HomeMy WebLinkAboutIMG_258812:37
+1 (860) 729-9941
Tiffany here is the
GIS showing the pro-
posed wall in red and
silt fence location in
yellow.
The same backhoe/
excavator use at 55B
will be used for
trenching and back-
filling.
Material dug out for
the trench will be
placed close to the
trench on the silt
fence side. Once the
wall is finished that
(trennh) material will
10 0> iMessage