along the down gradient periphery of each surface soil stockpile location.7.Excavation for the installation of the water quality forebay and stormwater detention basin shall be effected at the location delineated on the Erosion Control Plan. Excavated materialsshall be retained for use as fill in fill areas on the project site as delineated on the project plans. The water quality/detention/infiltration basin shall be excavated and shaped to thecontours and at the depths depicted on the project site development plan. Culvert trenches shall be excavated in order to effect the interconnection of the outlet structure within thedetention basin to the catch basin system in Maple Avenue.8.8SRQFRPSOHWLRQRIWKHH[FDYDWLRQRIWKHFXOYHUWWUHQFKHVEHGGLQJPDWHULDOQRWOHVVWKDQ´VKDOOEHLQVWDOOHGDQGFRPSDFWHGLQHDFKWUHQFKEHG9.The outlet structure shall be installed in the detention/infiltration basin and interconnected to the stormwater system in Maple Avenue as depicted on the Overall Layout Plan.10.Upon placement of the outlet culvert, bedding, not less than ´ in thickness, shall be installed over the top of the culvert pipe installation and compacted in place. Thereafter, the culverttrenches shall be backfilled with stored surface soil.11.The filter berm shall be installed separating the water quality forebay from the detention/infiltration basin in accordance with the ³'HWHQWLRQ Basin Forechamber Filter Berm'HWDLO´GHSLFWHGRQ6KHHWRIWKHSURMHFWSODQV12.The water quality-detention basin embankments shall be constructed of silty sand and/or clay material.13.The detention basin emergency spillway shall be formed and installed in accordance with the ³'HWHQWLRQ Basin Emergency Spillway 6HFWLRQ´ detail depicted on Sheet 11 of the projectplans.14.7KHVWRUPZDWHUTXDOLW\IRUHED\VKDOOEHORDPHGZLWKQRWOHVVWKDQ´RIVXUIDFHVRLOFRQWDLQLQJQRWOHVVWKDQRUJDQLFFRQWHQW15.7KHVWRUPZDWHUGHWHQWLRQEDVLQVKDOOEHORDPHGZLWKQRWOHVVWKDQ´RIVXUIDFHVRLOFRQWDLQLQJQRWOHVVWKDQRUJDQLFFRQWHQW16.The water quality forebay and detention basin shall be planted by installing the New England Erosion Control/Restoration Mix or equal. The New England Erosion Control/RestorationMix contains a selection of native grasses and wild flowers designed to colonize generally moist, recently disturbed sites where quick growth of vegetation is desired to stabilize the soilsurface. This mix is particularly appropriate for water quality/detention basins which do not normally hold standing water. The plants in this mix can tolerate infrequent inundation butnot constant flooding. The New England Erosion Control/Restoration Mix contains the following species: Switchgrass, Virginia Wild Rye, Creeping Red Fescue, Fox Sedge, CreepingBent Grass, Silky Wild Rye, Nodding Bur-marigold, Soft Rush, Grass-Leaved Goldenrod, Sensitive Fern, Jo-Pye Weed, Boneset, Flat-Top Aster, New York Aster and Blue Vervain.The seed mix shall be applied at a rate of 1 pound per 1,245 square feet of disturbed area.Disturbed areas on the water quality/detention basin berm and exterior thereto which are not anticipated to contain the hydrology required to support the New England ErosionControl/Restoration Mix shall be prepared by spreading ground limestone equivalent to 50% calcium plus magnesium oxide applied at a rate of 50 pounds per 1,000 square feet.Fertilizer (10-10-10) is to be applied at a rate of 7.5 pounds per 1,000 square feet. Following the initial application of lime and fertilizer, there are to be no periodic applications of limeand fertilizer. Disturbed areas will be seeded with a seeding mixture of Kentucky Bluegrass applied at a rate of 20 pounds per acre, Creeping Red Fescue applied at a rate of 20 poundsper acre and Perennial Ryegrass applied at a rate of 5 pounds per acre for a total application of 45 pounds per acre. A hydroseed mix containing comparable cultivars shall be anacceptable substitute. In the event that a hydroseed mix is not utilized, after seeding, the areas seeded shall be stabilized with hay mulch immediately applied at a rate of 70 pounds per1,000 square feet, and anchored by tracking. Seeding shall only occur between April 15 and June 15 and August 15 to October 1.17.As future areas of the project site are cleared and grubbed, the Applicant shall install, in the downgradient locations as delineated on the Erosion Control Plan, temporary sediment trapsin a size sufficient to accommodate 134 cubic yards of sediment for each acre of disturbed area draining to the temporary sediment trap.18.Upon completion of the installation and stabilization of the water quality/stormwater detention basin, construction shall progress sequentially in the first phase of project development inaccordance with the site development plan.19.All utility installations, including stormwater, the potable water distribution system and sanitary sewer facilities shall be installed in accordance with the design plans utilizing thetrenching, compaction and cover requirements as hereinbefore set forth.20.As the stormwater drainage system is being sequentially completed, the Applicant shall install sediment control devices in each installed catch basin.21.Areas for road and parking construction and building construction in the first phase of the project shall be ³ER[HGRXW´ and/or excavated, as the case may be, in accordance with thespecifications, and at the elevations, depicted on the project site development plan.22.Excavated material derived from site development shall either be utilized as structural fill in fill areas in the first phase of the project or stored in soil stockpiles. Any stockpiled earthproduct material shall be stabilized and protected by the installation of erosion control devices in accordance with the requirement hereinbefore set forth in this Construction SequencingNarrative.23.Each road location shall be boxed out and trenches excavated for the installation of all utilities, including stormwater drainage.24.8SRQWKHFRPSOHWLRQRIFXOYHUWLQJQRWOHVVWKDQ´RIFOHDQEHGGLQJPDWHULDOVKDOOEHLQVWDOOHGLQHDFKXWLOLW\WUHQFK25.Subsequent to the installation of bedding, utilities, including stormwater drainage pipes, shall be installed as delineated on the utilities plan incorporated into the site development plan.26.Once utilities have been installed, each utility trench shall be backfilled with clean bedding material compacted to a depth of not less than ´ over each utility installation. Areas to bepaved will be prepared by installing a compacted gravel subgrade base, overlaid with ´ of processed gravel (compacted) and thereafter by the installation of ´ of compacted Class 2bituminous concrete placed in ´ lifts in accordance with the ³%LWXPLQRXV Concrete Pavement & &XUELQJ´ detail delineated on Sheet 11 of the project site development plan.Bituminous concrete curbing shall be installed in accordance with that detail.27.Buildings in the first phase of the project shall be constructed in accordance with the architectural plans for the development of the same.28.8SRQFRPSOHWLRQRIFRQVWUXFWLRQLQWKHILUVWSKDVHRIWKHSURMHFWGLVWXUEHGDUHDVVKDOOEHVWDELOL]HGE\VSUHDGLQJVWRFNSLOHGVXUIDFHVRLORYHUWKHVHDUHDVDWDWKLFNQHVVRIQRWOHVVWKDQ´Areas to be seeded will be prepared by spreading ground limestone equivalent to 50% calcium plus magnesium oxide applied at a rate of 50 pounds per 1,000 square feet. Fertilizer(10-10-10) is to be applied at a rate of 7.5 pounds per 1,000 square feet. Following the initial application of lime and fertilizer, there are to be no periodic applications of lime andfertilizer.29.Disturbed areas will be seeded with a seeding mix of Kentucky Bluegrass applied at a rate of 20 pounds per acre, Creeping Red Fescue applied at a rate of 20 pounds per acre andperennial Ryegrass applied at a rate of 5 pounds per acre for a total application of 45 pounds per acre. A hydroseed mix utilizing comparable cultivars shall be a suitable substitute. Inthe event that a hydroseed mix is not utilized, after seeding, the areas seeded shall be stabilized with hay mulch immediately applied at a rate of 70 pounds per 1,000 square feet, andanchored by tracking. Seeding shall only occur between April 15 and June 15 and August 15 to October 1.30.Once all disturbed areas have been thoroughly stabilized, erosion and sediment control measures shall be removed.31.As the Applicant nears completion of construction of improvements in the first phase of the Maple View Apartments development, the Applicant shall commence construction of thesecond phase of the project.32.As each sequential phase of the Maple View Apartments development is constructed, the Applicant shall install, maintain and utilize the erosion control measures and structuresdepicted on the Erosion Control Plan which shall be installed, administered and utilized in accordance with the procedures set forth in the General Procedures section of this Narrativeand, as applicable, the construction sequencing requirements contained in the Construction Sequencing section of this Narrative.TEST PIT DATA90 MAPLE AVE.MONTVILLE, CT(PERFORMED BY WESLEY J. WENTWORTH, PE & SOIL SCIENTIST)DATE : 11-14-20TP 1010 - 8" TOPSOIL & LEAF LITTER8 - 24" YELLOWISH GREY VERY FINE SANDY LOAM24-44" GREYISH BROWN LOAMY FINE SAND (BRIGHT MOTTLES @ 28")44-80" ORANGE BROWN SAND & GRAVEL W/ COBBLES ANDBOULDERS - VERY COMPACT W/ BRIGHT CONCRETIONSGROUNDWATER: NONE OBSERVEDLEDGE: NONE OBSERVEDMOTTLING: 28" (READERS OPINION NOT INDICATIVE OF HIGHSEASONAL GROUNDWATER)PERMEABILITY @ DEPTH OF 60" = 1.12 FEET/DAY(NOTE: LOOSE SAMPLE RECOMPACTED FOR PERMEABILITY TESTING)TP 1020 - 7" TOPSOIL & LEAF LITTER7 -32" YELLOWISH TAN VERY FINE SANDY LOAM32-66" TAN GREY VERY FINE SAND66-92" GREYISH BROWN SAND & GRAVEL - VERY COMPACTGROUNDWATER: NONE OBSERVEDLEDGE: NONE OBSERVEDMOTTLING: NONE OBSERVEDPERMEABILITY @ DEPTH OF 50" = 0.88 FEET / DAY(NOTE: LOOSE SAMPLE RECOMPACTED FOR PERMEABILITY TESTING) WENTWORTH CIVIL ENGINEERS LLC TEL. (860) 642-7255 FAX (860) 642-4794 web: wentworthcivil.com 177 WEST TOWN ST. LEBANON, CT 06249W1/2' ASPHALTEXPANSIONJOINT MATERIALEVERY 30'AA5/8" STEELDOWELSCONTROL JOINTEVERY 15'15'5'5'5'5'12"TYP.TOOLED JOINT DEPTH 3/8"(TYP)PLAN1/4"GROOVE1"RADIUS6" CURB REVEALSLOPE - 1/4"/FT4' MIN.8" MIN.CLASS 'F' CONC.(4000 P.S.I.)5" PROCESSED AGGREGATE BASESECTION A-ABIT. CONCRETE FOR SECTIONTHICKNESS, SEE TYP. SECTIOIN2"6"6"(NOT TO SCALE)(6&8' PROPOSED)GRADEFINISH(NOT TO SCALE)D.O.T. SIGN#31-0628D.O.T. SIGN#31-0629HANDICAP PARKINGSIGNS SHALL BELOCATED ON THEBUILDING WHEN THEPARKING SPACE ISAGAINST THEBUILDING.HANDICAP PARKINGSIGNS SHALL CONFORMTO CURRENT STATEAND REGULATIONS.AND LOCAL CODESHANDICAPSIGN WITHBOLLARD(TYP)HANDICAP VANACCESSSTALL(TYP)HANDICAP ACCESSSTALL(TYP)(NOT TO SCALE)1-3/8" PERF.GALVENIZEDSIGN POSTSTEEL U-CHANNEL WENTWORTH CIVIL ENGINEERS LLC TEL. (860) 642-7255 FAX (860) 642-4794 web: wentworthcivil.com 177 WEST TOWN ST. LEBANON, CT 06249W