Loading...
HomeMy WebLinkAboutSite PlanPLACEMENT AND CONSTRUCTION OF SYNTHETIC FILTER BARRIER POSTS LDOWN STS AND ANGLE 10 o ATE A 6'?C 6" _ ! 2. j STAPLE RE MESH UPStOPE FOR H, SET POSTS FENCING I FENCING TO STABILiTYAND' SLOPE. END POST. SELF CLEANING. "UNEM2" MIN. "NowDEPTH 3.) ATTACH FILTER FABRIC 4.� BACKFILL THE TO THE WIRE FENCING FILTER FABRIC4.,A)NDEXTENDITTO I TRENCH AND COMPACT THE THE TRENCH, EXCAVATED SOIL. BACKFILL BOTTOM of DRAINAGEWAY A ELEVATION POINTS "A" SHOULD BE HIGHER THAN POINTS "B° U.S. DEPARTMENT OF AGRICULTURE, SOILS CONSERVATION SERVICE, STORRS, CONNECTICUT 10.89' Al 2"-31r COARSE AGGREGATE CONSTRUCTION ENTRANCE/EXIT SD 13-03 NOT TO SCALE !4$'O� ®,O1' f� < fOle .• V • •1 , •' i •' a ;: INLAND WETLAND •,.�' �0 .• S • \ e `� d 1 `I e • f �' •• V s • • a3 16 ••�/� / � . e•a/ \ /\ ; INLAND WETLAND • ate too / •1•`'' .. [��% / ®•''�'►. •..s11rs•e!•Ier•ee�•>••�` \ ••/••• i '_ • 7J,MIN, yYGL�-rk' i •-ft ••'�• a/�O / •'�•,• _•e,.0.•ess••1.� \ \ \ 1.1/ ; \ \ `. ' 434 •'' INLAND WETLAND /��� • •' A� s�4,2, e 1 .,�esesLTs•e..w1•s.r••sr.s/1.� \ � v�(AI,IJ op �11a• v •1• •� 11• s11•...•e 1• ` i� • \. \ \ % • \ e 5a -- 2.182 ACRES \ W.L. SE� .._. \ loll ZZC\ 69 `' %ft• �' ,.`' \ 598' \ � �•.. .• a''' /� ��� — — 69599,0%' -------------------- I I 75' MIN. WELL RAD. \ \ D7NGt7NF ` \ \ ` \ \ 251M(N 1 1 - -532- -- - EXISTING CONTOUR EXISTING CONTOUR 0191ML4 - STONEWALL ® s s SILT FENCE ___.—_—_.—._—__ BUILDING UNE BiT. LIP CURBING FOOTING DRAiN PROPOSED CONTOUR CLEARING LIMIT NOTE., NO RECORDS OF THE SEWER STUB LOCATIONS ARE AVAILABLE FROM THE TOWN OF MONTViLLE (WPCA). CONTRACTOR SHALL VERIFY FIELD LOCATION OF STUB PRIOR TO INSTALLING ANY PART OF THE HOUSE SEWER LINE. CONNECTION WILL BE GRAVITY WITH CLEAN OUT @ FOUNDATION. NOTE: CONTACT TOWN OF MONTVILLE WPCA FOR SEWER CONNECTION PERMIT AND TIE IN SPEC. S (360-848-3030 EXT. 5) SURVEY NOTES. 1.) LOT BOUNDARY DATA TAKEN FROM A MAP ENTITLED "MONTVILLE ESTATES CLUSTER SUBDIVISION, MONTVILLE, CONNECTICUT, SUBDIVISION PLAN, SHEET NO. 2, PREPARED FOR MONTVILLE LAND DEVELOPMENT, LLC, SCALE: 1 "=100, DATE: 3/30107 LAST REV. 6/18/07, CLA ENGINEERS, INC. 317 MAIN STREET, NORWICH, CONN., ROBERT L. MULLEN L. S. NO. 12331.ft 2.) PROPOSED CONSTRUCTION AREAS FROM FIELD TOPO CLASS T-2. 01 GRAPHIC SCALE IN FEET 30 60 90 120 SEQUENCE OF ACTIVITY -HOUSE LOT DEVELOPMENT 1. LiMIT OF DISTURBANCE. Upon approval of individual site plan development, the limits of development shall be established in the field for each proposed structure. Disturbance limits shall be AS -SHOWN and shall be bounded by staked haybales, silt fence or wood chips. 2. TREES CLEARED. Trees shall be cleared and cut to length and stacked or removed from the site. 3. EROSION CONTROLS. Disturbed area shall be bounded by staked haybales or silte fence. All erasion controls, including silt fence and antitrackingpad, shall be installed and inspected by the land Use Planner/ZEO and Wetlands Agent PRiOR TO STUMPS BEING PULLED, GRUBBING, OR EXCAVATION. The Planner2E0 and Wetlands Agent may modify the erosion control requirements based on field conditions so as to adequately control erosion and siltation from the site. 4. DRIVEWAYS. All driveway and driveway shoulders shall be stripped, graded as shown on plan, and graveled. All driveway shoulders shall be stabilized immediately upon grading, either by diverting runoff, mulching, or seeding and mulching (depending on the season). 5. TOPSOIL. All topsoil shall be stripped and saved in an area as shown on the plan or as approved by the Planner and Wetlands Agent. Topsoil shall not be removed from the site except as in compliance with the Zoning Regulations, 6. CONSTRUCTION AND DISTURBED AREA. Excavation and construction shall commence following inspection and approval of erosion controls and construction of the driveway. The disturbed area shat{ be graded so as to contain runoff within the lot to the greatest extent possible. 7. SITES IN WINTER. When a site will be open during the winter months, rough grading and 4-6 inch mulching must occur prior to construction in order to minimize erosion and uncontrolled runoff during the winter months. 8. DRAINS. Foundation and curtain drains shall be installed as shown on the approved plan. ANY CHANGES TO THE LOCATION OF THE DRAINS OR THE ADDITION OF ANY DRAINS SHALL BE APPROVED BY THE PLANNER AND WETLANDS AGENT PRIOR TO INSTALLATION. 9. COMPLETE SiTE WORK Finish grading shall occur as soon as possible on all lots where there is potential for erosion and for degradation of wetlands and watercourses. Lots shall be finish graded, seeded with perennial grasses suitable for the respective amount of sun or shade and mulched prior to Certificate of Zoning Compliance. 10. FINAL STABILIZATION. EROSION CONTROLS SHALL BE MAINTAINED ON THE LOT AS LONG AS THEY ARE NEEDED TO CONTROL EROSION AND SEDIMENTATION. 1446X8 P. WELL 3��ij�i7Jla THIS SURVEY MAP HAS BEEN PREPARED IN ACCORDANCE WiTH SECTIONS 20-300b-1 THRU 20-300b-20 OF THE REGULATIONS OF STATE AGENCIES "MINIMUM STANDARDS FOR SURVEYS AND MAPS iN THE STATE OF CONN." AS ENDORSED BY THE CONN. ASSOC. OF LAND SURVEYORS, INC. IT IS A IMPROVEMENT LOCATION SURVEY BASED ON A DEPENDENT RESURVEY CONFORMING TO CLASS A-2 STANDARDS. TO THE BEST OF MY KNOWLEDGE AND BELIEF THIS MAP IS SUBSTANTIALLY ORR CT S NOTED HEREON JOEL 9 FULLER CT. L.S. NO. 14197 SAN. MANHOLE T.F.=428.23' l / C. B. o T.F.@ G.L. 429.20' 1 I 1 I /1 c�ii cvl 1 � 1 I t 1 1 I $ / I , I 44 4 4 / 44 a $�� INSTALL Q°ab4 ry % ENT. PAD / , I / s% e/ Z 0 z z 0 0 C/) I / / SITE IMPROVEMENT PLAN / PROPOSED LOT 10 #11 DAVID DRIVE MONTVILLE, CONNECTICUT PREPARED FOR T A - SCALE. 1 "=30'- DATE" APRIL 20, 2020