Loading...
HomeMy WebLinkAboutSite Plan30 PLACEMENT AND CONSTRUCTION OF SYNTHETIC FILTER BARRIER POSTS LE) STS AND 2.) STAPLE THE oATE A 6'X 6" _ WIRE MESH ANGLE 10UPSLOPEFORH, SET POSTS FENCING FENCING TO STABiLITYAND'SLOPE. END POST. SELF CLEANING. 2" MiN. DEPTH 3.) ATTACH FiLTER FABRIC TO THE WIRE FENCING 4.) BACKFILL THE FILTER FABRIC ( j TRENCH AND AND EXTEND IT TO COMPACT THE THE TRENCH. EXCAVATED SOIL. BACKFILL BOTTOM OF DRAINAGEWAY A B B A 0 U - ELEVATION POINTS "A" SHOULD BE HIGHER THAN POINTS "B" U.S. DEPARTMENT OF AGRICULTURE, SOILS CONSERVATION SERVICE, STORRS, CONNECTICUT ��.�.�ANis R° X65 A � a3813� v N 15 ar r seiBAC�..- 0 .- '''' • �, ... 0• 54' `N.,,�', .•'' � w. MS ROAD ®' / / P�� `� 5.Iy�LIA / — —,l; - - 136'49 !d OP- - •'' /- - •,• 00 dop AREA e`�° 128j285 SQ. FT. / .••� \ �e 2.945 ACRES INLAND WETLAND \ ••� �P AcK 420x5 Of 000 ov i• �04/ / / �\ s 1 • •' MON. 5N., / / / •/ �, i n,i�' 420x4 �� \ -_ FD. •, / •1Y' .� 44.00 #41 / 424 C.B. T.F,@ G.L. 423.12' INSTALL ENT. PAD of 10 e30 y� /: , i • / / 426 11 �6. .,./ •. r'' ! / / _ - 430 ' p , _._, .... ®-- INLAND WETLAND ,.�• ' / /, '- �;; ••. , 431x5 t lf . \ ® o /�• ` ` '••'• 10 i ¢ 1] / ! a ,.•� 1. _ •evil / ' `/ •' --_ - \ r i O �' '+• �'_' \ 430 _ �11N - _ _ - - - I---- •• ,+• INLAND WETLAND i -- - 4 AFF-¢ I t 0 0 / _- 3 3? .�••• •••� i 432 -''- h --P. WELL t 435x0 1r ®... r... ; +,��• ,•; �, i 1 MIN. WELL RAD. 14�4 t Off, •. • • •�` • '`W� _SE ' ---- ----- J' •`• 8T4.T2, / • \ 435 / r 1 I' -38 g.------ , 4r, NOTE: NO RECORDS OF THE SEWER STUB LOCATIONS ARE AVAILABLE FROM THE TOU,VN OF MONTVILLE (WPCA). CONTRACTOR SHALL VERIFY FIELD LOCATION OF STUB PRIOR TO INSTALLING ANY PART OF THE HOUSE SEWER LiNE. CONNECTION WILL BE GRAVITY WITH CLEAN OUT @ FOUNDATION. NOTE: CONTACT TOWN OF MONTVILLE WPCA FOR SEWER CONNECTION PERMIT AND TIE IN SPEC. S (860-848-3030 EXT. 5) SURVEY NOTES: 1.) LOT BOUNDARY DATA TAKEN FROM A MAP ENTITLED "MONTVILLE ESTATES CLUSTER SUBDIVISION, MONTVILLE, CONNECTICUT, SUBDIVISION PLAN, SHEET NO. 2, PREPARED FOR MONTVILLE LAND DEVELOPMENT, LLC, SCALE: 1 "=100; DATE. 3/30/07 LAST REV. 6/16/07, CLA ENGINEERS, INC. 317 MAIN STREET, NORWICH, CONN., ROBERT L. MULLEN L. S. NO. 12331.It 2.) PROPOSED CONSTRUCTION AREAS FROM FiELD TOPO CLASS T-2. GRAPHIC SCALE IN FEET 30 60 90 120 �"' , • e / 437x1 / ( SAN. MANHOLE ` ` ® T.F.=428.23 SEQUENCE OF ACTIVITY - HOUSE LOT DEVELOPMENT 1. LIMIT OF DISTURBANCE. Upon approval of individual site plan development, the limits of development shall be established in the field : \ - / ^h / C.B. - for each proposed structure. Disturbance limits shall be AS -SHOWN and shall be / �,� ^ ' T.F.@ G.L. R184ccl • — bounded by staked haybales, slit fence or wood chips. : e �` t = 429.20' coli8r 2. TREES CLEARED. Trees shall be cleared and cut to length and stacked or removed from the site. �, �- -. s �Z""► s ` �,Ir ' 3. EROSION CONTROLS. Disturbed area shall be bounded by staked haybal�s or silte fence. All erosion controls, including silt fence and , 440 antitrad<ingpad, shall be installed and inspected by the Land Use ,•� PlannerlZEO and Wetlands Agent PRIOR TO STUMPS BEING PULLED, '8 GRUBBING, OR EXCAVATION. The Pianner/ZEO and Wetlands Agent "' -' 30 S41x1 may modify the erosion control requirements based on field conditions so as to adequately control erosion and stltatton from the site. 4. DR1 IEWAYS. All driveway and driveway shoulders shall be stripped, gradedas shown on plan, and graveled All driveway shoulders shalt be stabilized immediately upon grading, either by diverting runoff, mulching, or seecing and mulching (depending on the season). 5. TOPSOIL. All topsoil shall be stripped and saved in an area as shown on the plan or as approved by the Planner and Wetlands Agent. Topsoil shall not be removed from the site except as in compliance with the ZoningRegulations. 6. CONSTRUCTION AND DISTURBED AREA. Excavation and construction shall commence following inspection and approval of erosion controls and construction of the driveway. The disturbed area shall be gradedso as to contain runoff within the lot to the greatest extent possible. 7. SiTES iN WINTER. When a site will be open during the winter months, rough grading and 4-6 inch mulching must occur prior to construction in order N minimize erosion and uncontrolled runoff during the winter months. 8. DRAINS. Foundation and curtain drains shall be installed as shown on the approved plan. ANY CHANGES TO THE LOCATION OF THE DRAINS OR THE ADDITION OF ANY DRAINS SHALL BE APPROVED BY THE PLANNER AND WETLANDS AGENT PRiOR TO INSTALLATION. 9. COWPLETE SiTE WORK. Finish grading shall occur as soon as possible on all lots where there is potential for erosion and for degradation of wetlands and watercourses. Lots shall be finish graded, seeded with perennial grasses suitable for the respective amount of sun or shade and mulched prior to Certificate of Zoning Compliance, 10. FINAL STABILIZATION. EROSION CONTROLS SHALL BE MAINTAINED ON THE LOT AS LONG AS THEY ARE NEEDED TO CONTROL EROSION AND SEDIMENTATION. - -532- ` — — - EXISTING CONTOUR EXISTING CONTOUR an LOT LINE STONEWALL ® s .........� s --.eeOeSiL T FENCE _—..._—__,—®—.__._ BUILDING LINE BIT. LIP CURBING FOOTING DRAIN PROPOSED 528 CONTOUR CLEARING LIMIT 100 ; 1d , ,° +a4 °a�4 �°�444a4 / 4' q '444,144 a 5 44 �a° a ��� INSTALL 441 ry / ENT. PAD R- 120 ZONE THIS SURVEY MAP HAS BEEN PREPARED IN ACCORDANCE WITH SECTIONS 20-300b-1 THRU 20-300b-20 OF THE REGULATIONS OF STATE AGENCIES "MINIMUM STANDARDS FOR SURVEYS AND MAPS IN THE STATE OF CONN." AS ENDORSED BY THE CONN. ASSOC. OF LAND SURVEYORS, INC. ITIS A IMPROVEMENT LOCATION SURVEY BASED ON A DEPENDENT RESURVEY CONFORMING TO CLASS A-2 STANDARDS. TO THE BEST OF MY KNOWLEDGE AND BELIEF THIS MAP IS SUBSTANTIALLY RR CT S NOTED HEREON Av rtV JOEL A . F UL LER CT. l.S. N0. 14197 SITE IMPROVEMENT PLAN PROPOSED #5 DAVID DRIVE MONTVILLE, CONNECTICUT PREPARED FOR MARINO CONSTRUCTION, LLC SCALE: 1 "=30'- DATE" APRiL 20, 2020