HomeMy WebLinkAboutSite Plan4-
LEGEND
PROPERTY LINE
i
480 EXIST. CONTOURS
00
PROPOSED BUILDING
EDGE OF ROAD
EDGE OF DRIVEWAY
WETLANDS
LEGEND
PROPERTY LINE
SETBACK LINE
480 EXIST. CONTOURS
PROPOSED BUILDING
EDGE OF ROAD
EDGE OF DRIVEWAY
WETLANDS
WETLAND BUFFER
PRIMARY SEPTIC SYSTEM
RESERVE SEPTIC SYSTEM
STONEWALL
468 PROPOSED CONTOUR LINE
IS SILT FENCE
1 3/1/17 UNCAS HEALTH DISTRICT R ;i 17 Main ZStreet Norwich, C;'1'3
DATE REVISION 8
C;'1' 0660Ifff
No. lw k 60) 886-1966 Fax (860) 886-9165
Project No.
GAGNON- VENUTI, CLA-5870
NN Proj. Engineer
E.M.B
DEERRIDGE L0"T 2DsLte: ef\
MAXyy2004TVILLE, 'ONNECTICUTM0 Sheet No.
Projectro.
Prco.
l
m
SEPTIC SYSTEM LAYOUT
SEPTIC SYSTEM DESIGN
SEPTIC SYSTEM DESIGN LOT 1
PRIMARY SYSTEM:
PERCOLATION RATE: 1 TO 10 ,MIN./INCH
3 BEDROOM HOUSE
EFFECTIVE LEACHING AREA REQUIRED = 495 SF
USE A 12" DEEP x 48" WIDE TRENCH
EFFECTIVE LEACHING AREA OF TRENCH = 3.0 SF/LF
LENGTH OF TRENCH REQUIRED = (495 SF)/(3.0 SF/LF) = 165 LF
DEPTH TO RESTRICTIVE LAYER = 57" SLOPE 2%
NF=28 FF= 1.5 PF= 1
MLSS = 42 LF
USE THREE ROWS OF 55' AT 9' 0. C.
LEACHING AREA PROVIDED = 495 SF
RESERVE SYSTEM:
USE SAME DESIGN AS PRIMARY SYSTEM
PREPARE AREA OF PROPOSED SYSTEM
AS FOLLOWS
1. REMOVE AND STOCKPILE TOPSOIL
2. PLACE BANK RUN GRAVEL (LESS THAN 5% FINES) PLACED IN
6" LIFTS AND COMPACTED TO 95% DENSITY.
3. EXCAVATE 4' WIDE TRENCHES AND PREPARE SURFACE.
4. FILL TRENCHES WITH 1" WASHED STONE TO HEIGHT OF PIPE INVERTS
PLACE PIPE IN TRENCH, AND FILL TO 2" OVER TOP OF PIPE.
5. CAP ENDS OF PIPES.
6. PLACE A 4' WIDE STRIP. OF NON -WOVEN FILTER FABRIC ON TOP OF
THE ENTIRE LENGTH OF THE SYSTEM AND BACKFILL WITH NATIVE MATERIAL.
7. REPLACE TOPSOIL, SEED &MULCH.
FEST HOLE DATA:
TEST HOLES RECORDED BY AMANDA ACHMATOW do ROBERT RUSSO
OF CLA ENGINEERS ON NOVEMBER 19, 2002
TH #1 E
103" TOTAL DEPTH
0"-22" YELLOW BROWN SUBSOIL
22" 103" GRAY, YELLOW GRAY & PALE GRAY SAND
TOPSOIL ABSENT
NO BEDROCK
NO WATER
NO MOTTLING
TH 1 H
108" TOTAL DEPTH
0"--8" YELLOW BROWN SANDY LOAM TOPSOIL
8"-108" YELLOW BROWN, PALE BROWN, GRAY SAND
NO BEDROCK
NO MATER
82" MOTTLING
TH #11
112" TOTAL DEPTH
0"--3" DARK BROWN SANDY LOAM TOPSOIL
3"--18" YELLOW BROWN SAND SUBSOIL
18"-112" GRAY & LIGHT BROWN SAND
NO BEDROCK
108" WATER
90" MOTTLING
TH #IJ
130" TOTAL DEPTH
0"--130" GRAY, PALE BROWN, YELLOW BROWN SAND
NO.BEDROCK
124" WATER
FILTER FABRIC 10' MAXIMUM POST
WIRE MESH
FENCING
r
COMPACTED BACKFILL AFTER
PLACEMENT OF SILT FENCE
SILT FENCE DETAIL
NOT TO SCALE
GENERALNOTES
1. TOPOGRAPHIC INFORMATION ON THIS PLAN PROVIDED 8Y CLA ENGINEERS, INC.
2. PROPOSED HOUSE AND SEPTIC SYSTEM TO BE STAKED IN THE FIELD BY
A LAND SURVEYOR LICENSED IN THE STATE OF CONNECTICUT.
3. ALL WORK AND MATERIAL (SEPTIC TANK, DISTRIBUTION BOX, PIPE, SELECT FILL))
SHALL CONFORM TO THE CONNECTICUT PUBLIC HEALTH CODE
REGULATIONS AND STANDARDS FOR SUBSURFACE SEWAGE DISPOSAL
SYSTEM.
4. SEWER LINE FROM FOUNDATION WALL TO SEPTIC SHALL BE 4"
SCHEDULE 40 PVC - ASTM D 1785 AND JOINTS PER HEALTH DEPT. CODE.
S. TRENCHES SHALL BE SET LEVEL FOR ENTIRE LENGTH AND HAVE A
CENTER TO CENTER SPACING OF 9 FEET.
6. PIPE FROM SEPTIC TANK TO DISTRIBUTION LINES SHALL BE 4" SOLID
PVC CONFORMING TO ASTMD-3034 AND SDR -35.
7. FOUNDATION DRAIN PIPE FROM HOUSE TO OUTLET SHALL CONFORM
TO TABLE 2-C OF THE CONNECTICUT PUBLIC HEALTH CODE REGULATIONS
AND STANDARDS FOR .INSTALLATION WITHIN 25 FEET OF A SEWAGE DISPOSAL
SYSTEM.
8. THERE ARE PRESENTLY NO KNOWN WATER WELLS WITHIN 75' OF THE
PROPOSED SEPTIC SYSTEM.
9. A VERTICAL BENCHMARK SHALL BE PROVIDED WITHIN 50 FEET OF THE
PROPOSED HOUSE LOCATION PRIOR TO THE START OF CONSTRUCTION.
10. CLEAR AND GRUB THE AREA WHERE THE SEPTIC SYSTEM AND HOUSE ARE
TO BE CONSTRUCTED. ALL TOPSOIL IS TO BE STRIPPED AND STOCKPILED
FOR FUTURE USE.
11, ALL FILL MATERIAL SHALL BE CLEAN EARTH FREE OF STUMPS, ORGANICS,
CONSTRUCTION DEBRIS AND TOPSOIL.
12. TOPSOIL SHALL BE RE-APPLIED OVER ALL FILL AREAS AND ALL DISTURBED
AREAS TO PROVIDE A MINIMUN DEPTH OF FOUR INCHES.
13. ALL EXISTING UTILITIES TO BE ACCURATELY LOCATED PRIOR TO CONSTRUCTION.
14. IF BLASTING IS REQUIRED APRE-BLAST SURVEY WILL BE REQUIRED.
CALL BEFORE YOU DIG: 1-800-922-4455..
PERC TEST DATA
HOLE DEPTH 27"
PRESOAK: 9:20 AM
9:40 13"
9:42 15.75"
9:44 17.5"
9:46 18.5"
9:48 19"
9:50 20.5"
9:52 20.5"
9:54 21 to
9:56 21.5"
9:58 22"
USE LAST 18 MINUTES
FROM 9:40 TO 9:58 - 9"DROP
1 8MIN 9t, = 2 MIN/IN "
PERC. RATE = 1 TO 10 MIN/IN
6" SOIL COVER NON -WOVEN FILTER FABRIC
MIN.) OVER STONE
4" PVC PERFORATED PLASTIC
FINISH DISTRIBUTION PIPE (ASTM D 3033)
GRADE
ONE INCH CLEAN BROKEN
2" STONE OR SCREENED GRAVEL
12" Cf INVERT
R
4: WIDTH
FILTER BARRIER INSTALLATION & MAINTENANCE
1. DIG A 6" TRENCH ON THE UPHILL SIDE OF THE BARRIER LOCATION.
2. POSITION THE POSTS ON THE DOWNHILL SIDE OF THE BARRIER AND DRIVE THE
POST 1.5 FEET INTO THE GROUND.
3. Wp T$y{1l OM 6" OF THE FABRIC IN THE TRENCH TO PREVENT UNDERMINING
4. INSPECT AND REPAIR BARRIER AFTER HEAVY RAINFALL.
5. SEDIMENT DEPOSITS ARE TO BE REMOVED WHEN THEY REACH A HEIGHT OFONE
FOOT BEHIND THE BARRIER AND ARE TO BE DEPOSITED IN AN AREA WHICH IS
NOT REGULATED BY THE INLAND WETLANDS COMMISSION.
6. INSPECTIONS AND NECESSARY REPAIRS WILL BE MADE TWICE WEEKLY.
TEMPORARY - VEGETATIVE COVER
A TEMPORARY SEEDING OF RYE GRASS WILL BE COMPLETED WITHIN 15 DAYS OF THE FORMATION
OF STOCKPILES. IF THE SOIL. IN THE STOCKPILES HAS BEEN COMPACTED BY CONSTRUCTION
OPERATIONS IT SHALL- BE LOOSENED TO A DEPTH OF 2 INCHES BEFORE THE FERTILIZER, LIME AND
SEED IS APPLIED. 10-10-10 FERTILIZER AT A RATE OF 7.5 POUNDS .PER 1000 S.F.
LIMESTONE ATA -RATE OF 90 LBS: PER 1000 S.F. SHALL BE USED. RYE GRASS APPLIED AT A
RATE OF 1 LB. PER 1000 S.F. SHALL PROVIDE THE TEMPORARY VEGETATIVE COVER. STRAW
FREE FROM WEEDS AND COARSE MATTER SHALL BE USED AT A RATE OF 70-90 LBS. PER 1000 S.F.
AS A TEMPORARY MULCH. APPLY MULCH AND DRIVE TRACKED EQUIPMENT UP AND DOWN SLOPE OVER
ENTIRE SURFACE SO CLEAT MARKS ARE PARALLEL TO THE CONTOURS.
PERMANENT VEGETATIVE- COVER
TOPSOIL WILL BE REPLACED ONCE THE EXCAVATION HAS BEEN COMPLETED AND THE SLOPES ARE
GRADED TOA SLOPE NO GREATER THAN 2.5 TO 1. PROVIDE SLOPE PROTECTION ON ALL CUT SLOPES.
TOPSOIL WILL BE SPREAD AT A MINIMUM COMPACTED DEPTH OF 4 INCHES. ONCE THE TOPSOIL HAS
BEEN SPREAD, ALL STONES TWO INCHES OR LARGER IN ANY DIMENSION WILL BE REMOVED AS WELL AS
DEBRIS, APPLY AGRICULTURAL GROUND LIMESTONE AT THE RATE OF TWO TONS PER ACRE OR 100 LBS.
PER 1000 S.F. -APPLY 10-10-10 FERTILIZER OR EQUIVALENT AT A RATE OF 300 LBS. PER .ACRE OR
7.5 LBS. PER S.F. WORK LIMESTONE INTO THE SOIL TO A DEPTH OF 4 INCHES. INSPECT SEEDBED
BEFORE SEEDING. IF TRAFFIC HAS, COMPACTED THE. SOIL, REfILI COMPACTED AREAS. APPLY THE
FOLLOWING GRASS SEED MIX:
qtr u nAl1 1 UKt
8S. ACRE. LBS./1000 S.F.
KENTUCKY BLUEGRASS 20 0.45
PEREI IQIAL '(fE 20 0.45
5 0.10
45 1.00
THE RECOMMENDED SEEDING DATES ARE:
APRIL 1 -JUNE 15 AND AUGUST 1 -SEPTEMBER 15
FOLLOWING SEEDING, FIRM SEED BED WITH A ROLLER. MULCH .WITH WEED FREE STRAW
IMMEDIATELY FOLLOWING SEEDING. IF A PERMANENT VEGETATIVE STAND CANNOT BE ESTABLISHED
2x2 5/8 16 GA.
WIRE MESHFF4" PVC ELBOW
NOT TO SCALE
NOT TO SCALE
4" TOPSOIL
IJCI O °
O o 0 00 0
o1 rQj° ° Qoo ° ° 0 0 0 O08000°'goC am,o°$alb o 000 0
4" CLEAN FILL
LOA CROSS- SECTION 1L
NOT TO SCALE
4 3/4"
18"DIA.
COVER
M!
INLET 8„ 18" 3 10"
BAFFLE MIN ' N
s
rn
co
4' --5 3/4" i
P
LIQUID
4= 3" WALLS LEVEL
t
C C)SS SECTION V1
10.00 GALLON SEPTIC TANK
NOT TO SCALE
INLET
i
OUTLET
OUT FILTER
DEVICE
317 Main Street Norwich, CT 06360
No. DATE REVISION (860) 886-1966 Fax (860) 866-9165
Project No.
iGili i- Viy iTI CLA--5870
GoSys
Proj. Engineer
al
E.M.BDEERRIDGEnate:
MONTVILLE, MAY 2004
Sheet No.
OETA LS