Loading...
HomeMy WebLinkAboutSite Plan9 r 0 00 0 N 0 N N Ln W a 0 00 od N M 0 0 a) OrtA 0 0 -0 d- i U (0 5 APPROXIMATE WETUNDS UNE PER SUBDIVISION PUN ALL OTHER WETLANDS RWLAGGED BY ROBERT RUSSO`IN 2020 J ANTONIO IACONIELLO 50'—11PLAND, REVIEW' 218' N/F -�_ S G SYSTEMS LLC \ 214 21 Mill! 11111111111111 —�^ �i 2266 2� 1222 21g_ �. -��212 , �o 10C "I N, 00, °� b � TH 10A f e � � f 228 f '_ ....-�1.-,., B&W PAVIN¢ �NDSCAPIN{L • .. ....... N DANIEL JONES -\ ... _ low 'v t.. sp f •�:. :j• : 208:•y'3::�"'''~;#.. --._yam.'• •�:!•`•'•':; - ,�_ 1 16 -41 - .41 'tli � +� 208 \ ' 50' AREA 2 \20 �.` 208 . C208 / �� ::� -/ '� 11 LJ 411il .:a \ 206 / ��--"0 o 204 ` \ / ".•:�.. �»», •� ' ... .. 6 » 10, U 204 :. 50 .,.►�� ,''�� / / —�� '�► 200- + •.+-' —� 210 Ono '.. ^•. 202 2� _ a ' '1 o ti I �' ; ... • . ...:�' e._. . � � � .......:, \ ° v 201- • . — .� : _ •,� �A�TO RSG E�--- ,as ♦ — ��. 314 BUTLERTOWN ROAD " " = , : ' •�' ::::.:�. ; ; , ; v, E LOT 32-7 .' • • NG SWAI'E 198 � l • :. �... � � ... 2a2 200 ' 8.69 ACRES • • '�. �� • ;� ,a ti� ' ... '96 Ift �� :1 vopp .., . ({ ..... .. � .. T y mill. ..... ... ... VV 194 ' ...,� . , . 1�� y - /�'. • V 00 .. .... 1 ago now O� 312 BUTLERTOWN ROAD 192 - ' '� 194 _r-- QQ� LOT 32 8 92 "'?, r:. 5.28"ES(' ..�.% \ - _ ,� < .<«<«<<<`'% <<<< < �„ 192 ..-,�-- EXISTING KPILE AREA �, /" + 8 ..,....►� . �f :.� 192 EXISTING" BASIN 188 � - ,\,'� � 190Ono � 188 •�::: ,� REN- 0EfROSKY _186 184 JA lot 184 50 UPLAND REVIEW AREA / NOTES: 1. PROPOSED USE: STORAGE OF UTILITY EQUIPMENT AND MATERIALS / ♦ ^^ 2. SURFACE TREATMENT TO BE ASPHALT MILLINGS.. 3. THE PROPERTY OWNER IS STEVEN LOGAN AND B AND W PAVING AND LANDSCAPING. APPLICANT IS B AND W PAVING AND LANDSCAPING O• J 1�J 4. THERE WILL NOT BE ANY TANKS ON THE SITE, NO FUELING, OR HAZARDOUS WASTE, IS ALLOWED ON THE SITE. 5. AFTER SITE CONSTRUCTION IS COMPLETED AND ACCEPTED BY THE OWNER, IT SHALL BE THE RESPONSIBILITY OF THE OWNER TO MAINTAIN ALL DRAINAGE STRUCTURES. IN ADDITION, THE FOLLOWING INSPECTION AND MAINTENANCE GUIDELINES SHALL BE THE RESPONSIBILITY OF THE OWNER, BEGINNING THE FIRST YEAR PERIOD FOLLOWING CONSTRUCTION COMPLETION AND ACCEPTANCE, AND SHALL BE FOLLOWED EACH YEAR THEREAFTER: APPROVIED BY THE MONTVILLE PLANNING & ZONING COMMISSION 1. DRAINAGE AND/OR OTHER PAVED AREAS: INSPECT ON A REGULAR BASIS NOT TO EXCEED WEEKLY FOR LITTER AND DEBRIS. IF APPLICABLE, SWEEP AT LEAST TWICE A YEAR, WITH THE FIRST OCCURRING AS SOON AS POSSIBLE AFTER FIRST SNOWMELT AND THE SECOND NOT LESS THAN 90 DAYS FOLLOWING THE FIRST. 2. DRAINAGE STRUCTURES (SEDIMENT BASIN): INSPECT SEMI-ANNUALLY AND CLEAN WHEN CHAIRMAN / SECRETARY DATE ONE HALF FULL OF SILT AND/OR DEBRIS. I HAVE REVIEWED THE WETLANDS ON THE PROPERTY IN THE FIELD AND HAVE 3. LANDSCAPE AREAS (SEDIMENT BASIN, VEGETATED SWALE): INSPECT SEMI-ANNUALLY FOR REVIEWED THE WETLANDS AS SHOWN ON THE PLAN AND FIND THAT THEY EROSION OR DYING VEGETATION. REPAIR AND STABILIZE ANY BARE OR ERODED AREAS SUBSTANTIALLY REPRESENT THE WETLANDS AS DELINEATED IN THE FIELD. EROSION & SEDIMENTATION CONTROL PLAN APPROVED BY AND REPLACE VEGETATION AS SOON AS POSSIBLE. THE MONTVILLE PLANNING & ZONING COMMISSION CHAIRMAN / SECRETARY 6. THE TWO LOTS ARE TO BE COMBINED INTO ONE PARCEL PRIOR TO DISTURBANCE OR START OF WORK ON 314 BUTLERTOWN ROAD. 7. A-2 SURVEY PROVIDED ON "RESUBDIVISION LOT 32-6 LINDO AND LACONIELLO SUBDIVISION, PREPARED 1-26-99, BY ROB ROBERT C. RUSSO DATE HELLSTROM LAND SURVEYING" CERTIFIED SOIL SCIENTIST DATE 2 220 218. _ 216" d, - � N MAS/ BATI � 204 .� 202 v0� 'I- 198 M '' 21 L"320 I By 120' 0 so' 120' PROPOSED USE: CONSTRUCTION MATERIALS STORAGE AREA SCALE: 1"=60' APPUCANT: B & W PAVING & LANDSCAPING OWNERS: STEVEN LOGAN AND B & W PAVING AND LANDSCAPING 1 5/20/20 1 5/1/20 10. DATE %1ON GREEN SITE DESIGN REVIEW COMMENTS LLC REVIEW COMMENTS 317 Main Street Norwich, Connecticut REVISION 860 892-1380 Fax 860 886-9165 PROPOSED USE: CONSTRUCTION MATERIALS STORAGE AREA Project No. APPUCANT: B & W PAVING & LANDSCAPING GSD -54 Proj. Engineer E.M.B. 312 & 314 Date: BUTLERTOWN ROAD 3/17/2020 Sheet No. EXISTING CONDITIONS 0 0 00 0 N 0 N N Ln a� lu a Ln n 00 ad N M +J 0 O ry L DI -- ICU 0 Ln F -- W 0 ry —218 j214\ A212/- - 50 UPLAND REVIEW LINE . I • . • �IK I . : . • (� y� �...::� UMIT /Ip CLEARING 208 \ 204 0 BETWEEN SWALE & LIMITS OF CLEARING (TYP.) INSTALL VEGETATED SWALE 0 i SILT FENCE 9Y IIAY8LLE5 I L KED HAYBALES TO BE LIMIT OF CLEARINt �9 190\ ...• —�/ ` v\ � ... � �\\��Jy�� -- 18 BAC INS..T �SILT NCE i 190 i s .. •. 18 4W a �. '�' . IRM BOULDERS AS NE ... .. ::. • 186 .. v r --CONSTRUCT ACCESS D SCALE: 1 "=40' , _ • {,� • . -184 El NG ALL sED �E" � �� �_`, r GREEN SITE �- DESIGN �g2—" i 5/11/20 REVIEW COMMENTS 317 -LLC - 317Main Street Norwich, Connecticut { No. DATE REVISION 860 892-1380 Fax 860 886-9165 APPLICANT. B&W PAVING & LANDSCAPING Project No. PROPOSED USE: GSD -54 CONSTRUCTION MATERIALS STORAGE Proj. Engineer E.M.B. 312 & 314 Date: rN TO B ��-- BI Amo ONE P EL R * r BUTLERTOWN ROADT3/17/2020 7 o DI= �� oR START --OF 1 t Sheet No. i 80 �� �R 314 B ROAD r �9 '9F .4 -^ * SITE PLAN PLACE MODIFIED RIPRAP AT DISCHARGE OUTLET (CT.D.O.T.M.12.02) PUMP DISCHARGE PIPE FLOW IN GEOTEXTILE SILT FENCE o PLACE ON ENTIRE INSIDE FACE WDM. F. E EMMIN VARIES B STAKED AND EMBED HAY BALES IN ACCORDANCE WITH HAY BALE BARRIER STANDARD PROVIDE DIRT BAG — SILT SACK TO PUMP INTO RIPRAP/CRUSHED STONE OUTLET SPILLWAY 6" OUTLET SPILLWAY WEIR 1 4" EMBEDMENT FLAT BOTTOM SECTION A—A NOTE: DIMENSIONS VARY ACCORDING TO PUMPING RATES. MINIMUM REQUIRED STORAGE IS CALCULATED FROM CREST OF SPILLWAY WEIR. CT.D.O.T.-#3 2" CRUSHED STONE OUTLET SPILLWAY WEIR OR GRAVEL (6" DEPTH) 2' 2 MIN. 2 BALE HEIGHT SETTLING BASIN �1 MINUS 6" FLOW OUTLET TO WATERCOURSE OR SWALE DEWATERING SETTLING BASIN DETAIL NOT TO SCALE DEWATERING PLAN IF DEWATERING IS NECESSARY DURING CONSTRUCTION A CLEAR WATER DISCHARGE SHALL BE PROVIDED AS FOLLOWS: A. THE PUMP INLET WILL BE WRAPPED IN FILTER FABRIC AND PLACED IN CRUSHED STONE WITHIN THE TRENCH. B. THE PUMP OUTLET WILL DISCHARGE TO THE DEWATERING ENCLOSURE PER THE DETAIL FOR DEWATERING SETTLING BASIN TO BE LOCATED OUTSIDE OF THE 100' UPLAND REVIEW ZONE. C. THE DISCHARGE FROM THE DEWATERING ENCLOSURE WILL BE MONITORED AND ADDITIONAL MEASURES EMPLOYED IF NECESSARY. SEED MIX FOR SEDIMENTATION BASIN BOTTOM OF SWALE ulnnn nl nn WOOD CHIP BERM NOT TO SCALE 12" 2� 4" LOAM &SEED MIX TO BE PROVIDED AS SPECIFIED IN THE E&S NARRATIVE ON SHEEP 6 12" LINE WITH NORTH AMERICAN GREEN S-150 EROSION MATS PERMANENT VEGETATED SWALE NOT TO SCALE 1 1'-0" (MIN.) RIP RAP CHECK DAM & SEDIMENT CLEANOUT POOL THE NEW ENGLAND EROSION CONTROL/RESTORATION MIX FOR DETENTION BASINS AND MOIST SITES CONTAINS A SELECTION OF NATIVE GRASSES AND WILDFLOWERS DESIGNED TO COLONIZE RECENTLY DISTURBED SITES WHERE QUICK GROWTH OF VEGETATION IS DESIRED TO STABILIZE THE SOIL SURFACE. IT IS AN EXCELLENT SEED MIX FOR ECOLOGICALLY APPROPRIATE RESTORATIONS ON MOIST SITES THAT REQUIRE QUICK STABILIZATION AS WELL AS LONG—TERM ESTABLISHMENT OF NATIVE VEGETATION. THIS MIX IS PARTICULARLY APPROPRIATE FOR DETENTION BASIS THAT DO NOT NORMALLY HOLD STANDING WATER. SOME PLANTS IN THIS MIX CAN TOLERATE INFREQUENT INUNDATION, BUT NOT CONSTANT FLOODING. SEEDING: THE MIX MAY BE APPLIED BY HYDROSEEDING, BY MECHANICAL SPREADER, BY HYDRO—SEEDING OR ON SMALL SITES IT CAN BE SPREAD BY HAND. WHEN APPLYING ON BARE SOIL, RAKE THE SOIL TO CREATE GROOVES, APPLY SEED, THEN LIGHTLY RAKE OVER. IN NEW ENGLAND, THE BEST RESULTS ARE OBTAINED WITH A SPRING OR EARLY FALL SEEDING. SUMMER AND LATE FALL SEEDING WILL BENEFIT WITH A LIGHT MULCHING OF WEED—FREE STRAW TO CONSERVE MOISTURE. LATE FALL AND WINTER DORMANT SEEDING REQUIRE A SLIGHT INCREASE IN THE SEEDING RATE. FERTILIZATION IS NOT REQUIRED UNLESS THE SOILS ARE PARTICULARLY INFERTILE. APPLICATION RATE: 35 LBS/ACRE (1250 SQ. FT./LB.) SPECIES *: SWITCHGRASS (PANICUM VIRGATUM), VIRGINIA WILD RYE (ELYMUS VIRGINICUS), CREEPING RED FESCUE (FESTUCA RUBRA), FOX SEDGE (CAREX VULPINOIDEA), CREEPING BENTGRASS (AGROSTIS STOLONIFERA), SOFT RUSH (JUNCUS EFFUSUS), NEW ENGLAND ASTER (ASTER NOVAE—ANGLIAE), GRASS—LEAVED GOLDENROD (EUTHAMIA GRAMINIFOLIA), GREEN BULRUSH (SCIRPUS ATROVIRENS), BONESET (EUPATORIUM PERFOUATUM), BLUE VERVAIN (VERBENA HASTATA) UPLAND BENTGRASS (AGROSTIS PERENNANS), BIG BLUESTEM, NIAGRA (ANDROPOGON GERARDII), SENSITIVE FERN (ONOCLEA SENSIBILIS), LITTLE BLUESTEM (SCHIZACHYRIUM SCOPARIUM), WOOLGRASS (SCIRPUS CYPERINUS). NOT TO SCALE ITTOM OF SWALE COMPACT SURFACING SLOPE TO MATCH EXISTING MATERIAL BY CHANNEL BANK NOT TO EQUIPMENT TRAVEL. EXCEED 10% 4" AGGREGATE BASE 12" OF 5" RIPRAP OR COARSE -GRADED AGGREGATE GEOTEXTILE FABRIC COMPACTED SUBGRADE SECTION BI - BI PROFILE ALONG CENTERLINE OF LOW WATER CROSSING NOT TO SCALE NOTE: 312 & 314 Sachatello Industrial Drive STORMWATER SYSTEM MAINTENANCE Maintenance Schedule for Stormwater Basins* Activity Schedule • For the Basins and side slopes, inspect for invasive vegetation. Annual • Repair undercut or eroded areas inspection • Inspect for damage, undercut, or eroded area Annual • Monitor for sediment accumulation inspection • Repair undercut or eroded areas. As needed 317 Main Street Norwich, Connecticut maintenance • Clean and remove debris from basins, and their inlets and outlets No. Date • Inspect and clean debris and sediments Revision • Clean and remove debris from the riprap level spreaders & Semi-annual stone/woodchip berms • Mow side slopes once per year. High vegetation along basin edge Project will discourage waterfowl from taking up residence and serve to filter '��'� pollutants. OAKDALE, CT. *Provide report to the Town of Montville after each of the first two years after completion. Plant survival shall be 70% or greater after the first year and 80% or greater after the second year. Maintenance Schedule for Vegetated Swale Activity Schedule • Inspection for sediment buildup and erosion Semi -annual • Repair undercut or eroded areas As needed maintenance • Clean and remove debris from check dams/pools Frequent (3-4 times/year) maintenance 2"x2"x48" WOOD STAKE TOP OF BANK BOTTOM OF BANK SLOPE IN CUT SECTION SHOULD MATCH VICINITY NOT TO EXCEED 4:1 AND OVERLAY WITH EROSION CONTROL BLANKET ROCK SECTION OF THE C SHALL SPAN ACROSS THE IzN I IKt CHANNEL 12" MIN. FILTER FABRIC WITH WOVEN WIRE FENCE, INDUSTRIAL NETTING, OR SNOW FENCE FOR SUPPORT COMPACTED BACKFILL FLOW I NATIVE SOIL SILT FENCE SECTION NOT TO SCALE Q PLAN VIEW OF LOW WATER CROSSING NOT TO SCALE 1. CROSSINGS SHALL HAVE THE TOP -MOST SURFACE LAYER EVEN OR BELOW THE ELEVATION OF THE EXISTING GRADES. 3. THE ACCESS ROAD SHALL CROSS THE CONVEYANCE AT 90" ANGLE. 4. THE TOP BED OF THE ROCK CHANNEL CROSSING SHALL CONFORM TO THE EXISTING DITCH CROSS SECTIONAL SLOPES. 5. MATERIAL THICKNESSES MAY BE FIELD ADJUSTED TO ACHIEVE SUFFICIENT BEARING CAPACITIES AS ARE NECESSARY FOR ANTICIPATED ROAD USE. LOW WATER CROSSING MODIFIED RIPRAP TTOM OF BANK ENTERLINE OF FLOW OF BANK f FENCE (TYP.) LE EROSION CONTROL &SEDIMENTATION NARRATIVE CONSTRUCTION SEQUENCE 1. PRIOR TO THE INSTALLATION OF ANY EROSION AND SEDIMENT CONTROL MEASURES, THE OWNER AND CONTRACTOR SHALL MEET WITH THE TOWN OF MONTVILLE ZONING ENFORCEMENT OFFICER. 2. THE EROSION AND SEDIMENT CONTROL MEASURES SHALL BE INSTALLED PRIOR TO SITE DISTURBANCE. ADDITIONAL EROSION & SEDIMENT CONTROL MEASURES SHALL BE INSTALLED IF DETERMINED TO BE NECESSARY BY THE ZONING ENFORCEMENT OFFICER. 3. THE CONTRACTOR SHALL CONTACT THE ZONING ENFORCEMENT OFFICER FOR INSPECTION OF THE SEDIMENT AND EROSION CONTROL MEASURES, PRIOR TO SITE DISTURBANCE. CONSTRUCTION SHALL NOT BEGIN UNTIL SUCH TIME AS THE WETLANDS OFFICER HAS REVIEWED AND APPROVED THE INSTALLATION OF THE SEDIMENTATION AND EROSION CONTROL MEASURES. 4. CONTRACTOR TO INSPECT ALL EROSION AND SEDIMENT CONTROL MEASURES AT LEAST WEEKLY AND AFTER EVERY STORM EVENT AND REPAIR AND MAINTAIN AS NECESSARY. 5. CLEARING AND GRUBBING OF THE AREA TO BE GRADED. TOPSOIL TO BE REMOVED AND STOCKPILED IN AN AREA AS SHOWN ON THE PLANS. 6. INSTALL SEDIMENTATION BASINS & VEGETATED SWALES 7. STAKED HAY BALE SILT BARRIERS OR SILT FENCE SHALL BE INSTALLED AROUND ANY TEMPORARY STOCKPILE AREAS. 8. ROUGH GRADE THE STORAGE AREA & DRIVEWAY 9. FINISH GRADE THE STORAGE AREA & DRIVEWAY AND INSTALL ASPHALT MILLINGS 10. INSTALL WETLANDS CROSSING DURING THE DRY SEASON, JULY OR AUGUST. 11. INSTALL LOAM ON ALL DISTURBED AREAS. 12. ALL DISTURBED AREAS SHALL BE SEEDED AND MULCHED. ALL EROSION AND SEDIMENTATION CONTROL MEASURES SHALL REMAIN IN PLACE UNTIL VEGETATION IS RE—ESTABLISHED. 13. SEEDING SHOULD TAKE PLACE BETWEEN APRIL 1 AND JUNE 1 OR AUGUST 15 AND OCTOBER 1. 14. THE FOLLOWING SEEDING MIXTURES SHALL BE PROVIDED ON ALL DISTURBED AREAS: CROWN VETCH 15 LB's/AC PERENNIAL RYEGRASS 10 LB's/AC 15. UNFORESEEN PROBLEMS WHICH ARE ENCOUNTERED IN THE FIELD SHALL BE SOLVED ACCORDING TO CONNECTICUT GUIDELINES FOR SOIL EROSION AND SEDIMENT CONTROL. 16. SITE CONTACT: JIM WRAY 860-235-2846 I frl\YIVVJ 1 ILI LI\ 1 /`1U(\IV LEVEL SPREADER * IN ACCORDANCE 02WITH NOT TO SCALE SECTIOOF D.O.T. FORM 817 2" BITUMINOUS CONCRETE MILLINGS WIDTH VARIES ACCESS DRIVE NOT TO SCALE GREEN SITE DESIGN LLC -- 1 5 11/20 REVIEW COMMENTS 317 Main Street Norwich, Connecticut No. Date Revision (860) 892-1380 Fax (860) 886-9165 312 & 314 BUTLERTOWN ROAD Project 011�,�, '��'� OAKDALE, CT. Gsn 54 Proj. Engineer E.M.B. F B&W PAVING & LANDSCAPING CONSTRUCTION MATERIALS STORAG Date: APR. 2020 Sheet No. 0 83b6 �` GtSTE�� � C�`