Loading...
HomeMy WebLinkAboutIMG_258812:37 +1 (860) 729-9941 Tiffany here is the GIS showing the pro- posed wall in red and silt fence location in yellow. The same backhoe/ excavator use at 55B will be used for trenching and back- filling. Material dug out for the trench will be placed close to the trench on the silt fence side. Once the wall is finished that (trennh) material will 10 0> iMessage